  • ISEE
    Implementation of Blast Vibration Frequency Control Technology at R & F Coal Company

    By Doug Johnson

    This paper reviews the field implementation of R & F Coal's blasting optimization work concerning analysis, prediction, and control of overburden blasting vibrations using site specific measurements a

    Jan 1, 1988

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

    Feb 1, 2020

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • ISEE
    Use of Electronic detonators to control blast vibrations – a cautionary tale

    By S. Hosein, W. Birch, C. Johnson

    The widespread adoption of electronic detonators has given rise to the development of linear superposition to control the environmental impact on both third-party properties and residents resulting fr

    Jan 1, 2024

  • ISEE
    Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock Mines

    By Reinhold Daykin, Piers Wendlandt, Nathan Rouse

    Drilling and blasting are key components of every hard-rock (i.e., metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the ove

    Feb 1, 2020

  • ISEE
    Comparison of the Non-Ideal Shock Energies of Sensitised and Unsensitised Bulk ANFO-Emulsion Blends in Intermediate Blasthole Diameters

    By E. Vilaescusa, J. Eloranta

    The work presented in this paper investigates the influence of non-ideal detonation characteristics related to the blasthole diameter, base emulsion sensitivity (micro-balloon sensitised versus unsens

    Jan 1, 2012

  • ISEE
    Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial Establishment

    By Dipankar Gorain, A K. Vishwakarma, Vivek K. Himanshu, Murari P. Roy, Shubham Singh, R S. Yadav

    The industrial establishments of a power plant consist of many important structures viz. cooling tower, wagon tippler, track hopper, plants and offices. The leveled foundation is the utmost need for e

    Feb 6, 2023

  • ISEE
    Experimental Studies to Investigate Pressure Loading on Target Plates

    By T Duff

    This paper describes results from small scale tests conducted to determine the distribution of pressure on target plates when subjected to loading due to the detonation of a buried mine in various med

    Jan 1, 2014

  • ISEE
    The Influence of Blast Fragmentation on Loadability in Sublevel Caving

    By Daniel Johansson, Markus Danielsson, Håkan Schunnesson

    In sublevel caving, blasted material flows gravitationally into the drawpoint from above in a periodical manner. This type of flow behavior entails muck pile conditions that are variable along the cou

    Jan 1, 2018

  • ISEE
    Electronic Initiation Applications at Barrick Goldstrike's Meikle Mine

    By Ray Slavin, Remi Proulx

    The Meikle Mine is a mature underground gold mine utilizing primary and secondary longhole open stoping method with delayed backfill. Combined production with the newly developed Rodeo Mine is 4700 to

    Jan 1, 2004

  • ISEE
    Effect of Detonating Cord Downline on Explosive Energy Release

    By S Lukovic, Vishwa Bhushan, Calvin J. Konya

    Effect of each of these variables has been well characterized for ANFO. This paper presents results of underwater energy measurements for one watergel and one emulsion type of slurry explosive which w

    Jan 1, 1986

  • ISEE
    Fragmentation Improvement Through the Application of Explosive Charge in the Stemming for the Reduction of Oversize in High Hardness Rock

    By Gustavo Huerta Valer, Jorge Cárdenas Miranda, Johan Salas Flores

    One of the challenges of mining is the optimization of the blasting process, which has an important impact downstream in the processing of crushed ore in the plant, that is why mining companies ensure

    Feb 6, 2023

  • ISEE
    Journal: Old South Pole Demolition

    By John Horgan, Ethan Marcoux

    Explosives have been used to demolish many unsafe structures around the world. However, it is unlikely any demolition job has ever involved destroying buildings already buried 40 feet (12 meters) into

    Jan 1, 2015

  • ISEE
    Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical Simulation

    By A. Vishwakarma, V. Himanshu, K. Dey

    Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method

    Jan 1, 2024

  • ISEE
    Performing decking with the use of an inflatable plug in high or total submergence applications in blastholes to improve final wall profile & stability

    By Glenn Tobin

    The overarching goal in modern drill and blasting operations is that of optimising mining operations to achieve higher levels of productivity, safety, profitability and sustainability. Air decking, a

    Jan 1, 2012

  • ISEE
    An Explosive Delivery System implementation in the Steep Gullies at the Arapahoe Basin Ski Area

    By Mark Bosse

    This is a paper demonstrating the use of a fixed wire and trolley system to deliver 2 or 5 lb cast primers (with 2 meter cap/fuse assemblies) deep into avalanche terrain. This avalanche terrain is mi

    Feb 1, 2020

  • ISEE
    Structure Responses to a Confined Opening Cut Blast, Sumterville, FL

    By Jeff Senules, Oana Meins, Catherine Aimone-Martin, Scott Lanker, Brent Meins

    Global wall strains from 4 to 77 micro-strains were measured at three structures adjacent to a highly-confined Florida quarry blast when PPV amplitudes ranged up to 6.05 in/s. Increasing the peak zero

    Feb 1, 2020

  • ISEE
    Identification & traceability of civil explosives in Europe

    By Ashley Haslett

    A European Directive on Identification & Traceability of explosives came into effect on the 4th of April 2008. This directive is intended to establish a harmonised system for the unique identification

    Jan 1, 2010

  • ISEE
    Better Fragmentation Through Team work At Dos Pobres Mine Safford, Arizona

    By Denard Brandt, Isidro Martinez, Greg Baker, Laura Slattery, Teddy French

    The Dos Pobres Mine is a copper oxide heap-leach mine located near Safford, Arizona. Mine production is 180,000 tons (163,293 tonnes) per day with a stripping ratio of 2:1. During the startup phase of

    Jan 1, 2010

  • ISEE
    Kuz-Ram Equation Analysis: A Reparametrization for the Peruvian Case

    By Dennys Huaman, Carlos Rojas

    Using the Levenberg-Marquardt algorithm to reparametrize the Kuz-Ram original model equation of the mean characteristic size and assess the errors of both models and their comparisson using different

    Feb 1, 2020