Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    The Seismic Visibility of Mining and Its Implications with Regard to the Comprehensive Test Ban Treaty

    By Frank Chiappetta, Karl Zipf, Robert Hopler, Brian Stump, Francois Heuze, Bob Martin, Vindell Hsu, William Walter, Craig Pearson

    The Comprehensive Test Ban Treaty (CTBT) was accepted for signature at the United ,Nations in September of 1996. It ‘now awaits ratification by its signatories, ~including the United States. After the

    Jan 1, 1998

  • ISEE
    Perimeter Blasting in Underground Mining

    By Paul Sterk

    In underground mining a great deal of time, money, effort, and resources have been used in the effort to minimize blast-induced damage. This damage occurs to the back, ribs, and pillars when the energ

    Jan 1, 2003

  • ISEE
    Tell Me Professor Richter -- How Much Did They Shoot?

    By Douglas A. Anderson

    It is quite common for people exposed to blast vibrations to ask questions such as "How big was that blast on the Richter Scale?" Although it is tempting to dismiss such questions out of hand, for the

    Jan 1, 1994

  • ISEE
    Practical Experiences with the Use of Air-Decks in Quarry Blasting

    By Peter Moser, Frank Chiapetta, Sacha Diaj, Florian Bauer

    Good toe breakage and a flat working bench after blasting are important parameters to achieve a high productivity during material loading and reduce the necessity for secondary blasting. Good toe brea

    Jan 1, 2009

  • ISEE
    The Development of Methods for Minimizing the Overbreak in Tunnel Blasting

    By Dong-Hyun Kim Kim, Tai-Ro Lee, Young-Hwa Seo

    Overbreak occurred inevitably in a tunnel excavation, is the main factor for increasing cost and period in tunnel projects. Furthermore the damage to the remaining rock mass related to the overbreak c

    Jan 1, 2003

  • ISEE
    Explosive Use for Avalanche Control

    By Don Bachman, Larry Heywood

    Artificial release of snow avalanches, through the use of explosives, is a necessary component of safety planning and operations for ski areas throughout the Western United States, as well as in other

    Jan 1, 1999

  • ISEE
    The Influence of Oxygen Content and Surroundings on the Heats of Explosion and Detonation of Organic Explosives

    By Edward Barrody

    There are wide variations in the values of heats of explosion and detonation as reported in literature. These values are not “stand-alone” or sole properties of the explosives. Specifications of the c

    Jan 1, 2003

  • ISEE
    Innovative Methods of the Use of Explosives and Non-Explosive Demolition Methods in Sensitive Areas; Non-Explosive Demolition Agents to Enhance Profit Margins in Difficult Rock or Concrete Removal Projects

    With the ever increasing problems of narrowing profit margins, and increased liability, a solution/option to SEE members is needed. It is essential that all members understand the benefits of utilizin

    Jan 1, 1995

  • ISEE
    New Training Technologies (Interactive Video)

    By Roger Scarr, Richard A. Walker

    Interactive video is the combination of computer and laser disc -technologies that allows for the storing of 54,000 single images or 30 minutes of video with the ability to access any segment or singl

    Jan 1, 1990

  • ISEE
    Drill Accuracy

    By Jerald E. Harris

    "Often taken for granted, drill accuracy plays a major role in the relative success or failure of a blast.Expensive technological advances in equipment capabilities, drilling tools, communications, ex

    Jan 1, 1999

  • ISEE
    Preparing a Written Blast Plan (1b8a88a8-1e7f-429f-bd71-b32f7b3dbf86)

    By David Ziegler

    A formal blast plan is sometimes required for projects involving rock excavation. A written blast plan submitted with a bid proposal can also be an important sales tool. A blast plan will cover the ba

    Jan 1, 2003

  • ISEE
    A Study of Misfires in Mining

    By Larry R. Fletcher

    A misfire results when explosives fail to detonate as planned during a mine blast. Accidental detonation of misfires is a frequent cause of personal injury, equipment damage, and lost production. In a

    Jan 1, 1983

  • ISEE
    Journal: 21st Annual Photo Contest - Best of Show "Pinkerton Tunnel Open Cut Project"

    By Michael Weaver, Dale L. Ramsey

    The Pinkerton Tunnel open cut project is part of the National Gateway Clearance Initiative improvement project to achieve a minimum of 21 feet of vertical clearance along CSX Transportation rail corri

    Jan 1, 2015

  • ISEE
    Optimization of Development Drilling and Blasting in an Underground Mine

    By B Mohanty, G Ludwig

    A thorough assessment of development drilling and blasting practice was carried out at two underground mines at INCO operations in Thompson, Manitoba. The study showed that significant improvement in

    Jan 1, 1998

  • ISEE
    Journal: Who Moved My Explosives Cheese? A Commentary on the Ammonium Nitrate Age in the Security Age

    By John Brulia

    It has been said that the only thing that remains constant is change. After more than 33 years in the explosives industry, I do not take any exception to that adage. I have seen changes in people, cha

    Jan 1, 2008

  • ISEE
    The Mechanics and Physics of Electronic Blasting

    By H. Rossmanith

    This contribution introduces the fundamental concepts of wave propagation and fracture mechanics which form the basis of electronic blasting, i.e. precise initiation timing using electronic detonators

    Jan 1, 2003

  • ISEE
    Journal: Safety Talk / Determining The REAL Cost of An Accident

    By Mark Abernathy

    When most people think of a motor vehicle accident, the direct costs resulting from that accident, such as vehicle repair or towing charges, are generally easy to quantify. However, the indirect costs

    Jan 1, 2006

  • ISEE
    The Potential for Unifying Drilling, Blasting and Downstream Operations by the Application of Technology

    By Lyall Workman

    "Many new technologies, useful to the mining and quarrying have recently come to market. Some are applicable to drilling and blasting operations. Others apply to subsequent mining unit operations and

    Jan 1, 2001

  • ISEE
    Effect of Surface Roughness of Charge Hole on Detonation

    By Fumihiko Sumiya, Kunihisa Katsuyama, Yuji Ogata, Yuji Wada, Yukio Katoh, Yoshikazu Hirosaki

    In our previous work, the results of photographic observation using a high speed framing camera showed that the difference between precursor air shock wave velocity and detonation velocity was primary

    Jan 1, 1996

  • ISEE
    Operating Improvements at Vulcan Materials McCook Quarry using Electronic Detonators

    By Nick Lewis, Paulo Pereira

    The Vulcan McCook quarry has been in operation for about 100 years. It is located about 17 miles from downtown Chicago and is surrounded by both industrial and private structures. Recent issues have f

    Jan 1, 2003