Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Controlling Thermal Stresses in Barrier Walls
By Karsten Beckhaus
Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee
Sep 8, 2021
-
Slurry Trench Design and Construction in Difficult Conditions (5812dfc0-6c6e-4d3d-988d-069d8f606655)
By Peter Deming
"PART 1 OF 2INTRODUCTIONSlurry trenches are the least cost hydraulic barrier available, if the excavated spoils can be recycled into backfill. As such, slurry trenches are constructed where possible,
Jan 1, 2006
-
The Bow, Encana: Design, Monitoring, And Results Of A Deep Excavation In Downtown Calgary
By Matthew Janes
The new Bow office complex will become the new headquarters of EnCana Corporation, a leading Canadian oil and gas company. The shoring system, encompassing nearly two city blocks and excavated to a d
Jan 1, 2008
-
Dulles Metrorail/Silver Line (Phase 2) Drilled Shaft Lateral Load Testing Program
By William Billiet
"The Dulles Silver Line Phase II is an 11.4 mile extension of the Washington Area Metro Transit Authority’s Silver line in northern Virginia. There are three miles of elevated guideway, which are supp
Jan 1, 2017
-
Development Of Vertical-Horizontal Yield Envelopes Of Pile Group Supported Bridges Subjected To Scour
By Aditi Sharma, Sumanta Haldar
Scouring of soil is the major concern forthe various hydraulic structures built in the flowing rivers since scouring impacts the bearing capacity of foundations. Hence, consideration of scouring in th
Sep 1, 2022
-
Skin Friction Of Excavated Piles In Weathered Granite - Synopsis
By K. K. S. Ho
In Hong Kong the design of excavated piles in weathered granite has conventionally been based on a rule-of-thumb which relates the allowable base bearing capacity to the SPT N value, with no allowance
Jan 1, 1996
-
Engineering Practice Of Ground Improvement ? Introduction
By H. R. Taber
The extensive subject area "Engineering Practice of Ground Improvement" will be treated within the limitations of space and the writer on the basis of personal practice and experience?largely in North
Jan 1, 2010
-
Sustainability Simply Makes Sense
By Gerald Verbeek
There are certain concepts that seem to invite responses from some, including some in the foundation industry and even some within DFI, that are at best surprising. Business owners and their employees
Nov 1, 2022
-
Effect of Sand Density on Load Sharing Mechanism of Piled Raft Foundation
By Rouzbeh Vakili, Adel M. Hanna
"The application of piled raft foundations has significantly increased during the last few years. In this system, the raft and the pile group collectively transfer the applied building load to the und
Jan 1, 2017
-
Deep Drilling at Mica Dam, British Columbia
By Douglas G. Baker, Jason K. Braund-Read, Megan R. Sheffer
"Mica Dam, owned by British Columbia Hydro, is an 820 ft high earthfill embankment dam that was completed in 1973. The dam consists of a thin central impervious till core supported by upstream and dow
Jan 1, 2017
-
TBM Recovery Shaft Construction - SR-99 Tunnel
By Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
Micropile Performance Variability: A Fundamental Case Study
By Walter E. Vanderpool
Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.
Jan 1, 2002
-
Change In Bearing Capacity Of Bored Steel H Piles Enclosed In Soil-Cement Columns With Overburden Pressure - Synopsis
By Tomio Tsuchiya
A construction method of bored steel H piles enclosed in soil-cement columns was developed by modifying steel H piles from the driven pile method and soil-cement walls from the earth retaining wall me
Jan 1, 1996
-
Alameda Corridor-East: San Gabriel Trench Project
By David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017
-
Evaluating Installation Disturbance of Helical Anchors in Clay from Field Vane Tests
By John Erikson, Alan J. Lutenegger, Nicholas Williams
"In order to evaluate the level of disturbance produced in clays during installation, a series of single-helix and multi-helix anchors were installed at a test site consisting of a stiff overconsolida
Jan 1, 2017
-
Automated Pile Load Test Monitoring
By Joel L. Volterra
Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site
Jan 1, 2008
-
Evolution Of Helical Screw Pile Design And Installation
By Michael Perlow
Helical screw piles in use since 1838 are routinely used for energy, transportation, municipal, industrial, marine and coastal infrastructure as well as for excavation support, environmental remediati
Jan 1, 2011
-
Innovative Grouting Techniques for Installation of a Seepage Barrier at Barrage Des Quinze Dam (Quebec, Canada)
By Danny Déry-Chamberland, Peter Bowman, Michael Byle
"The Barrage des Quinze dam is a concrete sluice dam consisting of 19 spillway sections, each of which is approximately 7.6 metres wide and 14.5 metres deep. Rehabilitation efforts being performed on
Jan 1, 2016
-
Installation Of Augered Cast-In-Place Piles
By Michael Moran
Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:
Jan 1, 2005
-
Deep Foundation Ground Anchors In The Wind Energy Industry - Current Status Of Design And Construction Practices And Introduction Of A Patented System To Improve Foundation Performance
By Josef K. Alter
Long-term performance and behavior of post-tensioned ground anchors subjected to axial cyclic loading constitutes an important aspect of the stability, reliability and overall performance of wind turb
Jan 1, 2010