Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Deep Mixing Core Data from LPV 111

    By Donald Bruce, Alex Reeb, George Filz, Wesley Schmutzler, Mitsuo Nozu

    "One million seven-hundred thousand cubic yards of deep mixing were installed to support an elevation raise of an earthen levee known as LPV 111, which is located in east New Orleans. The deep mixing

    Jan 1, 2015

  • DFI
    Improvement Of Toe Resistance Of Drilled Shaft Foundations Using Smart Cells

    By Mario A. Terceros Herrera, Mario Terceros Arce, Antonio Marinucci

    A Smart Cell is a closed-type tip post-grouting device that is attached to the bottom of the steel reinforcement cage of a drilled shaft and is used to enhance performance and to reduce uncertainty th

  • DFI
    Elimination of Environmental Footprint: LVCC Expansion - Foundation Installation

    By Zachary Q. Maassen

    Upon approval from the Las Vegas Convention and Visitors Authority (LVCVA), Turner/Martin Harris, A Joint Venture began construction on the estimated $860 million expansion for the Las Vegas Conventio

    Jan 1, 2019

  • DFI
    Discussion of Differences in Design Methodology between Granular and Grouted Inclusions

    By Brandon Buschmeier, Frederic Masse

    "Inclusions are a type of ground improvement that provide an improvement of a soil mass by insertion of a material with better characteristics than the surrounding soils. There are primarily two types

    Jan 1, 2015

  • DFI
    PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation Subcontractors

    By Alexander Filotti, Richard Kalson

    "1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti

    Jan 1, 2017

  • DFI
    Selecting the Right Shoring System – San Francisco Experience

    By Heinrich Majewski, Rob Jameson

    "Careful review of site conditions and constraints is essential to select the appropriate shoring system for each project. Key evaluation criteria include the geotechnical profile, groundwater and env

    Jan 1, 2017

  • DFI
    Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor Area

    By Henry H. Tayler, Eric Sturel

    1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat

    May 1, 2022

  • DFI
    Experimental Studies On Behaviour Of Single Pile Under Combined Uplift And Lateral Loads

    By K. Madhusudan Reddy

    Pile response under combined uplift and lateral load is very important and it is imperative to evaluate the effect of combined loading and only few studies were reported on pile behavior under combine

  • DFI
    The Use of DSM Columns to Control Heavy Haul Railway Embankment Stability

    By Kim Chan, Bryn Thomas, Ben Dening

    "Increased rail capacity is required into Kooragang Coal Terminal near Newcastle, NSW, Australia to relieve rail traffic congestion and improve management of train arrivals. An additional arrivals tra

    Jan 1, 2015

  • DFI
    Systematic Evaluation of Driving Criteria and Performance of Tapered Piles in Glacial Sand

    By Terrence M. Carroll, Chu E. Ho, Dimitrios Niarchos

    "Construction of the new extension to Terminal 4 at John F Kennedy International Airport in Queens, New York involved the application of tapered piles for foundation support. Initial design based on p

    Jan 1, 2017

  • DFI
    The Advantage Of Measurement While Drilling (Mwd) For Geotechnical Site Characterization

    By Anahita Modiriasari, Benjamin S. Rivers

    Measurement while drilling (MWD) is a subsurface exploration technique associated with real-time and continuous monitoring and recording of drilling data during the drilling process. This technique ca

    Oct 1, 2022

  • DFI
    Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity Profiling

    By Garland Likins, Gray Mullins, George Piscsalko

    "Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or

    Jan 1, 2016

  • DFI
    Remediation Of Rail Structures Impacted By Landslides Using Sleeved Bored Piles

    By Paul Hewitt, Aaron Rastall

    The New South Wales South Coast rail corridor is key infrastructure for both freight and passenger transport. Geomorphological and geological evidence suggests that land instability has been widesprea

    Nov 1, 2022

  • DFI
    Cost and Technical Comparison of Non-Destructive Test Methods for Drilled Shafts

    By Ronnie Melker, Joel Webster, Daniel Belardo, Thomas Hyatt

    Quality assurance of drilled shafts is highly dependent upon the construction practices used during the excavation and concrete placement process. When performed under slurry, challenges are presented

    Jan 1, 2019

  • DFI
    Stability Assessment of a Deadman Anchor Pile Close to the Bulkhead Wall

    By WenJun Dong

    This paper presents the stability assessment of the steel pipe piles that are used to support a deadman beam to anchor an adjacent bulkhead wall. Finite element analyses are performed to assess the st

    Sep 8, 2021

  • DFI
    The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff Wall

    By Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers

    Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM

    Jan 1, 2019

  • DFI
    Foundation Rehabilitation of the Henry Hudson Bridge

    By Dharmil S. Patel, Zoyav S. Benyaminov, Cassandra A. Wetzel

    Rehabilitation of the Henry Hudson Bridge is nearing completion, connecting Spuyten Duyvil in the Bronx to Inwood Hill in Manhattan, New York. Constructed in 1936, the Henry Hudson Bridge spans 840 fe

    Sep 8, 2021

  • DFI
    Case Studies Demonstrating The Effectiveness Of Vibroreplacement Stone Columns In Variable Soil Types

    By Lee R. Buhagiar

    As a result of the increased seismic risk and the highly variable geology of Christchurch, finding costeffective foundation solutions has been a challenge for the Canterbury rebuild. The soil profile

    Nov 1, 2022

  • DFI
    Seismic Analysis Of Drilled Shafts As Earth Retaining Structure Based On Site Characterization

    By Bernardo J. Jiménez Vega, Edy L. T. Montalvan

    During the last phase of the Circunvalacion Norte project in San Jose, Costa Rica, preliminary designs for an underpass structure of over 16 km (10 miles) considered drilled shafts as an earth retaini

    Oct 1, 2022

  • DFI
    Marine Prefabricated Vertical Drains for the Craney Island Eastward Expansion (c2c7d75f-a035-4e5c-9df5-e768ce1a9e85)

    By Mohamed Mekkawy, William W. Wheaton, Ira Brotman

    "The Virginia Port Authority and the U.S. Army Corps of Engineers are partnering to construct the Craney Island Eastward Expansion (CIEE) to meet the dual purpose of extending the life of Craney Islan

    Jan 1, 2017