Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Cofferdam Failures ? Introduction

    By Richard J. Hartman

    This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p

    Jan 1, 1987

  • DFI
    A Numerical Study On Behavior Characteristics Of Steel-Concrete Composite Drilled Shafts

    By Hyu-Soung Shin

    This study is concerned with the characteristics of the behavior of steel-concrete composite drilled shafts, a material that is used for large bridge foundations, and especially for weak submerged gro

    Jan 1, 2007

  • DFI
    Drilled Shaft Design For Noise Wall Barriers Along I-20 In Columbia, SC

    By Anil Bhandari

    Using subsurface data collected at each drilled shaft location is an ideal approach for conducting drilled shaft design. However, conducting subsurface tests at each drilled shaft location and subseq

    Jan 1, 2011

  • DFI
    An In-Situ Model Test For A Large Hydraulic Press Foundation ? Synopsis

    By R. J. Yan

    There was a plant equipped with a 32000t Hydraulic Press to be built, under which a box foundation of 22.5m x 15m x 14.25m (depth) with a base slab of, varying thickness was proposed. The subgrade rea

    Jan 1, 2010

  • DFI
    Experimental Investigation on the Lateral Load Capacity of Monopiles in Dense Sand

    By Kenneth Gavin, Weichao Li, Paul Doherty

    "The lateral load capacity is one of the most important issues to be considered in designing piles to resist berthing loads, ship impact forces and for monopiles used in the offshore wind sector. A nu

    Jan 1, 2015

  • DFI
    Session 25 "Grout Mixtures and Materials I"

    By Stephan Jefferis

    It is my understanding that the Scandinavians have done some fundamental work on durability. I have seen a study published whereby the author, Helen Anderson, comments on the durability of polyurethan

    Feb 10, 2003

  • DFI
    Driving and Extraction of Steel Pipe Piles in Nearshore Environment

    By Jim Rix, Ken Been, Nihal Bohra, Anthony Rice, Juan Lopez

    "A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the br

    Jan 1, 2017

  • DFI
    Driving And Extraction Of Steel Pipe Piles In Nearshore Environment

    By Nihal Bohra

    A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the bre

  • DFI
    Proceedings Of Earth Retention Systems 2003: A Joint Conference - Earth Retention Systems In The Urban Environment - Special Considerations

    By George J. Tamara

    The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence

    Jan 1, 2003

  • DFI
    Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis

    By D. K. ] [Gupta

    The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and

    Jan 1, 1996

  • DFI
    8000 Series Piling Rig

    By Roger A. Bullivant

    The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar

    Jan 1, 1995

  • DFI
    Geotechnical Monitoring Of Deep Shoring Adjacent To Train Infrastructure

    By Jakub Szary

    Excavation and shoring adjacent to the above-grade Gilmore train station and elevated guideway was undertaken in 2019. A perimeter secant pile cut-off wall was constructed to a depth 37 m (121 ft) bel

    Sep 1, 2022

  • DFI
    Innovative Drilled Shaft Installation Process Through Existing Bridge Foundations

    By Tracy Brettmann

    The Highway 146 Bridge Expansion Project across the Clear Creek Channel in Houston, Texas was designed on driven precast concrete piles. However, during construction, the piles along one side of the b

    May 1, 2022

  • DFI
  • DFI
    Underpinning Historic Museum for U-505 Submarine Relocation

    By Goudschaal Mark R.

    "The Museum of Science and Industry U-505 Submarine Relocation project in Chicago, IL consisted of building an underground reinforced concrete vault (37' deep) for the Museum's new U-505 exhibit. This

    Jan 1, 2005

  • DFI
    Behaviour Of Piled Raft- Importance Of Observational Study

    By Abhirami B., V. Balakumar

    Piled raft foundation system is an intelligent geotechnical concept, developed towards reducing the settlement of the raft and the footings by providing pile elements below the raft or footings, as th

    Nov 1, 2022

  • DFI
    Design and Construction of the New VDOT Midtown Tunnel

    By Rick Ellman, Ian Chaney

    "The Hampton Roads area encompassing the Norfolk, Virginia Beach and Newport News metropolitan region experiences some of the worst traffic congestion in Virginia. With continued growth of the ports a

    Jan 1, 2014

  • DFI
    Guidelines for Soil Mixing

    "1.0 INTRODUCTIONThese Guidelines reflect the state-of-the-practice of the Deep Mixing Method (DMM) in North America. DMM is an in situ mixing process that breaks down the soil structure; injects bind

    Jan 1, 2016

  • DFI
    SIMBAT Dynamic Pile Testing - Results of an Independent Pile Capacity' Prediction Event

    By Richard T. Stain

    "In 2001, a pile trial site was established at Limelette in Belgium consisting of 25 displacement screw piles and 5 driven pre-cast piles. Interested parties were invited to participate in a pile pred

    Jan 1, 2005

  • DFI
    Drilled Shaft Inspector's Manual - 1.0 General - 1.1 Scope And Limitations

    The intent of this manual is to provide guidelines for inspectors of drilled shaft construction otherwise referred to as drilled piers, caissons or bored piles. It should also be helpful to train begi

    Jan 1, 2004