Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Voisey?s Bay Project2002 ? 2006

    By Dave Stefanuto

    Voisey?s Bay Project Components ? Mine/Mill Port In Labrador ? Mini Plant in Mississauga ? Demonstration Plant in Argentia ? Supply Vessel (Umiak1) ? Transshipment Facility (Quebec) ? Concentr

    May 1, 2006

  • CIM
    Transferring new technologies to operations

    By Michel Lefebvre, André Piché

    Every organization performing R&D is faced with the challenge of introducing new technologies to its operations. Difficulties must be overcome if companies are to realize the benefits anticipated from

    Jan 1, 1997

  • CIM
    Slurry Pump and Pipeline Performance Testing at the Georgia Iron Works Hydraulic Laboratory

    By G. R. Addie

    "In February, 1975, the President of Georgia Iron Works Company, Mr. Tom Hagler decided to build a new hydraulic laboratory to water performance test all of the companies' centrifugal slurry pumps.Equ

    Jan 1, 1980

  • CIM
    Global Requisitioning Suite (GRS) Completing the Requisitioning Cycle

    By Kevin Bell

    About Beltek Inc. For more than a decade Beltek, Inc. has been working with national and international organizations to harness and deliver solutions which gain real ebusiness advantages in today&apos

    May 1, 2004

  • CIM
    Humus and till geochemistry over the Doyon, Bousquet and Williams gold deposits

    By C. F. Gleeson, D. G. Sheehan

    "The results of humus and overburden geochemical surveys over the Doyon, Bousquet and Page-Williams gold ore deposits are presented.These studies show that humus sampling for gold gives negative resul

    Jan 1, 1987

  • CIM
    The Next Milestone . . . . . .AccessDirectTM

    By Frank G. Wickert

    One key to maintaining successful mining operations in today?s global economy is in having the ability to access real-time machine operating data ([1] G. Brown, B. Ebacher, W. Koellner,2000)([2] Broch

    May 1, 2002

  • CIM
    Fractured Bedrock Investigation by Using High-Resolution Borehole Images and the Distributed Temperature Sensing Technique

    By R. Charlier, G. Radioti, J. -P. Radu, S. Delvoie, F. Nguyen

    "In order to investigate the fracturing of the bedrock and its possible heterogeneous distribution in situ, four boreholes equipped with double-U geothermal pipes of 100 m long were installed on the c

    Jan 1, 2015

  • CIM
    The integration of condition monitoring into the maintenance process (16e8fde4-e738-4229-a500-8c29dcc904ed)

    By M. W. Lewis, J. Werner

    Fluctuating metal prices, declining head grade, and increased operational costs are forcing many open pit mining companies to look to their balance sheets for significant cost reductions in order to r

    Jan 1, 2005

  • CIM
    The Use of Enhanced Gravity Concentration for Precious Metal Recovery

    By Steve McAlister, Colin Sprake

    "Enhanced gravity concentration machines have been applied successfully in the following areas of precious metal recovery flowsheets:1. Primary Grinding Circuits2. Shaking Table Tailings3. Pre-Concent

    Jan 1, 2003

  • CIM
    Developing Breakthrough Solutions to Complex Metallurgical Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate process plants requiring high throughputs presents unique metallurgical environmental and sustainability challenges that ne

    Jan 1, 2015

  • CIM
    MillMapper - A Tool for Mill Liner Condition Monitoring and Mill Performance Optimization

    By Jochen Franke, Derek D. Lichti

    "This paper gives a brief introduction and presents recent enhancements in the MillMapper technology developed for thickness gauging and condition monitoring of liners in grinding mills used for miner

    Jan 1, 2008

  • CIM
    Using The Six Sigma Approach Towards A Metallurgical Project: Nickel Loss Reduction And General Improvements To The Raglan Rougher Flotation Circuit

    By C. Ciriello

    Six Sigma methodology, as applied within Xstrata (formerly Falconbridge and Noranda), involves a disciplined approach to managing projects, solving problems, improving performance, and leveraging info

    Jan 1, 2007

  • CIM
    Economical Benefits of Autogenous Grinding

    By Seppo Lähteenmäki, Pertti Koivistoinen, Jaakko Levanaho

    "This paper describes the benefits and disadvantages of fully autogenous grinding when compared to grinding with steel grinding media. The study is a real case study based on a low tonnage, high grade

    Jan 1, 2000

  • CIM
    Simulation of a dragline operation in all eastern Kentucky mine

    By R. V. Ramani

    "A computer simulation model of a dragline has beer developed for the study of alternative dragline deployment schemes for varying geological and mining conditions. In this paper, the mathematical asp

    Jan 1, 1985

  • CIM
    Use of Concrete 1n Mining at the Jeffrey Mine

    By D. P. R. Smyth

    The limestone reef reservoir at Swan Hills consists essentially of a "buildup" of successively smaller atoll-like layers. Precipitation of calcium carbonate within the lagoonal area of each layer esse

    Jan 1, 1961

  • CIM
    Closing the loop—Using actual concentrator performance to determine the true value of ore sources

    "The Antamina orebody is a geologically complex, polymetallic skarn located in the Peruvian Andes. A range of copper and copperzinc ores are campaigned separately through the concentrator producing co

    Jan 1, 2005

  • CIM
    Overview of the Great Whale Iron Ore Project( GWIOP )

    By Jean Rosaire

    ?GWIOP Location ?Climate and Physiography ?History ?Geology ?Deposit Types ?Mineralization ?Historical Mineral Resources ?Conclusions and Work Program

    May 1, 2007

  • CIM
    Operating Experience and Developments of G-Rex and Aurix100 Resin Exchange Technology

    By Peter Richards, Alexander Lewis-Gray, Mark Davies, Nicholas Katsikaros

    "Gekko Systems developed the Gekko Resin Exchange Column (G-REX) in order to optimise the recovery of gold in complex leach-to-electrowinning processes, as an intermediate step using a highly gold-sel

    Jan 1, 2016

  • CIM
    Computer assisted economic analysis to select a stoping method

    By R. R. Tatiya

    "The ultimate aim of a mine design is to determine the development work involved and resources required by adopting one or more specific alternatives. A part of the process is the production of mining

    Jan 1, 1998

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990