Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Deriner Hydropower Scheme ? Geotechnical Issues and the Particular Case of the Spillway Tunnels Design and Construction

    By C. Cekerevac

    The paper addresses some geotechnical issues related to the construction of the Deriner dam and HEPP. Design considerations and rock stabilization measures are presented for the excavations which took

    May 1, 2009

  • CIM
    Mine and Tailings Effluent Treatment at the Kimberley, B.C. Operations of Cominco Ltd. (641e0bef-605a-4287-82ae-93ec545560c0)

    By W. J. Kuit

    "Complex facilities which provide for the collection, management and treatment of effluents emanating from the Sullivan mine and concentrator tailings were made operational in October, 1979. Key featu

    Jan 1, 1980

  • CIM
    Automatic Control of a Grinding Circuit as Experienced at East Malartic Mines

    By E. J. Marcotte

    "BRIEF DESCRIPTION OF GRINDING CIRCUITCrushed ore at -5/ 16 in. is delivered by a conveyor system from the crushing plant to two 1250 ton fine ore bins. The ore is transferred from each bin by a 30 in

    Jan 1, 1966

  • CIM
    Compilation of geology theses, 1991-1993. Part IIA-C: Abstracts of selected theses at Canadian Earth Science Departments

    By Wouter Bleeker, Isabelle Cadieux

    "Abstracts of theses related to mineral deposit studies and exploration, completed at geology or earth science departments of Canadian universities, have been compiled for the period 1991 to mid-l993.

    Jan 1, 1994

  • CIM
    Flash Smelting Furnace of the KGHM GLOGÓW Copper Plant - Technological and Process Challenges as a Driving Force of its Continuous Modernization

    By Z. Gostynski

    The paper is a historical cross-section through a 28-year period of operation of the direct-to-blister Flash Smelting Furnace in the KGHM Glogów Copper Plant. It presents the origin of the furnace as

    Jan 1, 2007

  • CIM
    The Autonomous Real-Time System for Ubiquitous Construction Resource Tracking

    By M. Soleimanifar

    With more and more industrial construction projects implementing RFID and other sensor-based technologies on fabrication and project sites, new innovative processes are needed to help automatically re

    Aug 1, 2013

  • CIM
    A Framework to Generate Accurate and Complete as-Built BIMS Based on Progressive Laser Scans

    By Te Gao

    It is a general expectancy that in most of the construction and renovation project, the contractor is going to hand over the as-built documents to the owner or the facility management team at the comp

    Aug 1, 2013

  • CIM
    Research on Operator?s Mastery of Unmanned Construction

    By Masaharu Moteki

    At present, the Unmanned Construction System (UCS) is adapted on initial operation against the disaster. For instance, it has been used in Unzen. When the scale of the disaster is big, or the danger t

    Aug 1, 2013

  • CIM
    Journal materials for a water lubricated bearing

    By J. C. Thornley, H. L. J. Drummond

    "Fifty years of wear on the original carbon steel shaft of this hydro turbine necessitated repair operations in 1980. Both austenitic and martensitic stainless steels have been used individually as jo

    Jan 1, 1985

  • CIM
    Blast Instrumentation - A Key to Mine Productivity

    By A. K. Debnath

    Coal is the mainstay of Indian energy supplies. The many-fold increase in demand for coal puts a huge pressure on augmenting production, primarily from opencast mines. The increase in production neces

    Aug 1, 2013

  • CIM
    Electrode and Electrode Management Technology for Use on Base Metal Electric Furnaces

    By S. Bantubani, I. Mc Dougall, S. Arjun, H. Joubert, R. Hansraj

    The requirements determining the design of the Söderberg electrode columns used in base metal applications are different to those of other industries. There is a strong trend to position the contact s

    Jan 1, 2019

  • CIM
    Microfluidic Solvent Extraction of Rare Earth Elements

    By Elisabeth Kolar, Rik Catthoor, Frederik H. Kriel, Rossen Sedev, Gareth Hatch, Army Research Laboratory, Craig Priest, Scott Middlemas

    "This paper reports solvent extraction of rare earth elements (REEs) carried out using a microfluidic device and considers the REE loading limit of the organic phase under laminar flow. The microfluid

    Jan 1, 2016

  • CIM
    Combining teleoperation with vehicle guidance for improving LHD productivity at Inco Limited

    By G. R. Baiden

    This paper discusses the application of Load-Haul-Dump (LHD) machine teleoperation in combination with a guidance system for single operator control of multiple IJIDs. A system accomplishing these goa

    Jan 1, 1994

  • CIM
    Solids Sampling at Australian Iron Ore Mine Sites (55a29317-25fd-4ddf-9f4c-115775e95e5b)

    By C. Matthews, A. Vo

    Australia is one of the world’s leading exporters of bulk commodities and the extensive use of sampling equipment is key to the successful management of each mining operation. At the process plant, wi

    Jan 1, 2019

  • CIM
    Integrating Radar Proximity Sensing and Camera Vision to Improve Mining Equipment Safety with Minimal Distraction

    By Nima Nabavi

    Shovels and excavators have significant blind spots due to their large sizes, increasing the chances of collision with other surrounding equipment such as haul trucks, loaders, and dozers. While a cam

    Oct 1, 2009

  • CIM
    Materials management at Brenda Mines Ltd.

    By G. Sperlins

    "IntroductionBrenda Mines Ltd. is a low-grade open-pit mining and milling operation located near Peachland, B.C. Brought into production in late 1969, the plant treats an average of 30,000 tons per da

    Jan 1, 1982

  • CIM
    Enhanced Separation of Rare Earth Elements

    By A. Welty, T. Garn, K. Lyon, B. Jakovljevic, R. S. Herbst, M. Greenhalgh, Cytec Solvay Group

    "Industrial rare earth separation processes utilize PC88A, a phosphonic acid ligand, for solvent extraction separations. The separation factors of the individual rare earths, the equipment requirement

    Jan 1, 2016

  • CIM
    Fire-retardant conveyor belts: Testing and standards

    By K. J. Mintz

    Conveyor belts installed in an underground mine can be a potential source of a major fire, thus the need for fife-retardant belting. A Canadian Standard, CAN/CSA-M422-M87, incorporating a small-scale

    Jan 1, 1992

  • CIM
    Hatch Electrode Column - Latest Developments

    By S. Southall, F. McCaffrey, F. Stober, M. Darini

    Electrode Columns are commonly used in electric furnaces to deliver current and regulate furnace power to the smelting or melting process. Hatch has developed an innovative patent-pending system for l

    Jan 1, 2005

  • CIM
    Computer Aided Detection of Fault Zones by Using Drill Hole Data

    By M. S. Ünal

    Creation of 3D model of coal seams is a tedious and time consuming operation. Computer aided 3D solid modelling of coal seams can be performed in a fast and detailed manner. However, in case of having

    Aug 1, 2013