Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Pressure Iron Removal Section at Rustenburg Base Metals Refiners

    By C. A. Biley

    "A dedicated iron removal stage was installed at Anglo American Platinum’s Rustenburg Base Metals Refiners (RBMR) during an expansion project which began execution in 2010. The Pressure Iron Removal (

    Jan 1, 2016

  • CIM
    New Locked Charge Protection System Prevents Damage to 14MW Geared Mill (7b868bde-460b-4446-94f2-2b070ebb2f1b)

    By P. van Zyl, M. Lombaard

    The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres

    Jan 1, 2012

  • CIM
    Effects of Warm Rolling Conditions on Deformability and Mechanical Properties of Magnesium Alloy Sheet

    By I. Yarita

    Magnesium alloys have the lowest density among the metals in practical use, and have properties such high specific strength, electromagnetic interference shielding and good vibration damping. Thus, th

    Jan 1, 2006

  • CIM
    A Second-Order Reliability Analysis of Rock Slope Stability in Amasya, Turkey

    By S. Gheibi, H. S. B. Duzgun, N. Dadashzadeh

    It is widely recognized that there are various uncertainties in the analysis of rock slope stability owing to inadequate information for site characterization and inherent variability and measurement

    Jan 1, 2015

  • CIM
    Investigation of Sorting Technology to Remove Hard Pebbles from an Autogenous Milling Circuit (c40a2cc4-6310-4112-9e56-e53e921ced42)

    By P. Condori, G. Rech, J. Winnett

    "Palabora Mining Copper has a unique ore body composition which unlike other copper ore bodies has three main components in significant proportions; these are copper bearing ore, magnetite and dolerit

    Jan 1, 2012

  • CIM
    Flowmeter Validation Method for Pipes with Scaling in an Industrial Water Pumping Station for Mineral Processing in Los Pelambres Mine, Chile, Through Fluorescent and Radioactive Tracers

    By A. Diaz, Minera Los Pelambres, C. G. Salinas, G. Leinenweber, F. Diaz, D. Rojas, R. Bernal, O. Jimenez

    "Los Pelambres Mine (MLP) is located in the IV Region of Chile, a semi-arid region where water plays a key role in operations as a scarce resource and is vital for the sustainability of human life, an

    Jan 1, 2016

  • CIM
    Thermal Analysis of B206 Aluminum Alloy Solidification

    By N. Haghdadi, D. M. Maijer, A. B. Phillion

    B206 is a recently-developed high-strength Al-Cu casting alloy with reduced Ti and Fe, as compared to the well-known AA 206 alloy, for improved hot tearing resistance. In the current study, the solidi

    Jan 1, 2014

  • CIM
    Iron Separation from Iron Bearing Polymetal Chloride Solutions by Means of Hydrolysis and Crystallization

    By H. Weissenbaeck, B. Nowak, M. Oesterreicher, R. Stastny

    The producers of certain metals like nickel and cobalt increasingly face a shortage of easy-to-mine and easy-to-process ore bodies. Their focus is shifting towards alternative raw materials which in t

    Jan 1, 2016

  • CIM
    Genetic concepts versus observational data in governing ore exploration (8892cbab-227b-497b-82c2-9c440d6a1510)

    By J. Roth

    "While not taking issue with the general thesis expressed in Dr. Ridge's analysis of the role of genetic concepts versus observational data in ore exploration (Ridge, 1983), the criticism could b

    Jan 1, 1983

  • CIM
    CANMET - university programs in mining innovation

    By R. Sage, N. Rillette, M. D. Everell, G. Herget

    "CANMET has been operating as a Government Technology Centre for two years. Many of CANMET's programs involve long-term research and require special expertise, often available at Canadian univers

    Jan 1, 1990

  • CIM
    Why Projects Fail – An Overview on Operational Readiness

    By A. Khan, C. Ciriello, W. Oliveira

    "The purpose of this paper is to demonstrate the value of Operational Readiness (OR) in the successful delivery of capital projects. OR can be captured using several technical and practical definition

    Jan 1, 2016

  • CIM
    The Woodstock iron works Carleton County, New Brunswick (f68b9f1a-03ba-45ff-b606-16ef76407f56)

    By R. R. Potter

    "IntroductionAlthough iron formations were recognized in western New Brunswick about 1820, commercial production was not achieved until 1848. The Jacksonville deposits near Wood stock were developed f

    Jan 1, 1983

  • CIM
    Rock Mass Grouting For Dams, an Observational Design Approach

    By J. A. Espinosa-Guillen, J. A. Lopez-Molina, S. García, J. A. Valencia-Quintanar

    "The design and implementation of grouting treatments in rock masses are procedures that require continuous adjustment of parameters and criteria to optimize the results. In this proposal we describe

    Jan 1, 2015

  • CIM
    The Mining Industry Technology Council of Canada: MITEC

    By W. G. Jeffery

    "The mining and mineral industries have been, and remain, a major component of the Canadian economy. There are approximately 560 producing mining establishments of which there are some 130 metal mines

    Jan 1, 1993

  • CIM
    Logistic model applied to geophysical data for sulphide nickel exploration

    By R. Simard

    "Conventional exploration strategies identify many mineral deposits as potentially interesting, although only a few of them turn out to be of economic importance. In the context of exploration for sul

    Jan 1, 1980

  • CIM
    Innovations in cokemaking and the role of the Canadian Carbonization Research Association

    By J. C. Botham, T. D. Brown

    "Coke is the most costly item in steelmaking via blast furnaces . Recent innovations in cokemaking have been directed toward reducing this cost while simultaneously improving coke quality and expandin

    Jan 1, 1980

  • CIM
    IFC?s Performance Standards on Social and Environmental Sustainability and the Equator Principles

    By Didier Fohlen

    Three Policy Shifts to enhance IFC?s Accountability ? Comprehensive and dynamic treatment of social, health, safety and environmental risks ?Covers a range of risks encountered by clients in emerg

    May 1, 2006

  • CIM
    A Comparison of the Anchorage Performance of Cable Bolts Based on a Newly Developed Testing Methodology

    "With the plethora of cable bolts on the market, geotechnical engineers can be baffled by the differences in performance claims from the manufacturers but perhaps more importantly they are sometimes a

    Jan 1, 2015

  • CIM
    A New Approach for Characterisation of Densely Fractured Rock Masses Using Artificial Neural Networks and Principal Component Analysis

    By R. B. Kaunda

    One fundamental requirement for surface and underground rock engineering is the ability to characterise the rock mass. An accurate characterisation of the rock mass allows rock engineers to optimize d

    Jan 1, 2015

  • CIM
    Les Mines Selbaie Story Engineering

    By A. J. W. Law

    "This paper deals with the organization of the central office technical areas and the role played during the feasibility studies, construction and operating phases of Les Mines Selbaie.HistoryThe Engi

    Jan 1, 1990