Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    How Dome increased maintenance effectiveness and reduced costs

    By K. Musgrave, E. Solis

    "This paper tells the story of how the Dome Mine in South Porcupine increased its maintenance effectiveness and reduced its maintenance costs in two phases. In the first phase, a maintenance audit was

    Jan 1, 1993

  • CIM
    Finite Element Prediction of the Cracking Tendency of a Laser Metal Forming Process for the Repair of High Temperature Turbine Blades

    By F. Fournier Dit Chabert, F. Tancret, J. François Castagné, R. Le Gall

    During the repair of turbine blades by a laser cladding process, it is observed that interdendritic cracking occurs in the heat affected zone (HAZ). Auger electron spectroscopy, performed on sample br

    Jan 1, 2006

  • CIM
    Study of Gold-activated Carbon Electrodes for the Production of Hydrogen Peroxide

    By Philippe V. Scheers

    Polycrystalline gold, glassy carbon and gold-activated glassy carbon electrodes were compared for the production of hydrogen peroxide by the cathodic reduction of dissolved oxygen. Gold was deposited

    Oct 1, 2003

  • CIM
    Rapid graphical analysis of rock slopes

    By D. M. Cruden

    "When two discontinuities form a tetrahedral wedge in a rock slope, a factor of safety for the wedge can be simply calculated (if motion is driven only by gravity and resisted only by friction) from p

    Jan 1, 1990

  • CIM
    Residual Stresses Induced by Robitized Hammer Peening: The Effect of Impact Energy Level

    By L. Hacini, N. Van L ê, P. Bacher, D. Thibault

    Manufacturer welded components may suffer from high level of residual stresses which can cause premature cracking and decrease the life of the components if they reach values close to the yield streng

    Jan 1, 2006

  • CIM
    Gibraltar Mine SAG Mill Expansion Grinding Ciruit Design (5e5517e1-bab6-43d2-8866-c7d882036c0e)

    By R. J. Rotzinger, K. W. Major

    The Gibraltar Mine and Mill facility were commissioned in 1972 by Gibraltar Mines Ltd utilizing a flowsheet consisting of two stages of crushing followed by a rod mill / ball mill grinding circuit. Du

    Jan 1, 2012

  • CIM
    Liven up your talent Acquisition Strategies with Social Media

    Situation Brands & Employment Value Propositions of mining sector firms are perceived negatively Competitive labour market is generally not aware of the diversity of mining careers Jobs requiring

    May 1, 2009

  • CIM
    Mine closing costs

    By Robert B. Parsons

    "Several recent cases indicate that the Courts may be leaning toward a more favourable treatment of mine closing and related costs. In this article, we look at two recent cases, Burnco Industries Ltd.

    Jan 1, 1982

  • CIM
    Implementation of a Hybrid Brattice to Control Dust Dispersion in Underground Coal Mine Faces

    By J. C. Kurnia

    Presence of fine dust in air causes serious health hazard for mine operators resulting in such serious problems as coal workers? pneumoconiosis and silicosis. Major sources of dust appear of course al

    Aug 1, 2013

  • CIM
    Sulphide ignition experiences at westmin resources

    By J. D. Botsford

    Westmin Resources Limited's H-W orebody on Vancouver Island is a copper/lead/zinc massive sulphide deposit that has been in production since 1985. The sulphur content of the ore averages 28% and in so

    May 11, 1988

  • CIM
    Modeling the Progressive Failure in Rock Slopes Based on the Fracture Mechanics Approach Using the Numerical Manifold Method

    By Z. Wu, L. N. Y. Wong

    The present study develops the numerical manifold method (NMM) as a tool to investigate the progressive failure in rock slopes. The entire processes of the progressive slide surface development relate

    Jan 1, 2015

  • CIM
    Assessment of Unpredictability in Hydraulic Fracturing for Stress Amelioration around Underground Excavations

    By J. P. Harrison, G. F. Gambino

    "This paper examines unpredictability in the parameters governing hydraulic fracturing (HF) as used in stress amelioration for underground excavations, with the aim of showing how this unpredictabilit

    Jan 1, 2015

  • CIM
    Cage hoist automation for today double-drum winder

    By E. Henderson

    "This paper outlines the upgrading of a double-drum 2000 hp cage hoist to provide fully-automatic operation from shaft station control panels. The application utilizes programmable controller technolo

    Jan 1, 1989

  • CIM
    Preliminary studies of the biogeochemistry of silver in British Columbia

    By J. J. Barakso, S. J. Horsky, H. V. Warren

    "A review of past and present biogeochemical studies is given. Early and more recent analytical procedures are described and compared. Tables 1-5 give silver concentrations in various organs of some p

    Jan 1, 1984

  • CIM
    Technology transfer and acceptance key to increased productivity in oil sands mining

    By R. K. Singhal

    "On the mining side the Canadian oil sands industry has become proficient in excavation and disposal of ore and overburden. Nearly twenty years of mining experience is now behind this industry. While

    Jan 1, 1989

  • CIM
    Experience with a new K40 System at PCS Mining, Lanigan Division

    By D. K. Storer, W. Lee, S. Tkach

    "A microcomputer-controlled multi-probe K-40 monitoring system was developed internally for the Phase II mill at the Lanigan potash mine. The K-40 probes were mounted in a variety of positions in seve

    Jan 1, 1990

  • CIM
    A Dynamic Ball Compression Test for Understanding Rock Crushing

    By S. Huang, K. Xia

    "During crushing, rock particle is subjected to complicated loading and the particle shape influences the fragmentation outcome. Thus, a highly controlled laboratory test is desired to establish the r

    Jan 1, 2015

  • CIM
    Analytical Model for Fully Grouted Rock Bolts with Multiple Joints

    By Debasis Deb, Ankur Narang, G. P. Raja Sekhar, Kamal C. Das

    "The stability of underground structures made (especially) in jointed rock mass is of the utmost important to designers, engineers and operators. Rock bolting is generally being practised to reinforce

    Jan 1, 2015

  • CIM
    Computer modelling of the geology of the Coal Mountain Mine

    By M. Lytle

    "The Corbin area of southeastern British Columbia has been a coal mining area since 1908. Byron Creek Collieries Ltd. Has operated its Coal Mountain Mine in this area from 1974 until the present. In F

    Jan 1, 1982

  • CIM
    Use of centrifuge models to study simulated blast loadings on backfills

    By G. N. Nnadi, R. J. Mitchell

    "The response of cemented backfills subjected to simulated blast loadings is studied using centrifugal modelling techniques. Scaling requirements for centrifugal modelling are developed and the result

    Jan 1, 1991