Improving the Material Flow in the Fox Mine Concentrate Bins
By J. Chlopas, D. J. Barratt, M. V. Sharp
"This paper describes the modifications made to the Fox Mine copper concentrate bin in order to obtain a continuous flow condition. The design of these modifications is based on test results obtained
Jan 1, 1978
-
A New Analytical Model to Simulate SAGD Process Considering Geomechanics
By A. Azad
SAGD (Steam Assisted Gravity Drainage) is an in-situ oil recovery technique for heavy oil reservoirs. The technique has been successfully applied to many projects in the past 25 years and the process
May 1, 2009
-
Discounted cash flow analysis — Methodology and discount rates
By L. D. Smith
"This paper examines the impact of the various assumptions that go into an economic evaluation, and shows how these can be combined to show an exciting result that may not really exist. An example of
Jan 1, 2002
-
Island Copper Mine Milling for Copper and Molybdenum
By Chris Brown
"The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil
Jan 1, 1975
-
Optimization of Water Supply and Reutilization in Base Metal Processing in Dry Regions
By Raymond Philippe
Background ?Hatch Water has worked with most major mining companies in Chile on water supply and optimization projects ?Many(copper) mining projects are located in Northern Chile, which hosts the
May 1, 2009
-
An Update on Reaching Nameplate Throughput and Continuous Improvement at Mount Milligan
By J. Yue
"Mount Milligan mine is located in northern British Columbia. The concentrator employs conventional SABC grinding circuit with bulk sulphide flotation processes. Commissioning started in September of
Jan 1, 2017
-
Stope Stability Monitoring at the Goldex Mine
By Patrick Frenette
The Goldex Mine is an underground gold mine using a unique mining method where a single very large stope is being created. In order to maintain stability of the walls and roof of the stope which is 45
May 1, 2011
-
Paste Backfill at the Brunswick Mine
By Michael Cooper, Eric Konigsmann, A. Moerman
"A paste backfill plant and underground piping distribution system was commissioned at the Brunswick Mine in June, 1998. Concentrator tailings, composed mainly of pyrite and lesser amounts of silicate
Jan 1, 1999
-
Some Practical Suggestions to Coal Operators on the Marketing Problem
By George B. Saunders
It is the purpose of this paper to point out conditions as they exist in the merchandizing of coal, to compare these conditions with methods in use by competitive producers of coal substitutes, and to
Jan 1, 1929
-
Mine Site Hydrogen Storage and Delivery Model
By M. C. Bétournay
Mine site infrastructure for storage and delivery of hydrogen must be standardized and acceptable for routine and safe industrial use before fuel cell technology is adopted as a major power source. A
May 1, 2007
-
Mitigating Brown Field Project Risks Using Advanced Simulations
By S. Bellec, A. Berton
"Usually, steady state mass balances are used for the design of mineral processing plants. However, this tool does not take into account the impact of process inputs variability nor does it evaluate p
Jan 1, 2015
-
Meeting the Transportable Moisture Limit for Lead Concentrates
By H. P. Jacobi
"INTRODUCTIONPine Point Mines, operated by Cominco Ltd., is located approximately 65 miles east of Hay River, N.W.T. on the south shore of Great Slave Lake.The milling operation started in the fall of
Jan 1, 1975
-
Selective Separations of Gold and Contaminants from Various Gold and Silver Process Streams
By R. L. Bruening, J. B. Dale, N. E. Izatt, S. R. Izatt
IBC Advanced Technologies' Molecular Recognition Technology (MRT) SuperLig® products selectively and rapidly bind with target metal ions to remove them from solution. The MRT process can produce
Jan 1, 2011
-
Integrated Grinding and Flotation Simulations for the Improvement of Circuit Performance at BHP-Billiton’s Minera Escondida
By H. E. Urtubia, C. W. Bailey
"BHP-Billiton’s Minera Escondida Limitada is one of the world’s largest copper producers. It treats a combined 88 million tons of copper ore per year through its two concentrators: Los Colorados and L
Jan 1, 2007
-
A Plant-Wide Control System for Flotation Level Control
By D. G. Hulbert, J. H. Schubert, R. G. D. Henning
"Froth depth, along with reagent addition and aeration rate, is one of the crucial factors that can be used to control a flotation circuit. Sub-optimal setpoints and disruptions in levels have a sever
Jan 1, 1995
-
Distributed Digital Control of a Flotation and Grinking Circuit at the Kidd Creek Concentrator
By O. Matwijenko
"The Kidd Creek concentrator is located twenty-six kilometres east of Timmins, Ontario, within a metallurgical complex including a 109,000 MTPY zinc plant and a new 59,000 MTPY copper smelter and refi
Jan 1, 1980
-
Oxygen Demand – Measuring Pulp Reactivity
By Stephen R. Grano, Jon Glatthaar, Philippe Steinier, Christopher J. Greet
"The importance of the oxygen content of sulphide mineral pulps in determining which reactions occur, and their subsequent influence on flotation behaviour is grossly underestimated in most operating
Jan 1, 2004
-
Effects of Operating Parameters on Grinding Steel Consumption
"INTRODUCTIONThe Kidd Creek Concentrator is located 28 kilometers east of the city of Timmins, Ontario. Two types of ore are treated; 'A' type, a copper-zinc-low silver ore producing copper and zinc c
Jan 1, 1988
-
Constancia Project Process Plant Design and Start Up
By David Stephenson, Hugo Granados, Steven Klohn
"HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv
Jan 1, 2016
-
Optimization of the Grinding Circuit of the Tata Steel Ijmuiden Pelletizing Plant
By Willemijn Husslage
Tata Steel Group At a glance ? Part of the Tata Group ?Tata Steel Group: ?Fortune 500 company ?Top 10 global steel producer ?Annual crude steel capacity of 28 million tonnes ?More than 80,000
May 1, 2011