Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mine Dewatering Project - Pasminco Mining, Broken Hill

    By Mitchell D. S

    BackgroundIn March 1990 Pasminco resolved to replace and increase the capacity of the underground pumping system at the Southern Operations, Broken Hill. The existing pump station was built 23 years a

    Jan 1, 1993

  • AUSIMM
    Use of Simulation to Support Mining Industry Operators

    By Harper B

    The mining industry has developed a comprehensive view of the need to have production personnel well trained in the use and maintenance of mining equipment. A strong commitment from the industry to th

    Jan 1, 1998

  • AUSIMM
    Fluid and Metal Sources in the Mt Carbine Tungsten Deposit, North Queensland, Australia

    By Forsythe DJ, Sun S-S Andrew AS

    Paragenetic, fluid inclusion, stable isotope, and 87Sr/86Sr and 143Nd/144Nd isotope studies of the Mt Carbine tungsten deposit in North Queensland provide information on the sources of the mineralis

    Jan 1, 1987

  • AUSIMM
    Mobile Miner MM130 - A Mining Innovation

    The Mobile Miner MM130 (Figure 1) is designed to tunnel or mine in hard rock. It has a 4.1 m diameter cutterhead mounted on a horizontal axis which in turn is perpendicular to the line of the machine.

    Jan 1, 1993

  • AUSIMM
    The Application of Hydraulic Stowing Partially Deslimed Mill Residue in Stopes at Broken Hill South Limited (34d64f53-9747-4881-ab11-c0a50efcc88b)

    The South Mine, property of Broken Hill South Limited, is situated at Broken Hill, NSW, Australia, towards the southern end of the main lode. The leases (MLs 7 and 8) cover a length of 2400 feet along

    Jan 1, 1994

  • AUSIMM
    Gold Mineralization of New Caledonia

    New Caledonia is a major metallogenic unit of the south-western Pacific Rim. Its mineral production is of world significance and it has an unusually well diversified mining history. New Caledonia&

    Jan 1, 1987

  • AUSIMM
    The Influence of Medium Rheology on the Separation of Minerals in Dense Medium Drums and Cyclones

    By Baguley PJ, Napier-Munn TJ

    This paper presents preliminary resu]ts from field studies which were conducted to establish, among other things. the influence of medium viscosity on the partitioning behaviour of dense medium cy

    Jan 1, 1987

  • AUSIMM
    Argyle Diamond Mine Open Pit

    By Wall J, Platell R, Knight P

    The Argyle diamond mine is located in the East Kimberley area of Western Australia, some 100 km south of the town of Kununurra. The diamondiferous Argyle olivine-lamproite diatreme was discovered in

    Jan 1, 1994

  • AUSIMM
    Pit Lake Sustainability - What Is It, and How Do I Get It?

    By M Lund

    Due to operational and regulatory practicalities, pit lakes will continue to be legacies of many open cut mining lease relinquishments. Unplanned or inappropriate management of these significant geogr

    Jan 1, 2006

  • AUSIMM
    XPAC Destination Scheduling for Waste Dumps at BHP Billiton

    By G J. Butler

    Since 2005 BHP Billiton Iron Ore has been working with the consulting company Runge to implement the software XPAC Advanced Destination Scheduler (ADS) in life-of-mine studies. The Mt Whaleback mine,

    Jan 1, 2007

  • AUSIMM
    Evaluation of the Callide Coalfield

    By Roach C

    Exploration on the Callide Coalfield by Thiess Bros. Pty. Limited had reached the stage in mid 1976 where there was a need for a comprehensive appraisal of the coalfield geology. Exploration strat

    Jan 1, 1978

  • AUSIMM
    Application of Numerical Image Analysis to Process Diagnosis and Physical Parameter Measurement in Mineral Processes ù Part I: Flotation Control Based on Froth Textural Characteristics

    By P Pelletier, J Tessier, C Duchesne

    This paper summarises research into the study of the control of flotation processes based on froth images. A review of the froth flotation operation background and the relevance and role of the froth

    Jan 1, 2005

  • AUSIMM
    The Last One in 251: Mass Blasting at Selwyn Mine

    By Gilligan P

    The Selwyn gold-copper operation is wholly owned and operated by the Arimco mining group. The mine is located 150 kilometres south-east of Mount Isa. The primary extraction method for the gold-copp

    Jan 1, 1994

  • AUSIMM
    Developments in Coal Mine Tailings Disposal and Rehabilitation

    The conventional approach to the disposal of fine coal mine tailings, which involves piping the tailings as an aqueous slurry to a storage where they remain in the form of a permanent wet deposit,

    Jan 1, 1991

  • AUSIMM
    Lode Controls of the Hodgkinson Goldfield, Northeastern Queensland

    The Hodgkinson goldfield contains over 50 separate lodes which have produced 9.7 tonnes of gold from ore averaging 37 g/t. The gold-quartz.lodes are spatially separate from tin and base metal minerali

    Jan 1, 1991

  • AUSIMM
    No 3. Services and Surface Area

    In the general planning of this area, provision was made for the distribution over the whole area as required of the following services:(a) Power and lighting from the substation distribution boards &

    Jan 1, 1957

  • AUSIMM
    A Geochemical Study of Island Arc Volcanism

    The Northern Mariana archipelago in the W.Pacific forms a classic intra-oceanic island arc system far from the influences of continental crust. As such it offers an ideal location in which to stud

    Jan 1, 1987

  • AUSIMM
    Where DEM and SPH collide – wet screening optimisation with numeric tools

    By J Plinke

    The imperative to operate sustainably requires all equipment and processes to operate at their maximum possible efficiency. Achieving this ideal state requires a thorough understanding, not only of th

    Nov 8, 2021

  • AUSIMM
    The Implementation of Bulk Emulsion Explosives at Big Bell Mine

    By J Player, K Braddon

    High productivity mining is the key to the financial success and stability of modern mines. This can be achieved through the use of new technologies, the development of innovative work practices andop

    Jan 1, 1999

  • AUSIMM
    Network Analysis of Pre Development Regulatory Procedures

    By Hughes DC

    Coal development in New South Wales can involve a complex series of government approvals, a requirement that results from the coincidence of many development sites with environmentally sensitive ar

    Jan 1, 1983