Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Towards Larger Flotation Machines

    Economic and technical reasons forced the mining industry all over the world to increase the unit size of mineral processing equipment. in large flotation cells, this development leads to problems

    Jan 1, 1978

  • AUSIMM
    Nature of Uranium Mineralization and Associated Wall Rock Alteration in the WhiteÆs East Area of the Embayment, Rum Jungle, Northern Territory

    By Borshoff J, Von Pechmann E

    The uranium mineralization in the White's East area of The Embayment is hosted by Lower Proterozoic schists of the Masson Formation which have undergone polyphase de- formation and upper greens

    Jan 1, 1984

  • AUSIMM
    Optimising the Usage of Magnetite at a Modern Coal Preparation Plant

    By Hoban M, Smith CJ

    Norwich Park Mine commenced production of export coking coal in November 1979. Attention to consumables control was limited during the early running of the plant. Once higher than anticipated magne

    Jan 1, 1978

  • AUSIMM
    Scott Lode: A Significant High Grade Gold Deposit

    By Cornwell P. J

    The Pajingo ore bodies consist mainly of auriferous quartz veins hosted by a suite of hydrothermally altered andesitic pyroclastics, volcanics and epiclastic sediments. Scott lode, the main econom

    Jan 1, 1989

  • AUSIMM
    A Study of the Potential for Surface and Ground Water Contamination by Arsenic at the Sunbeam Gold Mine

    By Pyrih R, House A, Shangraw J, Silva AJ

    Sunbeam Mining -Corporation has the inten mine with heap leach gold recovery, near spent ore indicated a relatively high ar topographical configuration, the spent across a small drainage and a lak

    Jan 1, 1988

  • AUSIMM
    Progress Towards the Heap Bioleaching of Chalcopyrite

    By P D. Franzmann, D J. Readett, J Peterse

    A better connection between laboratory- and pilot-scale test results, and heap bioleaching performance can be achieved by generating reliable information on the fundamental microbial, chemical and phy

    Jan 1, 2004

  • AUSIMM
    The Development of the Escondida Leach Process and its Implementation in the Escondida Copper Cathode Plant

    BHP is the world's largest copper concentrate producer with production from mines at Escondida (Chile), Ok Tedi (Papua New Guinea), and Island Copper (Canada). The entire concentrate production

    Jan 1, 1995

  • AUSIMM
    Fission Track Thermochronology - Reconstructing the Thermal and Tectonic Evolution of the Crust

    Fission track thermochronology is a well established method for reconstructing the thermal histories of rocks with particularly important applications in tectonic studies, detecting low-grade thermal

    Jan 1, 1990

  • AUSIMM
    Permitted Explosives for the 21st Century

    By D Chalmers

    Drill and blast mining techniques are used to mine coal outburst prone and high gas content coals in Australia. As the risk of an outburst is increased in high gas content coal, it is considered that

    Jan 1, 2007

  • AUSIMM
    Process Control and Flocculant Optimisation of Tailings Thickeners at PT Freeport

    By M Simanjuntak, A M. Supomo

    PT Freeport IndonesiaÆs copper/gold operation disposes of approximately 222 000 dry metric tonnes of tailings per day via two thickeners. Reduction of the flocculant dosage rates in each of the tailin

    Jan 1, 2003

  • AUSIMM
    Flow Characteristics of a Pinched Sluice

    By Partridge A. C

    Pinched Sluices, in a variety of guises, are used extensively for the separation of minerals according to density. In the authors' work a pilot-scale sluice has been constructed with provision

    Jan 1, 1979

  • AUSIMM
    Remote Monitoring of Rock Mass Deformation During Mining

    By M Mee, R L. Gwyther

    Accurate measurement of rock mass response during the mining of massive underground orebodies is essential, as mines become larger and deeper. These measurements enable: provision of quantitative data

    Jan 1, 2000

  • AUSIMM
    Major Wear Parts in a Continous Copper Rod Plant and their Effect on Operations

    By Murphy MW, Klaric SD

    The history, operation and design of the Secor continuous rod production process is described. The effective operation of the plant is influenced by accurate monitoring and control of molten metal pro

    Jan 1, 1985

  • AUSIMM
    Experience with Pre-Drainage of Seam Gas in the Western Area of the National Coal Board

    Methane predrainage from coal seams in the Western Area of the U.K. has been practiced over the past decade. The differing reasons for the practice include the controlling of gas emission rates in

    Jan 1, 1982

  • AUSIMM
    Keeping Geologists, Production Personnel and Contractors Happy - An Integrated Approach to Blasting at Boddington Gold Mine, WA

    By McBride N

    Location The Boddington Gold Mine (BGM) is located approximately 120 km south east of Perth, Western Australia. (Figure 1). Located within the picturesque Darling Ranges, the land was previously us

    Jan 1, 1995

  • AUSIMM
    A Study of Highwal Damage Caused by Overburden Blasting in a Strip Coal Mine

    By Nguyen V. V

    The development of structural defects in the overburden material immediately behind a production blast was studied using surface and subsurface techniques. A significant increase in vertical and h

    Jan 1, 1981

  • AUSIMM
    Relationships Between Geological Resolution and Flight Line Spacing in Low Level Aeromagnetic Surveys

    By Spencer GA, Saul SJ

    The flight line spacing in low level aeromagnetic surveys is the principal factor governing both the cost and the amount of geological detail which can be extracted from the data. The rate at which ge

    Jan 1, 1976

  • AUSIMM
    Raw Material Requirements for Sheet Glass Manufacture

    At 9.45 pm on Thursday, 12 July 1962 glass began to flow in an endless stream from a massive melting tank in a new Whangarei factory and a vital new industry was born û right on schedule. It wasn

    Jan 1, 1978

  • AUSIMM
    Mine Design to Economic Evaluation ù The Missing Link?

    By B Cope, N Hastings, D Webb

    A Feasibility Study was completed in late 2002 to ascertain the risk and reward profile from the proposed deepening of operations at Perseverance Nickel Mine in Western Australia. The system and appro

    Jan 1, 2003

  • AUSIMM
    Developments in Coal Dewatering Techniques

    By Cresswell G. M

    The international coal industry is becoming increasingly aware of the economic impact of coal dewatering in terms of plant yield limitations, attainment of product specifications and freight costs. Th

    Jan 1, 1993