Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Technical note-a laboratory scale rotary kiln simulator

    By Field R. V, Graieg O, George T. J

    The design, construction and operation ofa laboratory scale rotary pot kiln are outlined. Charges ofup to 3 kg can be heated to temperatures up to 1200°C in a controlled atmosphere. Some examples

    Jan 1, 1986

  • AUSIMM
    Process Integration and Optimisation - A Case Study in Productivity Improvement

    By J Col, D La Rosa, W Valery, A Jankovic

    Metso Minerals Process Technology Asia-Pacific and South America (MMPT) has been working with operations around the world to increase their efficiency through æMine-to-MillÆ or Process Integration and

    Jan 1, 2007

  • AUSIMM
    Meteorological Forecasting of Blast Noise from the Del Park Minesite

    Alcoa of Australia's Western Australian bauxite mining operations in the Darling Ranges, south east of Perth, present major challenges in the control of air blast. The close proximity of rural

    Jan 1, 1982

  • AUSIMM
    Arc-Backarc Systems of Northern Kermadec-Tonga

    Over the past seven years, a combination of New Zealand-, Australian- and German-led research voyages using the research vessels Tangaroa, Southern Surveyor, and Sonne respectively, have revolutionise

    Jan 1, 2005

  • AUSIMM
    Relocable Inpit Crushing and Conveying Systems

    As a result of high fuel prices and substantial haul distances or vertical lift from pits, the development of large inpit crushing and conveying systems at many open pit operations has occurred over t

    Jan 1, 1992

  • AUSIMM
    The Structural Geology of the Herberton Tin Field

    This paper is based on studies made intermittently from 1937 to 1950. Its object is to describe the surface geology and the tin lodes, and to relate the lodes to the structure of the field.PREVIOUS RE

    Jan 1, 1951

  • AUSIMM
    Designing for Maximum Production from Trucks and Loaders

    In many mining operations, the truck and loader equipment represents the bulk of the invested capital and the majority of the mine operating cost. The profitability of these mines is therefore crit

    Jan 1, 1983

  • AUSIMM
    Introduction of Autonomous Loaders to Olympic Dam Operations, Australia

    WMC Resources Ltd has been involved the development and trialling of an automated load haul dump vehicle system since 1997. This paper describes the introduction of the system into the Olympic Dam Ope

    Jan 1, 2005

  • AUSIMM
    Compositions, Log Ratios and Bias - From Grade Control to Resource Definition

    By C Ward, U Mueller

    Compositional geostatistics is an approach developed to ensure that the constant sum constraint induced by geochemical iron ore analysis is respected in estimation and simulation. Jack-knifing and cro

    Aug 12, 2013

  • AUSIMM
    Testing the Design of a Mine Winder Control System Using Simulation Techniques

    The control system of a mine winder or other variable speed drive has many component parts that must work together to provide the required functional performance of the machine, together with comprehe

    Jan 1, 2005

  • AUSIMM
    Recent Developments in Electrical Exploration

    The MIMDAS geophysical data acquisition system developed and tested by the former MIM Exploration Pty Ltd (MIMEX) is now commercially available worldwide through Geophysical Resources and Services Pty

    Jan 1, 2004

  • AUSIMM
    Open Stope Mining in Canada

    By M Hudyma

    Open stope mining is the most common mining method employed in underground, hard rock mines in Canada. It is characterised by relatively small, single lift stopes (20 000 to 100 000 tonnes), and fast

    Jan 1, 2000

  • AUSIMM
    Mineralogical Face-Mapping Using Hyperspectral Scanning for Mine Mapping and Control

    By L Whitbourn, K Yang, P C, E Ramanaidou

    The potential of hyperspectral mineral mapping within a mine environment is demonstrated. Central to this capability has been the development of portable or vehicle-mounted, hyperspectral mine face-ma

    Jan 1, 2006

  • AUSIMM
    Sakmarian (Early Permian) Branchiopod Biogeography and Constraints on the Timing of Terrane Rifting, Drift, and Amalgamation, in SE Asia, with Reference to the Nature of Permian 'Tethys'

    By Waterhouse BJ

    Occurrence data of Tastubian,Sterlitamakian, and Aktastinian (all of Sakmarian Stage of Early Permian) brachiopod genera are analysed by Q-mode cluster analysis, principal component analysis, and disc

    Jan 1, 1990

  • AUSIMM
    The Penna Hoisting Plant ù Opportunities and Issues Related to Using Lower Rope Selection Factors

    By C Quirion

    Agnico-Eagle Mines Limited, Laronde Division, operates the deepest single-lift shaft in the western hemisphere. The initial Penna hoisting plant was designed for a production rate of 1800 tonnes per d

    Jan 1, 2005

  • AUSIMM
    Physical modelling of tailings dam breach: exploring overtopping following shear failure

    By W A. Take, M McKellar, A Walsh, S McDougall, S G. Evans

    Recent tailings dam failures have heightened public awareness of the hazard posed by storage facilities for mining waste, illustrating the need for a more critical examination of tailings dam breach m

    Jul 1, 2021

  • AUSIMM
    Metamorphic core complexes - "hot spots" in the continental crust?

    Magmatism is of first order significance in the extension process. Continental extension is terminated when sea-floor spreading commences, but sea-floor spreading will not commence if magmas do not be

    Jan 1, 1990

  • AUSIMM
    Stratigraphy and Geochemistry of the Flynn Subgroup Volcanic Rocks

    By Morrison R. S, Doennilan N

    Recent mapping (1989-1992) by the Northern Territory Geological Survey in the Tennant Creek 1:250 000 map sheet area has resulted in substantial revision of the lithostratigraphy of the Tennant Cre

    Jan 1, 1994

  • AUSIMM
    Survey Procedures for Urban Underground Construction

    The advantages of coordinate geometry in design and construction of underground works are apparent for reasons of flexibility, security, computer operations, survey error analysis, and the use of n

    Jan 1, 1976

  • AUSIMM
    Automating Hoist Rope Inspection Processes

    By B Delaney

    For worker safety, mining companies are required to stop production and inspect hoist ropes. Visual inspection is generally done daily and EM inspection occurs every three to four months. During visua

    Jan 1, 2005