Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    To Mill or To Leach ?

    Good morning ladies and gentlemen. It gives me great pleasure to talk to you today about a pet subject of mine, on when to mill and when to leach gold ores. According to Gold Fields Mineral Services

    Jan 1, 1991

  • AUSIMM
    Direct Electrowinning of Lead from Lead Sulphide Concentrates

    By Siemon J. R

    It is possible to use compacted anodes formed at low pressure for the direct electrowinning of lead from sulphide concentrates. An anode containing 5.5 per cent graphite, formed into a compact at 34 M

    Jan 1, 1976

  • AUSIMM
    Gas Properties of Australian Coal

    By Hargraves A. J

    At 4 MPa gas pres ure and 30°C the sorptive capacity of 10 selected Australian dried coal ranges from 17 to 23 m3/tonne of CH4 and 27 to 36 m3/tonne of CO2. Values for moist coals are about 25 pe

    Jan 1, 1985

  • AUSIMM
    Excavation Design and Mining Methods in the 1100 Orebody, Mount Isa Mine, Australia

    By Sullivan BJK

    The 1100 orebody is a massive copper sul- phide orebody which contains a major portion of the Isa Mine copper ore reserves of 130 million tonnes at 3.2%. The underground mining of a deposit as larg

    Jan 1, 1978

  • AUSIMM
    Basic Studies on the Bulk Precipitates Formed from Iron Salt and Xanthate Solutions

    By Rao SR, Finch JA

    Sphalerite flotation without Cu activation in the presence of iron ions has been reported and studied as a function of pH, dissolved oxygen content and pulp potential with both single mineral and or

    Jan 1, 1993

  • AUSIMM
    Use of Computerised Management Systems for the Blair Athol Coal mine Project

    As Project Managers for the Blair Athol Coal Mine Project, CMPS selected a number of computer systems to assist in project control. The areas where computers were used were: 1) Planning & Schedulin

    Jan 1, 1983

  • AUSIMM
    Heavy Medium Separation at Iscor's Sishen Iron-Ore-Mine

    The Sishen iron-ore-mine produces 3 pro= ducts with size gradings of 25 to 8 mm, 11 to 5 mm and 5 to 0,2 mm and has a product capacity of 20 Mtpa. Ore is produced at an average Fe content of 66,2

    Jan 1, 1987

  • AUSIMM
    Roof Control (7dd78a96-4f18-4459-8ee3-ed9927f2bb10)

    By Dawes S

    Efficient roof control in colliery operation is a factor that must be maintained for· the maximum reQovery and economic extraction of the mineral. It must be carefully considered in each of the f

    Jan 1, 1947

  • AUSIMM
    The Glass Sand Industry in Australia: Production, Processes and Markets (b11bdfa0-ef26-4950-bf21-8765ff14b0ec)

    By Richards RG

    The Australian glass sand industry produces some 2.8 million tonnes per annum of silica sand, of which about 2.0 million tonnes are exported and the rest is for the domestic market. Approximate produc

    Jan 1, 1990

  • AUSIMM
    Some Factors Affecting the Coulombic Efficiency of Zinc Electrowinning

    By Frazer E. J, Lwin T

    Measurements of coulombic efficiency (QE) for zinc electrodeposition were carried out under mass-transfer-controlled conditions using a rotating disc electrode in synthetic acidic zinc sulphate so

    Jan 1, 1987

  • AUSIMM
    A Method of Preparing Titanium Trichloride

    Titanium tetrachloride may be reduced to trichloride with hydrogen on a hot tungsten filament and other hot: surfaces. The effect of temperature, time and size of t.he filament on the rate of reaction

    Jan 1, 1956

  • AUSIMM
    Characterisation and Beneficiation of the Glass Sand Deposits of Bangladesh

    The investigation of Noapara glass sand deposit in Sylhet district of Bangladesh is performed to beneficiate the sand for the manufacture of colourless glass. For the ease and efficient removal of the

    Jan 1, 2000

  • AUSIMM
    The Hamata Gold Prospect, Morobe Goldfield, Papua New Guinea

    By Mowat B. A

    I lamata is within the Morobe Goldfield (7¦ 25' S, 146¦ 39' E) on the Wau (SB 55-14),1:250,000 scale map sheet (Fig 1). The deposit is 13 km SW of Wau, within the headwaters of the Upper

    Jan 1, 1997

  • AUSIMM
    The Development and Operation of a Continuous Tapping Lead Blast Furnace at Port Pirie

    On the 17th November, 1964, a new No., 2 lead blast furnace was blown in at Port Pirie. The furnace departed from previous designs by incorporating a centrally located continuous tapper for both l

    Jan 1, 1975

  • AUSIMM
    The Development of No 2 Ore Shaft as a Surface Hoisting Shaft at Mount Isa Mines Limited

    By Onton W

    During the latter part of 1936, conditions encountered in sinking the Main Ore shaft made it impractical and uneconomical to continue deepening it to serve haulage levels below the present No. 5

    Jan 1, 1988

  • AUSIMM
    The Future of Geological Education in the Pacific

    o Resource production is essential for society. o Demand for resources will increase as population grows.o Resource industries are the main consumer of trained geologists.o The lead time from(1) train

    Jan 1, 1990

  • AUSIMM
    Utilisation of energy sources other than coke in the sintering process

    By T Higuchi, K Fukada, K Takehara, Y Iwami, S Fujiwara

    Following the Paris Agreement adopted in 2015 and the SDGs, reduction of CO2 emissions has been taken up as an issue worldwide, and the steel industry, which has a particularly large emission, is requ

    Nov 8, 2021

  • AUSIMM
    Electrolytic reduction of metal sulfides/oxides in molten salts for sustainable metal production

    By X Hu, J Björkvall, L Sundqvist Ökvist

    The metal production industry is a significant contributor to global CO2 emissions due to the use of fossil fuels such as coal and coke. To mitigate these emissions and meet climate goals, innovative

    Jun 19, 2024

  • AUSIMM
    Techno-Economic Methods to Consider in Designing an Optimal Shaft System in Anglo Platinum

    By C P. de Jager, J J. Taljaard

    Over the past 75 years, the mining of platinum has predominantly focused on the Merensky Reef horizon in the western Bushveld region of the Bushveld Igneous Complex (BIC) of South Africa (Figure 1). T

    Jan 1, 2005

  • AUSIMM
    Settling Pond Design and Construction for the Malvern Hills Coal Project, Canterbury

    The Malvern Hills coal project is now in an advanced stage of development with the stripping of overburden from above former underground workings in which a 3 m seam of subbituminous C coal with very

    Jan 1, 2003