Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geotechnical Reporting at Olympic Dam Mine

    The need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech

    Jan 1, 2004

  • AUSIMM
    Buckling of Sheave Wheels

    Sheaves are a critical safety component in a winding system and are expected to survive such extreme loading events as rope break. Sheave designs have often been developed and evolved empirically, con

    Jan 1, 2005

  • AUSIMM
    Influence of Vertical Pile Loading on Existing Tunnel Lining in Soft Clay

    By R Ayothiraman

    Tunnel excavation may induce adverse effects on nearby existing structures/foundations in urban areas. Accurate prediction of tunnelling effects on pile foundations of nearby structures in the urban e

    Mar 8, 2011

  • AUSIMM
    Analyses of pressure drop in high temperature zone during iron ore sintering

    By S Mitra, T Singh, D O’Dea, T Honeyands

    Permeability and air flow rate in the bed during iron ore sintering is crucial to controlling the sinter quality and productivity of a sinter plant due to its influence on the flame front speed. In th

    Nov 8, 2021

  • AUSIMM
    Coal Mine Ventilation and the Law

    By M Parcell

    "Ventilation risks in an underground mine have essentially remained the same for centuries, yet theevidence suggests that there are many coal mines that have failed to adequately control these risks.T

    Jun 1, 2012

  • AUSIMM
    Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project

    By M Behrens

    The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th

    Mar 8, 2011

  • AUSIMM
    Design of Segmental Lining for Waterview Project, Auckland, New?Zealand

    By S Pradhan, A Kuras, R Mahajan

    This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan

    Sep 17, 2014

  • AUSIMM
    Real-time Methane Detection – Modern Digital Laser Spectroscopy for Hostile Environments

    By D Chalmers, C C. Harb

    The detection and control of gas levels in mining is a continuing challenge for the industry. Standard detectors have many problems that could be overcome with laser based spectroscopic instruments, b

    Aug 31, 2015

  • AUSIMM
    A Simultaneous Optimisation Tool for Open Pit Mine Scheduling

    By Y Ren

    The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents

    Sep 26, 2013

  • AUSIMM
    Reply to Contributed Discussion (this issue) by John Shepher and L. Keith Rixon

    By ALAN J. HARGRAVES

    It is normal that Shepherd and Rixon, in their contributed discussion (this issue) see differences with Hargraves (1983), as it exemplifies the present uncertain situation worldwide, a situation expec

    Jan 1, 1983

  • AUSIMM
    Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)

    By C E. Woolley, H Jebaliya, J Foster

    The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May

    Jun 22, 2022

  • AUSIMM
    Developing the West Pilbara Iron Ore Project

    By K Watters

    API Management Pty Ltd (API) is currently developing the West Pilbara Iron Project (the ‘Project’). The Project is a substantial greenfi elds mining and infrastructure development proposed for the wes

    Jul 11, 2011

  • AUSIMM
    A practical approach to improve investigations and identify systemic organisational issues

    By M Alston

    Many organisations struggle to yield meaningful outcomes from incident investigations. This paper will demonstrate that we can discover systemic issues by rethinking the ‘Why’ and ‘How’ of investigati

    Apr 16, 2024

  • AUSIMM
    An Underground Air Blast - Codelco Chile - Division Salvador

    By M Fishwick Tapia

    This paper was prepared and translated from the final report of the investigation into the Codelco Chile Salvador DivisionÆs air blast which occurred in the Inca-West area. In this section of the bloc

    Jan 1, 2000

  • AUSIMM
    The Testing of Autogenous Grinding in Laboratory and Pilot Scale and the Design of Full Scale Comminution Circuits

    By Morsky P, Kalapudas R, Natunen H, Virtanen M

    The development of autogenous grinding modification in Outokumpu, known with the name 'Outogenius Comminution', was 'reversed'. At first the metallurgists studied and tested tens

    Jan 1, 1993

  • AUSIMM
    Measuring the influence of a sublevel cave on open stoping at Telfer

    By J Maxlow, M J. Woods, M P. Sandy

    The Newcrest Mining Limited Telfer operation comprises both open pit and underground operations producing gold and copper. The underground operation is made up of three production areas, the sublevel

    Nov 29, 2022

  • AUSIMM
    Integrated geotechnical audits and benchmarking for mining operations

    By J J. Van Wijk, A R. Penney

    Successful management of geotechnical risk at a mining operation is more than just having a good ground control management plan or using advanced numerical modelling and the latest monitoring technolo

    Nov 29, 2022

  • AUSIMM
    Pulp rheology of fine mineral flotation – a review

    By A Liu, X Wang, W Peng, Q Zhang

    Pulp rheology plays a critical role in fine mineral flotation. Yield stress and apparent viscosity are two important rheological parameters affecting mineral flotation recovery. In this paper, the con

    Aug 24, 2022

  • AUSIMM
    Murrin Murrin Heap Leaching Project

    By N Meadows, M Rodriguez

    A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto

    Jan 1, 2006

  • AUSIMM
    Cooling on demand – the next step in ventilation automation

    By F C. D Michelin

    As mines get deeper, the critical underground temperature limits will be exceeded, and an increasing number of mines will need to implement, expand or modify cooling systems. Surface cooling plants ha

    Oct 12, 2022