Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Effect of Pre-oxidation and Filtration on Cyanidation of Contaminated Gold from a Flotation Concentrate (677149c7-49e9-4819-8439-028f9085926e)

    By Sparrow GJ, Woodcock JT

    A sample of pyrrhotite flotation concentrate pulp assaying 15.3 g/t An, which had been prepared from an old tailing dump, was treated to extract the gold. Examination of the concentrate with an SEM sh

    Jan 1, 1990

  • AUSIMM
    Gold-Rich Porphyry Copper Deposits of the Circum-Pacific Region - an Update Overview

    Gold-rich porphyry copper deposits areimportant sources of gold in the circum-Pacific region: 26 major deposits contain >7000 tonnes of gold. The deposits occur in a variety of subduction-related sett

    Jan 1, 1990

  • AUSIMM
    Vibration Reduction to Presere the Integrity of an Aboriginal Rock Shelter Near Blast Operations

    By D P. Blair

    Rio Tinto’s Hope Downs Operations are currently mining iron ore in their South Central Pit. Prior to the commencement of mine operations, Hope Downs carried out an extensive archaeological investigati

    Nov 8, 2011

  • AUSIMM
    Flotation of Low-Grade Iron Ore in Pneumatic Cells to Produce Pellet Feed

    By J Palaci, M MelTndez, F Parra, I Rojas

    At the Huasco Pellet Plant of Compa±fa de Aceros del Pacffico, Chile, the production of iron concentrate suitable for pellet feed from a low-grade iron ore was technically evaluated. In this study, th

    Jan 1, 2005

  • AUSIMM
    Eliminating Unidentified Misfires at Xstrata ZincÆs Open Pits Through the Application of Electronic Detonators

    By R Small, S Combrinck, R Lindsay

    Maintaining your competitive edge in the growing Australian mining sector today is an arduous task. With an ever increasing demand to extract more ore, safely, complete visibility throughout the blast

    Sep 18, 2012

  • AUSIMM
    Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine

    By P Wahyono, H Vega, S Riza, P Vergara, P Gonzalez-Carbonell

    PT Freeport Indonesia (PTFI), operating in the Ertsberg Mining District in the Province of Papua, is developing the Grasberg Block Cave copper-gold mine. The site aims to output 160 000 t/d and will b

    Jul 1, 2013

  • AUSIMM
    Controlled Blasting for Civil Construction in an Urban Environment

    By R Domotor

    Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r

    Nov 8, 2011

  • AUSIMM
    Parameters in Rotary Drill Bit Life at Elura Mine, N.S.W.

    A paper presenting the results of studies carried out on rotary drill bit life at EluraMine N.S.W.Contributing parameters, including dataon drill operation and geology are compared to the performance

    Jan 1, 1985

  • AUSIMM
    Protection of Sacred Sites in the Northern Territory

    The role and policies of the Aboriginal Sacred Sites Protection Authority are described in conjunction with the provisions of the N.T Aboriginal Sacred Sites Act 1978. Comment is made on the appli

    Jan 1, 1984

  • AUSIMM
    Viscosity evaluation of hot metal containing vanadium and titanium via a novel measurement technology and the thermodynamic analysis method

    By J Wen, P Hou, W Yu, M Hu, Z Jiang, C Bai

    Vanadium titano-magnetite (VTM) is one of the important iron ore resources in the world. High viscosity and low fluidity are the basic characteristics of hot metal containing vanadium and titanium dur

    Aug 21, 2024

  • AUSIMM
    Torrington Topaz, its Geology and Economic Significance.

    By Collier D

    The topaz resource at Torrington in northern N.S.W is currently the subject of a joint research and development programme managed by Pacific Copper Ltd, This programme has culminated in a pilot top

    Jan 1, 1989

  • AUSIMM
    Algebraic optimisation of excavation alignment using the stress tensor

    By P B. Hills

    A simple algebraic method of aligning large scale underground excavations such as a crusher station or workshop or indeed any large cavern or mine layout to the optimal stress condition is outlined. T

    Nov 29, 2022

  • AUSIMM
    A Case Study In Ore Reserve Procedures At Mount Lyell

    By Rowe J

    The case study is based on the largest ore deposit at Mt. Lyell; the Prince Lyell deposit, comprising a regular lensoid mass of dissemina- ted and vein pyrite-chalcopyrite mineralisation. Reserve est

    Jan 1, 1979

  • AUSIMM
    Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut Mine

    By Tilley H. L

    The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio

    Jan 1, 1989

  • AUSIMM
    Tunnel Construction by TBM Sand Bar Hydroelectric Project

    This paper discusses the recently com- pleted TBM-driven pressure tunnel at the Sand Bar Hydroelectric Power Project. The Sand Bar Project is a diversion scheme situated on the middle fork of the S

    Jan 1, 1987

  • AUSIMM
    The Geology of the Woodcutters Lead-Zinc-Silver Mine

    By Ormsby W. R, Nicholson P. M

    Woodcutters is a polymetallic vein-style deposit hosted by sediments of the Palacoproterozoic Whites Formation which forms part of the sedimentary sequence in the central Pine Creek Geosyncline. Pas

    Jan 1, 1994

  • AUSIMM
    Elaine Dorothy Cu-Au (REE-U) Skarn Deposit

    By P Sha

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Elaine Dorothy Cu-Au (REE-U) skarn deposit in the Mt Isa Inlier, Queensland, Australia

    Mar 18, 2015

  • AUSIMM
    Analytical Approach for Stability Analysis of Rock Wedges with Soil-Infilled Joints Formed in a Tunnel Roo

    By D Oliveira

    The use of an equivalent continuum for a rock mass is not always suitable for situations where the failure is structurally controlled by discontinuities as in the case of wedges in the tunnel roof. In

    Mar 8, 2011

  • AUSIMM
    Tailings process optimisation through automation and controls integration

    By R Williams, M Baxter, D Zink, R Cunningham

    The purpose of this paper is to discuss the efficient operation of a tailings dewatering circuit comprising a thickener and filter press through proper control and automation. It is common to see thi

    Jul 23, 2018

  • AUSIMM
    Roasting and Treatment of Auriferous Flotation Concentrates

    This paper is intended to continue the subject in the light of recent work, from where it was left at the conclusion of the discussion on the excellent paper by the late Mr. Noel Haszard. The position

    Jan 1, 1939