    Seismic Stability Analysis of Sangan Iron Mine Project Tailings Dam

    By N Ganjian, A Delavar, F Rashidi Nejad

    Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft

    Jul 27, 2015

  • AUSIMM
    Topsoil Management for Long-term Mine Operation and Closure – A Case Study from Alcoa's Bauxite Mining Operations in South-west Australia

    By A Grigg, L Hackett

    Alcoa operates two bauxite mines at Huntly and Willowdale, located within the jarrah forest south-east of Perth in Western Australia. Ore reserves are shallow but extensive, and mining pits averaging

    Jul 16, 2014

  • AUSIMM
    ‘We’re Metallurgists, not Magicians!’

    By E McLean

    The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its

    Aug 8, 2011

  • AUSIMM
    Critical Assessment of Machine Learning Algorithms as Estimation Techniques for a Polymetallic Ore Deposit

    By D Misra, R Ganguli, S Bandopadhyay

    The objective of this paper is to assess the accuracy and applicability of recent state-of-art methods such as the machine learning algorithms (MLA) for mineral resource estimation. Conventional metho

    Sep 26, 2011

  • AUSIMM
    Quality Assurance and Quality Control of the Interpretation of the Geological Economic Commodity Concentrations is Important in Getting a Mineral Resource Estimate Right

    The mining industry, both here and internationally, is continually developing increasingly sophisticated software to compute mineral resource estimates, but these processes cannot compensate for a fla

    Jan 1, 2007

  • AUSIMM
    Developing and Implementing Ore-Specific Targets for the Rosebery Concentrator

    Production targets are the basis for almost every decision made by operations personnel in the daily operation of a concentrator. It is the production targets that determine how the plant is operated

    Oct 29, 2012

  • AUSIMM
    Diversity in Leadership - 'Be Free, in a Unfree World'

    Diversity; what a wonderful topic. Diversity; the condition or quality of being diverse, different, varied to the point that the very word diversity means different things to different people. As on

    Jan 1, 1996

  • AUSIMM
    The Case for an International Mining Law

    State ownership of minerals results in domestic legislation regulating mining operations. The mining industry today is dominated by a number of transnational companies, each subject to internal and ex

    Jan 1, 2004

  • AUSIMM
    Footwall Stability at the LKAB's Kiruna Sublevel Caving Operation, Sweden

    By C DahnTr-Lindqvist

    The Kiruna mine produced about 19 Mt processed iron ore in 1999 using sublevel caving. General failure in the hangingwall has been widely studied and its mechanism is rather well understood. Failure i

    Jan 1, 2000

  • AUSIMM
    Eco Underground Coal Mining Systems for Ultra-Thick Coal Seam – Utilisation of Flyash and CO2 Storage

    By A Hamanaka

    EGAT Mae Moh Lignite Mine in Thailand produces about 16 Mt of lignite annually from open-cut mining. The coal is used to generate 2400 MW of electricity. In the near future, however, the coal must be

    Nov 22, 2011

  • AUSIMM
    Inferred Mineral Resources and Gold Veins - Discussion and Case Studies

    Classification within the Inferred Resource category is based on geological judgement and the balance of extrapolation versus interpolation that the Competent Person is prepared to accept. These resou

    Jan 1, 2006

  • AUSIMM
    Selection of Mine Water Management Options Considering both Water and Energy Impacts

    By M T. Nguyen, S Vink, M Ziemski

    On any given mine site the water system is contingent upon its initial design. Through time the initial design is adjusted by a myriad of water management options in order to improve water system perf

    Nov 26, 2013

  • AUSIMM
    Chamfered backs to improve open stope stability in poor ground conditions

    By G Capes

    A novel open stope design approach is presented that delivered improved performance in a mining area with poor ground conditions at the Olympic Dam mine. During 2019, a large open stope had an unplann

    Mar 29, 2023

  • AUSIMM
    Defining Sustainability Criteria in Project Design - A Case Study of the Olympic Dam Expansion

    By H Bateman, I Cawrse, G Carnes, S Cawrse

    In developing mineral resources, the focus typically centres on the management of identified social and environmental impacts and compliance with regulatory requirements. However, opportunities to pro

    Jan 1, 2009

  • AUSIMM
    Building Sustainability Into a Project

    Organisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti

    Jan 1, 2004

  • AUSIMM
    Development of a Low-cost Instrument for Barometric Pressure Surveys

    By A S. Derrington

    High-accuracy, solid-state digital reference barometers have proven to be well suited to conducting underground barometric pressure surveys. The only problem is their expense; at least A$4000 each. Fo

    Aug 31, 2015

  • AUSIMM
    Challenges Faced by Narrow Vein Graphite Mining and Influence of Graphite Infill on Wall Stability

    By H S. Welideniya, K Ekanayake

    Carbon rich graphite deposits found in Sri Lanka are of inorganic origin and they occur as narrow steeply dipping veins. The vein width of these deposits varies from a few centimetres to metres, with

    Mar 26, 2012

  • AUSIMM
    Computer Simulation of Vibrating Screen in a Dry Classification Circuit Case Study - Gol-e-Gohar Iron Ore Processing Plant

    By A Mehrani, F Zamani, A Dehghani

    Vibrating screens play an important role in the dry classification circuit of Gol-e-Gohar iron ore processing plant. This circuit was designed to classify the autogenous mill discharge and produce a s

    Jan 1, 2007

  • AUSIMM
    Life-of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine

    By R G. Moreby, S Bluhm, FávonáGlehn, C Pascoe

    Resolution Copper Mine in Arizona, USA, is planned to be a 2000 m deep panel cave mine with virgin rock temperatures exceeding 80¦C in rock with high crystalline silica content, resulting in a very ch

    Jul 1, 2013

  • AUSIMM
    Review of Ventilation Optimisation Strategies During Longwall Moves

    By H W. Wu

    Occupational exposure limits for diesel particular matter (DPM) are progressively being adopted in a number of countries. Many of these follow the lead of the US Mine Safety and Health Administration