Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Case Study - Total Life Cycle Planning for a Greenfield Site

    Central to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl

    Jan 1, 2007

  • AUSIMM
    Sustainable Steel Plant on an Environmental Protection Area

    By C A. Chaves

    During most of its history, the metallurgical industry has been seen as a source of pollution for the environment. However, during the second half of the 20th century, as the world environmental legis

    Jan 1, 2009

  • AUSIMM
    Calcium based ternary nitrate salts for concentrating solar power applications

    By V Shrotri L Muhmood, P Gandhre

    The current work deals with the measurement of some thermophysical properties of Ca(NO3)2 based ternary nitrate molten salts as HTF (heat transfer fluid) / TES (Thermal Energy Storage) material for CS

    Jun 19, 2024

  • AUSIMM
    The Evolution of Wall Control Programs at Kidston Gold Mines

    By A Marton

    Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega

    Jan 1, 2001

  • AUSIMM
    The Composition of the Lead-Zinc Ores at Captain's Flat, NSW, II

    By Baker G

    The detailed mineral composition of the lead-zinc ores at Captain's Flat was first studied in 1942 (Edwards, 1943).At that time the workings did not extend far below the 750ft. level. Since then

    Jan 1, 1953

  • AUSIMM
    From Face to Surface – a Fragmentation Study

    By A Gustafson, D Johansson, K Jonsson

    The underground mining process, from in situ characteristics of the unmined rock mass to the final mill product with fully liberated minerals, consists of a chain of unit operations. Some of them infl

    May 9, 2016

  • AUSIMM
    The Influence of Charge Distribution on the Grindability of the Blasted Material

    By J Seccatore, G Sadao, M Cardu, G De Tomi, L Finoti, F Galvão, J Romero Huerta, A Rezende, J Bettencourt

    In the mining industry, rock blasting can be considered as the first phase of comminution. The downstream phases of comminution are mechanical, and consist in consecutive stages of crushing and millin

    Aug 24, 2015

  • AUSIMM
    Enhancing Project Value through a Designed High Pressure Grinding Roll Test Work Program

    By T Bookless, J Pownell, D Meadows

    The ever increasing trend of the gold price has meant that ore deposits that were previously considered too complex, or unattractive by virtue of their low gold grade, are now being investigated more

    Sep 26, 2013

  • AUSIMM
    Should earthquake loading be considered for open pit slope design in Australia?

    By F Weir, B Estrada

    The impact of seismic loading on open pit slope stability in Australia is often only considered where the slopes are located adjacent to tailings facilities or other major infrastructure. The debate r

    Jun 22, 2022

  • AUSIMM
    Development of the production optimiser through collaboration between Evolution Mining and Minnovare

    By C McCracken, R Landers, B Hesse

    Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to

    Mar 15, 2021

  • AUSIMM
    Practical Sampling for Online Analysis and Composite Samples of Slurries - The Art of Compromises

    In practice a sampling solution is a compromise of many requirements: the sample should be representative; the sampling system should also be reliable, less than 95 per cent availability rest

    Mar 1, 2010

  • AUSIMM
    Optical Fibres and the Communications Revolution

    Industrial and telecommunications organizations around the world are now turning to optical fibres to satisfy their growing needs for data, voice and video communications and to solve transmission pro

    Jan 1, 1984

  • AUSIMM
    Does process control sampling always have to be a compromise?

    By M Singh, R C. Steinhaus, J J. Rust

    Metallurgical process control systems in mineral plants often employ state-of-the-art monitoring analysers in an attempt to optimise plant operations and enhance mineral recoveries. These systems are

    May 9, 2017

  • AUSIMM
    æShot to ShovelÆ ù Understanding the Impact of Muckpile Conditions and Operator Proficiency on Instantaneous Shovel Productivity

    By J Battista, J Grace, I Brunton

    The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the æShot to ShovelÆ project. This

    Jan 1, 2004

  • AUSIMM
    The Application of GyÆs Formula and Sampling Best Practice at the Snap Lake Phase I Diamond Bulk Sampling Plant

    The Snap Lake Phase I project initiated a subsampling campaign on the material (kimberlite/metavolcanic/granite) mined and treated for diamonds. The campaign was aimed at determining the optimum subsa

    Jan 1, 2005

  • AUSIMM
    Redevelopment at Northparkes Following Significant Drive Closure

    By J Samosir, L A. Snyman

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    Nov 5, 2014

  • AUSIMM
    Marketing Industrial Minerals

    'Nothing happens until something is sold' This statement is not original - it is a necessary orientation for marketing industrial minerals. The most important single philosophy of marketing

    Jan 1, 1978

  • AUSIMM
    Dynamic drop testing of Sandvik’s D47 and D39 MDX bolts at the Swerim’s testing facility

    By B Darlington, L Sandberg, O Vallati

    The D47 and D39 Mechanical Dynamic Extra bolts (D47 MDX and D39 MDX) have been developed in response to the ever-increasing demand from the mining industry for rock bolts with high dynamic capacity. T

    Nov 29, 2022

  • AUSIMM
    Virtual Environment Training for Preshift Inspections of Haul Trucks to Improve Mining Safety

    By D A. Bowman, S Schafrik

    With the goal of reducing injuries and fatalities related to haul truck accidents, this research investigates technologies and intervention strategies for improving worker training using a virtual env

    Jan 1, 2008

  • AUSIMM
    Cost-Efficient Implementation of a Greenhouse Gas Reduction Roadmap in the Mining and Metallurgy Industry

    By M Russ, J Gediga

    This paper shows an economic feasible approach to implement greenhouse gas (GHG) reduction measures into the mining and metallurgy industry (MMI). The goal to improve energy consumption is directly li

    Jan 1, 2009