Search Documents

Sort by

  • AUSIMM
    Looking for an Adequate Drilling Spacing and Heterotopic Sampling û An Iron Ore Example

    By D T. Ribeiro, J F. C L Costa, J C. Koppe

    Drilling and sampling are responsible for most of the costs during mineral exploration, especially in multi-elements and polymetallic deposits, such as iron, manganese and bauxite deposits. On these d

    Sep 26, 2011

  • SME
    Underground Mining: Comparison of Methods

    By Stephen A. Orr

    Underground mining is a dynamic art and science with a diverse set of design, production, and economic criteria that must be considered before selecting an optimal method to extract the ore. While all

    Jan 1, 2008

  • ISEE
    Overpressure and Ground Vibration for Pipeline Construction Blasting - Measurements and Predictions

    By David Jones, Jeff Bregar, Damien Bell

    We have analyzed overpressure and ground vibration measurements for construction blasting for a large pipeline project. These field-measured levels have been compared to existing prediction curves in

    Feb 1, 2020

  • NIOSH
    RI 9458 - Behavior of Simulated Longwall Gob Material (33936e16-8cd5-484a-990f-c74e5f8fcfa1)

    By Deno M. Pappas

    This report presents results of a U.S. Bureau of Mines study of longwall gob material. The objective of this work was to determine material stiffness properties of the gob for use in numerical models

    Jan 1, 2010

  • CIM
    Gold Gravity Recovery in Copper Circuits at BHP Tintaya

    By Valentin Choquenaha Bombilla, Oscar Alvarez Muiloz

    "Tintaya’s basic production line is copper concentrate, which has an important gold content. The process used is flotation; the objective of the metallurgical department is to obtain the best results

    Jan 1, 2002

  • AUSIMM
    Pattern recognition in transformed data – the search for domain shapes in mine geology data

    By S McKinley, S Juras, E Uludag

    More and more, today’s mining geologists are asked to identify and create 3D value domains for multidisciplinary usage: grade definition, geometallurgical performance and geotechnical characteristics,

    Sep 20, 2017

  • NIOSH
    National Occupational Research Agenda (NORA)

    By NORA Mining Sector Council

    The National Occupational Research Agenda (NORA) is a partnership program to stimulate innovative research and workplace interventions. In combination with other initiatives, the products of this prog

    Feb 1, 2024

  • SAIMM
    Secondary Breaking Strategy For Block 4 At De Beers - Finsch Mine

    By R. D. Hull

    Paper written on project work carried out in partial fulfilment of B.Sc. (Eng.) (Mining) degree As a partial fulfilment for the degree of B.Sc. (Eng) (mining) at the University of the Witwatersrand

    Jan 1, 2002

  • AUSIMM
    PC-BC: A Block Cave Design and Draw Control System

    This paper presents an overview of a program PC-BC developed for application to the design and evaluation of block cave operations. Conventional mine planning software tools are not well suited to the

    Jan 1, 2000

  • SME
    Wireframe Construction in Resource Estimation: Methods and Practices

    By K. Zabrusky

    "Wireframe construction is an integral part of resource estimation. Wireframes control domaining of samples and data for geostatistical analysis and grade estimation. They may also provide 3D represen

    Jan 1, 2015

  • CIM
    CRIRSCO 2007 — current activities

    By J. Postle, Deborah McCombe

    "This is the third in a series of articles about the Committee for Mineral Reserves International Reporting Standards (CRIRSCO). The first article was an interview with Niall Weatherstone, Chairman of

    Jan 1, 2003

  • AUSIMM
    Metallurgical QA/QC – who needs it? The Olympic Dam experience

    By K Ehrig, V Liebezeit, E Macmillan

    The results from metallurgical test programs are used in feasibility studies for design of new plants and brownfield expansions, in long term mine plans, and to make decisions in an operating plant. T

    Sep 11, 2017

  • NIOSH
    IC 9508 - The Application of Major Hazard Risk Assessment (MHRA) to Eliminate Multiple Fatality Occurrences in the US Minerals Industry

    By A. Iannacchione

    Major Hazard Risk Assessment (MHRA)1 is used to help prevent major hazards, e.g., fire, explosion, wind-blast, outbursts, spontaneous combustion, roof instability and chemical and hazardous substances

    Jan 1, 2008

  • CIM
    The V ALMIN Code - the Australian experience "Valuation 1 Session" Mining Millennium 2000 PDAC/CIM, 5-10 March 2000, Toronto, Canada.

    By Michael J. Lawrence

    "The VALMIN Code was developed and formally adopted by The Australasian Institute of Mining and Metallurgy (AusIMM) in 1995 and a revision was issued in 1998. The VALMIN Code applies to all relevant r

    Jan 1, 2003

  • NIOSH
    OFR-84(7)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume VII - Rail Haulage Subsystem

    By C. B. Manula

    This report is volume 7 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mod

    Jan 1, 1974

  • NIOSH
    Bulletin 3 The Coke Industry Of The United States As Related To The Foundry

    By Joseph A. Holmes

    The investigations carried on at the fuel-testing plant of the United States Geological Survey at St. Louis in 1904-1907 included tests of the steaming and gas-producing qualities of many coals and of

    Jan 1, 1910

  • AUSIMM
    What Project Managers must Demand from an Economic Evaluation!

    By P Card

    Some project managers accept unsatisfactory economic evaluation modelling because they are unaware of what constitutes good practice. They tend to leave it to the evaluation specialist or others to de

    May 24, 2012

  • SME
    Eminent Domain Mineral Property Valuations: When Self-Proclaimed “Latitude” Falls Somewhere South of Competence and Ethical Obligations

    By J. M. Beck

    Mineral property appraisers engaged in eminent domain actions on properties for which mining is the highest and best use must be fully competent in all phases of mineral resource estimation, mine proj

    Jan 1, 2019

  • SAIMM
    Mechanized Bolting - On-Board Drilling Automation And A Change In The Support Regime In Low-Profile Mechanized Mining

    By A. Marek

    The safe and optimal installation of roof support remains one of the biggest challenges in underground mining today. Traditional hand-held, roofbolt installation in conventional mining has been repla

    Jan 1, 2012

  • NIOSH
    RI 6880 Drillability Studies - Statistical Regression Analysis Of Diamond Drilling

    By James Paone

    This report shows the feasibility of predicting drillability, analytically, by using regression analysis techniques. The approach is new in diamond-drilling research. Further, the study shows that thi

    Jan 1, 1966