Search Documents

Sort by

  • CIM
    Voluntary Reporting of ?Negative? GRI Indicators: Insights from Integrative Social Contracts Theory

    By K. Chotruangprasert

    This paper explores Global Reporting Initiative (GRI) reporting practices within the mining industry. Specifically, this paper investigates how and why a mining company makes voluntary reporting decis

    Aug 1, 2013

  • CIM
    Design of Pressure Hydrometallurgy Pilot Plants for the Nickel Industry

    "Pilot plants for pressure hydrometallurgy represent special design and project execution challenges. Over the past twenty years, Zeton has designed and fabricated a variety of world-class pressure hy

    Jan 1, 2017

  • AIME
  • TMS
    A Historical Overview of the Cerro Matoso Operation 1980 to 2003

    By J. R. Kiji

    The Cerro Matoso S.A. mine and smelter, in the Cordoba lowlands of northwestern Colombia, consist of a dedicated laterite nickel mine, ore blending, drying and an RKEF process to produce high-quality

    Jan 1, 2004

  • CIM
    Carbon Catalyst Assisted Atmospheric Oxidation of Pyrite with High Elemental Sulphur Yield in Ferric Sulphate Acidic Media

    By Ahmad Ghahreman, Denver Cowan, Yeonuk Choi

    "Testwork was conducted in order to compare the effectiveness of carbon based catalysts while oxidizing a gold-bearing pyrite concentrate under atmospheric conditions. Without the use of a catalyst th

    Jan 1, 2017

  • NIOSH
    RI 4759 The Short-Circuiting Contactor As An Electrical Protective Device For Coal Mine Service

    By L. H. Harrison

    In coal mines equipped with electrically driven mechanical mining equipment, the problem of protection for electrical circuits and machinery important, because the hazards of fires and explosions resu

    Jan 1, 1951

  • NIOSH
    RI 9431 - Development and Testing of a Computer-Assisted Remote-Control System for the Compact Loader-Trammer (c9fe9ae1-e51b-474a-8ffc-070d36b0f639)

    By T. M. Ruff

    A prototype mucking machine designed to operate in narrow-vein stopes was developed by Foster-Miller, Inc., Waltham, MA, under contract with the U.S. Bureau of Mines. The machine, called a compact loa

    Jan 1, 2010

  • IIMP
    Volcanogene and sediment-hosted base metal potential in the colombian cordilleras: a preliminary paleo-tectonic analysis supported by empirical examples

    By Robert Shaw

    "The paper point out the volcanogene and sediment-hosted base metal deposit from the Colombian cordilleras have been considered in the light of tectonogenic models for these deposit types, based upon

    Apr 22, 2003

  • CIM
    Single Stage SAG/AG Milling Design

    By Brian Putland

    Single stage semi-autogenous / autogenous (S/AG) milling has become a common design for a variety of ore types with the advantages of being comparatively low capital cost and flexible for future expan

    Jan 1, 2012

  • AIME
    Why Not an Electrolytic Zinc Plant in the South-western United States

    By Tenney, J. B.

    DEVELOPMENT of complex ores in the south- western part of the Rocky Mountain region has been retarded by the prohibitive distance to the nearest suitable zinc treatment plants. In the north- western a

    Sep 1, 1928

  • CIM
    Budget Control At the Hollinger Mine

    By J. W. Thomson, H. J. Lloyd, R. J. Taylor

    "THE HOLLINGER MINE has been producing gold and by-product silver almost continuously for forty-eight years. The value of current production is $10,000,000 annually from one million tons of ore. Its m

    Jan 1, 1960

  • CIM
    Data reconciliation in hydrometallurgy: applications to leaching of clay and copper solvent extraction

    By K. El-Ouassiti, M. Zouadi, C. Bazin, D. Hodouin

    Data reconciliation techniques are used to attenuate the effect of measurement errors and estimate unmeasured variables. This paper illustrates the application of data reconciliation to hydrometallurg

    Jan 1, 2005

  • TMS
    Falconbridge Dominicana Reduction Shaft Furnace Advanced Control Development

    By Lionel Ryan

    In 1996, the Dominican Republic operation of Falconbridge (Falcondo) developed a 5-year Process Control Plan in conjunction with the corporate Process Control group located in Sudbury, Ontario, Canada

    Jan 1, 2004

  • CIM
    Advances in Blast Furnace Practice at Stelco

    By D. W. R. George, J. L. Stewart

    Developments in the last decade, which have contributed to increased productivity and decreased coke rates in the iron blast furnace, are reviewed. Future progress in blast-furnace practice is also co

    Jan 1, 1966

  • IIMP
    Contract mining: an australian success story with a role to play in Latin America?

    By J. B. Greenwood

    The paper point out some reasons why contract mining should not achieve the same success in Latin America as it has in Australia. In this sense, any reasons are: the size of operation, mining industry

    Oct 6, 1999

  • CIM
    Uncertainty in the Rock Engineering Design of Post-Tensioned Anchors for Dams

    By B. Panton, J. Carvalho, E. T. Brown

    High-capacity, post-tensioned anchors have found wide-spread use in initial dam design and construction, and in the strengthening and rehabilitation of concrete dams to meet modern design and safety s

    Jan 1, 2015

  • NIOSH
    RI 4423 Investigation Of Cheever Limonite Deposit Berkshire County, Mass.

    By R. J. Burgess

    During World War II the shortage of ore revived interest in eastern iron deposits, among which -!2..c "Ile Massachusetts and Connecticut limonites. The Cheever mine, in the Richmond-Salisbury area of

    Jan 1, 1949

  • SME
    Developing a Virtual Reality Environment for Mining Research

    By J. Navoyski, B. Macdonald, W. J. Helfrich, J. L. Bellanca, B. Demich

    DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen

    Jan 1, 2019

  • NIOSH
    RI 9433 - Rock Mechanics Investigations at the Lucky Friday Mine (In Three Parts) 2. Evaluation of Underhand Backfill Practice for Rock Burst Control

    By J. K. Whyatt

    The U.S. Bureau of Mines has been conducting a series of rock mechanics investigations at the Lucky Friday Mine in the Coeur d'Alene Mining District of northern Idaho. In the present study, the e

    Jan 1, 2010

  • NIOSH
    RI 8380 Directional Drilling For Coalbed Degasification - Program Goals and Progress in 1978 (a40dd4e2-71b8-4270-b747-a462ce2daae5)

    By David C. Oyler

    The Bureau of Mines is cooperating with the U.S. Department of Energy in a directional degasification project at the Emerald mine near Waynesburg, Pa. This project is designed to combine the highly su

    Jan 1, 1979