Search Documents

Sort by

  • NIOSH
    Bulletin 116 Methods of Sampling Delivered Coal

    By GEORGE S. POPE

    This bulletin is a revision of Bulletin 63 and is published by the Bureau of Mines in order that purchasers of coal for Government, State, municipal, or private use may be informed regarding advances

    Jan 1, 1916

  • CIM
    Gas Dispersion Management In A Copper I Molybdenum Separation Circuit

    The effect of superficial gas rate distribution (Jg profile) on down-the-bank metallurgical response was tested in the rougher-scavenger bank (eight 10-m3 tank cells, 4 roughers and 4 scavengers) at H

    Jan 1, 2007

  • CIM
    Practical heat loss calculations for molten metal transport crucibles

    By E. Ferguson

    In evaluating refractory designs for cast house applications, thermal calculations are frequently performed to determine cold face shell temperatures, temperature profiles and metal freeze plane locat

    Jan 1, 2004

  • SME
    Economic Considerations Of Comminution Circuits

    By Wendi H. Cooksey

    This paper examines two comminution circuits on a hypo­thetical gold ore deposit with both small-scale (1,000 short tons per day) and large-scale (35,000 short tons per day) production rates. The most

    Jan 1, 1998

  • DFI
    Controlling Vibrations From Close-in Pile Driving

    By Patrick T, David K. Miller

    Driven piles are an effective and cost-efficient deep foundation method; however, when piles are driven near existing buildings and improvements, vibrations must be controlled to non-damaging levels.

  • SME
    A Comparative Study of Two Centrifugal Concentrators

    By A. R. Laplante

    In this paper, the performance of the Knelson Concentrator and of the batch and continuous Falcon Concentrators are compared. The units are based on different operating principles, and perform quite d

    Jan 1, 1993

  • AIME
    Engineering Council Joins National Chamber Of Commerce

    Engineering Council has been elected to membership in the Chamber of Commerce of the United States. Its representative will be Mr. Harold W. Buck, of Viele, Blackwell & Buck, Consulting Engineers, New

    Jan 12, 1919

  • SAIMM
    Personeelbestuur in die mynboubedryf

    By F. S. A. de Frey, F. C. Kruger

    Personnel management has undergone a remarkable change over the course of the past ten years. Personnel departments have played an increasingly important role, which today requires highly trained peop

    Jan 1, 1982

  • ISEE
    Comparison of Non-Electric and Electric Intiation Systems

    By H Leonard Mangum, Victor C. Bryan, Dan McCutchen

    Recently there has been an unprecedented marketing effort to promote the advantages of various non-electric initiation systems. This activity has probably been influenced by a major manufacturer's dec

    Jan 1, 1990

  • SAIMM
    Modern materials for underground support

    By M. McChesney

    Modern materials for underground support* by M. McChesney The properties required of a support material for underground tunnels are discussed and, because concrete is both economical and easy to apply

    Jan 12, 1976

  • AIME
    Employment (870b42ea-3ceb-4b74-a389-93295a67b165)

    ENGINEERS AVAILABLE (Under this heading will be published notes sent to the Secretary of the Institute by members or other persons introduced by members) Graduate mining and metallurgical engineer n

    Jan 6, 1917

  • AIME
    Reservoir Gas and Oil in the Vicinity of Cleveland, Ohio. Discussion

    By F. R. Van Horn

    WALLACE MCKEEHAN, Douglas, Ariz. (communication to the Secretary*).-In going over this report, which I have done very carefully, I find that the summary as composed deals with the various problems alm

    Jan 4, 1917

  • AUSIMM
    The Critical Path to Automated Underground Mining

    By P McCarthy

    Despite significant advances in the platform technologies that could form part of a system of mine automation, the goal of full automation in most underground mining applications remains distant. This

    Jan 1, 2008

  • AUSIMM
    Students Response to the Challenge

    By C Rees, M Predebon, J Denney

    It has been said on many occasions that æthe future of the mining industry of Australia, and indeed the world, lies in the hands of the studentsÆ. As a student, this can be a daunting, yet very exciti

    Jan 1, 2000

  • SME
    Heap Leaching 2 Metallurgical Management Of Heap Leaching: Recovery Prediction And Monitoring And Water Balance Management.

    By Mike Jahraus

    The topic I would like to throw out for discussion this morning concerns the metallurgical solution management of operating a valley fill leach facility where ore depths approach 250 feet and deeper.

    Jan 1, 1999

  • SME
    Planning For Sustainable Land Use Management In Surface Coal Mining Areas

    The present contribution examines the main components of a sustainable land reclamation program applicable to surface coal mines and the environmental threats that hinder the transition to sustainable

    Jan 1, 2003

  • CIM
    The Nine Keys to Maximizing Profits and Equipment Uptime through Inventory Management for Maintenance Parts

    By Robert Lamarre

    We will present the summary of a number of case studies whereby mining organizations have succeeded in maximizing equipment uptime by reducing the number of maintenance parts stock outs by more than 8

    Nov 1, 2011

  • AIME
    Engineers Available (64ae1ed1-caf7-413b-bee5-03c84ca78885)

    (Under this heading will be published notes sent to the Secretary of the Institute by members or other persons introduced by members.) Member, graduate Columbia School of Mines, age 35, married, best

    Jan 5, 1918

  • AIME
    Mining Congress Coal Meeting

    THE fifth annual convention of coal-operating men, with the usual exposition of coal-mine equipment, was held at Cincinnati, May 7 to 11 inclusive, and was fully up to the high standard set by previou

    Jan 6, 1928

  • SAIMM
    The effect of cost and price fluctuations on the optimum choice of mine cutoff grades

    By J. A. L. Napier

    An analytical solution to the best choice of cutoff grade for a mine is deduced for an assumed model of selective mining. It is found that this choice is determined by the constancy of a special funct

    Jan 1, 1983