Search Documents

Sort by

  • AIME
    Don'ts for the Lady Miner

    By Alicia O&apos, Overbeck, Reardon

    DIFFIDENTLY, because don'ts are rarely greeted with cheers; humbly, because I, myself, have never lined up with the irreproachables, I venture on the subject of manners for the mining camp matron

    Jan 1, 1936

  • AIME
    T. A. Rickard - Our New Honorary Member

    By Scott Turner

    HOSTS of friends will rejoice that T. A. Rickard has been given honorary membership in the Institute. It might well have been done long ago, since, when one reviews distinguished services rendered by

    Jan 1, 1935

  • ABM
    A Ultrahigh Strength Medium Mn Steel Manufactured By Warm Rolling Process*

    By HaiWen Luo, Bin Hu

    A ultra-high strength medium Mn steel with good ductility was designed and manufactured via the combination of warm rolling and V alloying, which produced not only the extensive precipitation of fine

    Oct 1, 2019

  • AIME
    Don'ts for the Lady Miner

    By Alicia O'Reardon

    DIFFIDENTLY, because don'ts are rarely greeted with cheers; humbly, because I, myself, have never lined up with the irreproachables, I venture on the subject of manners for the mining camp matron

    Jan 1, 1936

  • ISEE
    An Examination of Blasting Accidents in Tennessee 1999-2003

    By Bill Loviza, Jimmy Sanders

    This report is not everything we would like it to be. Access to information concerning unresolved legal actions is a sensitive matter. Obtaining the information presented in this report was a challeng

    Jan 1, 2004

  • NIOSH
    IC 6131 IX. Mining Laws Of Colombia ? Prefatory Note

    By A. D. Garman

    This paper presents one of a series of digests of foreign mining legislation and court decisions which is being prepared in advance of a general report relative to the right of American citizens to ex

    Jan 1, 1929

  • AIME
    Electrification of Mines

    By Graham Bright

    T HE chairman of the Mines Committee of the A. 1: E. E. for 1920-21 has had the honor of being also the chairman of a similar committee, the Mine Equipment Committee, of the A. I. M. E. It has been th

    Jan 1, 1921

  • AUSIMM
    Block Cave Evaluation

    By R J. Butcher

    Many deposits have been evaluated as potential block caves over the last 20 years due to the perceived benefit of low operating costs. However, block cave projects are typically capital intensive, wit

    May 9, 2016

  • ABM
    Development And Characterization Of Composite-coated Interconnects For Use In High And Intermediate Temperature Fuel Cells

    By Ananda Moreira Vaz Ourique de Avila

    High and intermediate temperature fuel cells (FC) are power generators characterized by high efficiency and their use in cogeneration systems. The single fuel cells are connected in series by the use

    Aug 7, 2018

  • DFI
    Session 18 "Grouting for Micropiles & Anchors"

    By Jim Bruce

    No answer required. From the drilling equipment suppliers, but the specifications must be tailored to be project-specific. Yes, the sonic technique is very interesting as we said, and it is not so muc

    Feb 10, 2003

  • SME
    Carbon Footprint Reduction in Montreal Blue Line Extension - RETC2023

    By V. Nasri, P. Jarast, M. Bakhshi

    The Montreal metro Blue Line Extension toward the northeast consists of the construction of five new underground stations. The project includes 6 kilometers of the tunnel which will be constructed usi

    Jun 13, 2023

  • CIM
    Rationale for Quantum Leap Innovations in Mine Fill

    By J. H. Nantel

    Indications are that underground mining is gaining favour with large and small mining companies due to environmental and sustainability concerns. Dramatic changes to mine fill technologies will be nee

    May 1, 2007

  • SME
    An Advanced Open Pit Mining Equipment Maintenance Program

    By D. C. Myntti

    An open pit mining equipment maintenance program, in order to be successful, must have many active segments covering the full range of equipment selection, trained personnel, repair facilities, preven

    Jan 1, 1978

  • AUSIMM
    Mine Project Risk Management

    Risk management has become an essential tool for mining companies to ensure their projects are well-managed and profit expectations are achieved. Risk management has also become a mandatory corporate

    May 24, 2012

  • CIM
    Tungsten Carbide Drilling at the Sullivan Mine

    By J. W. Reynolds

    Introduction The Sullivan mine, at Kimberley, B.C., is the principal source of ore for the Consolidated Mining and Smelting Company of Canada, Limited. Current production amounts to about 2,500,000 t

    Jan 1, 1951

  • CIM
    Fuzzy Clustering-Based Model For Productivity Forcasting

    By Farid Mirahadi

    Forecasting productivity of construction operations is a difficult but crucial task in planning construction projects. Over the past decades, many models have been developed to forecast productivity f

    Aug 1, 2013

  • CIM
    Ensuring the Furnace Integrity with Intelligent Operations, Efficient Cooling and Refined Design

    By Iina Vaajamo, Jani Jansson, Lauri Pesonen

    In pyrometallurgical operations, structural integrity of a high temperature furnace plays a crucial role in the overall safety, profitability and ecological footprint of the plant. Furnace integrity i

    Jan 1, 2015

  • SME
    Determination Of Dynamic Permeability Changes During In-Situ Leaching At Cyprus Casa Grande Operation

    Dynamic permeability is a significant hydrologic condition associated with in-situ leaching at the Cyprus Casa Grande operations. Several factors contribute to changes in the permeability conditions.

    Jan 1, 1991

  • AUSIMM
    The Tooloom Gold Project, NSW ù æForgotten But Not Gone!Æ Rediscovering a 147-Year-Old Gold Field

    By B A. Wake, G G. Lowder, M J. White

    The Tooloom gold field is located within the New England Fold Belt in the far northeast of New South Wales, approximately 130 km south southwest of Brisbane. Gold was first discovered at Tooloom in 18

    Jan 1, 2004

  • AUSIMM
    Controls on High-Grade Gold Distribution at Vera Nancy Mine

    Determining the controls of high-grade mineralisation at Vera Nancy requires careful data collection and assessment on a global and specific deposit basis. The techniques developed over 60 years ago t

    Jan 1, 2000