Collaboration and change management, keys to successful automation implementationBy D Kilkenny, D Nardini, P Kline
This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate
Mar 15, 2021
-
Quantifying the quality of cable bolt installation by acoustic testingBy M Hawkes, Z Ji Gang, Z Ming, R Hassell
As underground mines become more geotechnically challenging with increasing depth and excavation size, the requirement for ground support to be installed as per design becomes more critical. The verif
Mar 15, 2021
-
Development of the production optimiser through collaboration between Evolution Mining and MinnovareBy C McCracken, R Landers, B Hesse
Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to
Mar 15, 2021
-
Increased productivity using theory of constraints at the Argyle Diamond MineBy B Murphy, N Strong, J Albrecht
Rio Tinto’s Argyle Diamond Mine has a history of underperformance with delivery of ore from the underground operation to the surface for processing with no real clarity in sources of loss and value. I
Mar 15, 2021
-
Increased drilling accuracy leads to significant improvement in ore recovery and dilutionBy R Stimpson, B Johnson, B Hesse
During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto
Mar 15, 2021
-
Sublevel caving a narrow vein mine – Pajingo’s case studyBy J F. Carswell, G Cheshire
The Pajingo gold operation in Queensland is approximately 55 km south of Charters Towers and 134 km south-west of Townsville. The gold deposit was discovered on the northern end of the Drummond Basin
Mar 15, 2021
-
Carrapateena Crusher Station One – Optimisation and excavationBy A Mooney, G Balog, P Burns, R Brooks
This paper outlines the rationale for the location of the crusher, geotechnical analysis and basis of ground support design, design and scheduling of the chamber and supporting excavations as well as
Mar 15, 2021
-
Problem roadways in an underground decline solved through the application of Roller Compacted Concrete (RCC)By D Bruce, D Cox
The main access decline at Carrapateena mine was excavated through two different underground aquifers. In these areas of decline, pressurised water finds the path of least resistance through the rock
Mar 15, 2021
-
Developing a best practice framework for inrush risk managementBy L Manca, P B. Hills, D Tyler, N Pollington
This paper describes a collaborative project undertaken by Newcrest Mining Limited (Newcrest) and pitt&sherry to identify, develop and then implement global best practices to manage the exposure to in
Mar 15, 2021
-
Implementation of a High Energy Dissipation Ground Support SchemeBy E Villaescusa, A Kusui, R Talebi, R Hassell, C Arcaro
Northern Star Resources (NSR) operates several seismically active mines as part of its Kalgoorlie Operations. In order to successfully continue mining at depth in increasing stress conditions, strateg
Mar 15, 2021
-
Raisebore drill string recovery case studyBy M Andrew, D McTiffen, M Adams
A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th
Mar 15, 2021
-
Unlocking value in drill and blast at Olympic Dam – Lime 390 case studyBy P Vaikkattil, K Li, J Bullock
Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout
Mar 15, 2021
-
On the flipside: why cost cutting is out; revenue maximization is in and value is always kingBy H Allday
The mining industry’s attention has shifted over the last decade with the recovery from the downturn resulting in greater development of innovation and new work methods in a bid to remain competitive
Mar 15, 2021
-
A case study: how being ‘aware of now’ is making work safer at Telfer undergroundBy S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle
Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper
Mar 15, 2021
-
Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry MineBy J Say, M Hawtin, L Carlon, P Cann
Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an
Mar 15, 2021
-
An analysis of productivity in sublevel caving minesBy G R. Power
A useful way to assess potential productivity of SLC mines is by quantifying tonnes/drawpoint/day to be extracted from the mine. However limited industry information has been published to help mines b
Mar 15, 2021
-
Understanding the causes of dilution in narrow vein stopesBy S Thomas, S Ricketts, R Hassell
Northern Star Resources (NSR) operates several operations utilising narrow vein stoping operations in the Kundana area. Stope dilution performance is variable across these operations, with unplanned d
Mar 15, 2021
-
Development and permitting of an underground mine at Cowal Gold OperationsBy J Northfield, L Neesham
The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri
Mar 15, 2021
-
Considerations for the design and support of underground portalsBy M P. Sandy, R M. Stephenson
Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu
Mar 15, 2021
-
Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley OperationsBy S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans
A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success
Mar 15, 2021