Search Documents

Sort by

  • SME
    Segment Production 4.0—Automated Segment Production Using Robots

    By Stefan Mede

    Robot Supported Moulding—this is the name of Herrenknecht Formwork’s entry to the world of automated segment production. What had been considered impossible for a long time, has been achieved by Herre

    Jun 13, 2021

  • SME
    Accelerated Rehabilitation of the White Rock Tunnel - RECT2021

    By Nathan Bowersox, Zuzana Skovajsova, David M. Jurich, Brian Harris

    When unwatered after more than 50 years of operation, the White Rock Tunnel of the Upper American River Project in the foothills of the Sierra Mountains exhibited failing rockbolts and ground falls. R

    Jun 13, 2021

  • SME
    Segment Design for Exceptional Circumstances: Post Tensioning and Squeezing Ground - RETC2021

    By Eduardo Velasco, Paz Navarro, Alfonso Navarro, Claudio Cimiotti, Alejandro Sanz, Nick Karlin

    The LA Effluent Outfall tunnel is a 7-mile long, 18' internal diameter, secondary treated effluent discharge tunnel currently under construction by Dragados USA for the Los Angeles County Sanitation D

    Jun 13, 2021

  • SME
    The Use of Structural Codes in Tunneling - RETC2021

    By Harry Asche

    Tunnels are frequently specified by owners to be designed to a structural code, often a bridge code. In the USA, AASHTO have created a tunnel code, based on structural principles, the AASHTO LRFD Tunn

    Jun 13, 2021

  • SME
    Second Narrows Water Supply Tunnel—Final Design, Procurement and Construction - RETC2021

    By Gregg W. Davidson, J. Andrew McGlenn, Frank Huber

    The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet the long-term needs of a g

    Jun 13, 2021

  • SME
    Application of Surrogate Modeling for SEM Tunneling Simulation

    By Christophe Bragard, Marte Gutierrez, Haotian Zheng, Michael Mooney

    This paper proposes a framework for applying surrogate-based approaches to evaluate SEM construction, which can both benefit the uncertainty analysis in the design stage and real-time calibration duri

    Jun 13, 2021

  • SME
    Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021

    By Jamal Rostami, Wei Hu

    Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us

    Jun 13, 2021

  • SME
    A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021

    By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer

    Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast

    Jun 13, 2021

  • SME
    Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,

    Jun 13, 2021

  • SME
    Back on Track: The Downtown Rail Extension - RETC2021

    By Meghan M. Murphy, Derek Penrice

    The Downtown Rail Extension (DTX) is principal element of the planned second phase of the Transbay Joint Powers Authority’s (TJPA) Transbay Program. When complete, this regionally critical project wil

    Jun 13, 2021

  • SME
    Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021

    By Josh Willhite, Seth Pollak, Ben Seling

    The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o

    Jun 13, 2021

  • SME
    Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021

    By Gino Vogt

    In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations

    Jun 13, 2021

  • SME
    Short Startup for a High Pressure Mixshield Tunnel Boring Machine - RETC2021

    By Matthew Burdick, Andrew Rule, Erica Bailey

    The Second Narrows Water Supply Tunnel, Burrard Inlet Crossing project for the Greater Vancouver Water District entails deep shaft construction, subway sized pressurized face tunneling through highly

    Jun 13, 2021

  • SME
    Best Practice for Comprehensive Condition Assessments of Remote Tunnels - RETC2021

    By Herman Gill, Dani Delaloye, Madelyn Rubin

    The Foothill Tunnel is a remote 16-mile-long untreated drinking water tunnel in the San Francisco Public Utilities Commission’s (SFPUC) Hetch Hetchy Water and Power (HHWP) system. The 14-foot horsesho

    Jun 13, 2021

  • SME
    Performance of Tunnel Segments Reinforced with Synthetic Macro Fibers - RETC2021

    By Todd Clarke, Ralf Winterberg

    For more than a decade the tunneling industry has explored the potential and benefits of macro synthetic fiber (MSF) reinforced concrete solutions for precast tunnel segments. Parallel to industry inv

    Jun 13, 2021

  • SME
    TBM Data and Performance Monitoring on Large Diameter TBM Tunnels Lined with Shotcrete in the Himalayas—A Case Study - RETC2021

    By Gary Peach, Peter Mason

    Planning and estimating progress rates and costs for tunnelling is always best done based on experience and historic precedent. Much precedent is available but the use of data monitoring, data mining

    Jun 13, 2021

  • SME
    Construction of an Outfall Tunnel Underneath Rio De La Plata - RETC2021

    By Mirko Martini, Marcelo Benaglia, Andrea Codalli

    Riachuelo Lot 3 forms part of a sanitation programme being implemented in Argentina to relieve the Riachuelo river basin from its current contamination. The programme, by far the most important in its

    Jun 13, 2021

  • SME
    Kramer Tunnel—Challenging NATM Tunnelling in Germany’s Alps - RETC2021

    By Roland Arnold, Richard Gradnik, Martin Zeindl

    This paper presents the details of the Kramer tunnel project in the Federal State of Bavaria, Germany. This road tunnel, which has been under construction since December 2019, is the key component of

    Jun 13, 2021

  • SME
    Potential Pathways forMining Operations to Transition to Renewable Energy—a Case Study - Mining, Metallurgy & Exploration (2021)

    By Oliver W. Marsden, John O. Marsden

    This paper presents the results of a hypothetical case study that evaluates the potential transition of a large copper mining and extraction operation to 90% renewable energy. The case study considers

    Jun 4, 2021

  • SAIMM
    Automatic closed-loop scheduling in underground mining using discrete event simulation

    By F. Sundqvist, B. Skawina, J. Greberg, A. Salama, M. Astrand, P. Ekbeck

    Today’s mining operations require fast reporting and rapid rescheduling based on updated information. An automatic mine scheduling system could not only quickly reschedule but also propose alternative

    Jun 1, 2021