Differing Site Conditions and Dispute Avoidance Under the FIDIC Emerald Book for Underground WorksBy Jürg Künzle
Underground construction is a matter of dealing with the inherent uncertainty of subsurface geology. If the encountered conditions are less favorable than the expected ones, the execution of excavatio
Jun 13, 2021
-
The Bypass Tunnel: Excavation, Interliner, and Lining - RETC2021By George Schmitt, Ted Dowey, Grant Millener, Sean McAndrew, Eric Jordan
The Rondout-West Branch Bypass Tunnel is being built to bypass a substantial leak in New York City’s primary water supply tunnel. The 13,500 foot long tunnel travels 600 feet under the Hudson River th
Jun 13, 2021
-
Case Study of EPB-TBM Crossing through Boulder Cluster and Method Selected for Claim Resolution - RETC2021By Ehsan Nasiri, Keivan Pak Iman
Historically, boulders are a frequent source of problem in soft ground tunneling. It is important to attempt to make an assessment of the nature and quantity of the boulders, although in many cases, i
Jun 13, 2021
-
Tunnel Vision: Planning a Resilient 21st Century Wastewater System for Houston - RETC2021By Brian Gettinger, Jared Barber, Richard Weatherly, Shannon Dunne, Jeff Masek, Chuck Wolf, Fazle Rabbi, Jack Canfield
During Hurricane Harvey over 60% of the 39 WWTPs, including the low-lying 25 MGD Sims North WWTP, and one third of the 382 lift stations owned and operated by the City of Houston were flooded resultin
Jun 13, 2021
-
Lesson Learned During the EPB TBM Launch Using Umbilical and Muck Pump - RETC2021By D. Nebbia, R. Aliberti, F. Solesin
The launch of a Tunnel Boring Machine (TBM) is one of the most challenging activity parts of the construction of a tunnel. Challenges are coming from limited space available, learning curve, concurren
Jun 13, 2021
-
The Use of Low-Density Cellular Concrete (LDCC) in Annular Fill Applications: Kaneohe-Kailua Sewer Tunnel Case Study - RETC2021By Don Painter, Nico Sutmoller, Lori M. K. Kahikina, Brian Dorwart
This paper will address the feasibility of using low-density cellular concrete (LDCC) for an annular fill application where project conditions required pumping the LDCC material for distances of up to
Jun 13, 2021
-
Design of Large Underground Near Detector Cavern for Fermilab in Batavia, Illinois - RETC2021By David Mast, Irwan Halim, Seung Han Kim
Fermilab is constructing a large underground cavern in Limestone to house scientific equipment. The cavern will have a complex L-shaped geometry and about 215-foot depth with relatively shallow rock c
Jun 13, 2021
-
CMAR Delivery Targets Effective Management of Risks in Achieving Water Supply Objectives - RETC2021By Cary Hirner, Sarah Lothman, Chris Mueller, Savita Schlesinger, Mike Hanna, Ian Fitz-James
Loudoun Water is currently implementing a quarry to reservoir conversion that will improve water supply reliability in periods of drought and flexibility in water supply operations when turbidity in i
Jun 13, 2021
-
Toledo Waterways Initiative—Completion of an 18-Year LTCP Program - RETC2021By Leo Gentile, David Selhorst
The $528 million Toledo Waterways Initiative (TWI) was implemented by the City of Toledo in 2002 and completed in August 2020. Toledo is one of many US cities required to implement a Long-Term Control
Jun 13, 2021
-
InSAR Monitoring of Tunneling Surface Displacement - RETC2021By Brian Young, Ben Pantony
Interferometric Synthetic Aperture Radar (InSAR) has played an integral role in many large scale tunneling projects globally. Until recently, it has been regarded as a complementary monitoring tool. O
Jun 13, 2021
-
Tunnel Spitzenberg—Tunnel Drive Hits a Historic Quarry - RETC2021By Pafos Busch, Martin Fischer, Johannes Jaeger
The Spitzenberg Tunnel is a 600 m (1,970 ft) long twin tube motorway tunnel on Germany’s Autobahn A44 between Kassel and Eisenach. Since flexibility was considered to be very important in the continuo
Jun 13, 2021
-
Under Pressure: Geotechnical Forces and Conditions at Work on the Ohio River Tunnel Project - RETC2021By Ross Goodman, Jesse Salai
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges such as crown and invert instability due to the overstress condition affecting the strata above, below, and in the
Jun 13, 2021
-
Crossing an Environmentally Sensitive Shore Area— Micro-Tunneling in the Australian Outback - RETC2021By Taner Aydogmus
The A$29 billion Chevron-operated Wheatstone Project is one of Australia’s largest resource projects. Located at Ashburton North, 12 kilometers west of Onslow in Western Australia, the project will co
Jun 13, 2021
-
Lessons Learned at the Trampas Dam Inlet/Outlet Tunnel - RETC2021By Todd Kilduff, Paul Wilkinson
Microtunneling is rarely a straight forward “business as usual” endeavor. More often than not, these projects take twists and turns that require on the fly, out of the box solutions to get the project
Jun 13, 2021
-
The Role of Small Diameter Tunneling for Pipeline Installations - RETC2021By P. Schmäh
Nowadays, small diameter tunnels are increasingly considered in pipeline projects as an alternative for sensitive crossings or when soil conditions limit the use of conventional pipeline installation
Jun 13, 2021
-
Influence of Large Deep Excavations on Closely Underlying Subway Tunnels and Design of Mitigation Measures - RETC 2021By Giuseppe Gaspari, Xiangrong Wang
The pandemic emergency is forcing transit agencies to define strategies allowing social distancing, which are more challenging in underground interchange stations in crowded downtown cores. Toronto Tr
Jun 13, 2021
-
Use of a GBR to Deliver Risk Management and Value— City Rail Link, Auckland - RETC2021By Tom Ireland, Sumi Eratne
The approach to Risk Management during the procurement of major projects often has a significant outcome on the ultimate successful delivery of a project. The $NZ4.4B Auckland City Rail Link project i
Jun 13, 2021
-
Final Lining Construction of a SEM Cavern–Regional Connector Transit Project - RETC2021By Christophe Bragard, Rebecca Reeve
The Regional Connector Transit Corridor (RCTC) Project is a 1.9-mile-long metro light-rail extension project that traverses the historical core of downtown Los Angeles, California. This project aims t
Jun 13, 2021
-
Case Study on Innovatively Launching a Full-Size TBM in Challenging Ground - RETC2021By John Newby, Mahmood Khwaja, Bernard Theron, Janice McGovern, Bernard Catalano, Michael S. Schultz
Launching a full-size pressurized-face Tunnel Boring Machine (TBM) in difficult ground conditions is always challenging. Recently, few projects have innovated the process by scaling the trenchless met
Jun 13, 2021
-
Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi
The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op