Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The underdog mechanical alternative for tailings dewatering: the screw pressBy S Whitton, W Wimmler, L Wimmler
“Given the increasing scrutiny of the mining industry and its relatively poor record with regards to mine tailings management, increased requirements to minimise water usage (often accompanied by very
Jul 1, 2021
-
Critical state soil mechanics in filtered TSF designBy J Rola
This paper outlines a laboratory-based design method, founded in critical state soil mechanics, for identification of an appropriate compaction specification to ensure dilative conditions prevail acro
Jul 1, 2021
-
Dredging fine tailingsBy S H. Burgmans, B Anderson
This paper aims to define the specific challenges relating to dredging fine tailings from an above ground storage facility for transferral to a mined-out pit. In addition, it compares dredging and min
Jul 1, 2021
-
Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagementBy C N. Hatton, K Ward
Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con
Jul 1, 2021
-
TerraFlowing_TM – an innovative and flexible method for tailings dewateringBy D Stephenson, N R. Steward
“TerraFlowingTM” is a dewatering process that addresses both the value proposition of Tailings as a Resource™, and the safe storage of tailings. “TerraFlowingTM” incorporates two stages of cyclone dew
Jul 1, 2021
-
A preliminary benchmarking numerical modelling exercise for tailings‐flow runout analysisBy S Liu, N M. Rana, A Take, N Ghahramani, D Clohan, S McDougall, S G. Evans, H J. Chen
Tailings dam breaches have caused significant life loss, social, economic and environmental damage in recent years. The term "tailings-flow" refers to various forms of tailings outflow movement result
Jul 1, 2021
-
Rock Tunnels at High Water Pressure: Non-Continuous Pressurized TBMs Versus Slurry - RETC2021By Brad Grothen, Lok Home
The choice of TBM type is never easy, but it becomes especially challenging when faced with a hard rock tunnel with expected high water flows and pressure. Slurry Shield tunneling has a long history o
Jun 13, 2021
-
Management of the Water Inflows During Construction of the Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) - RETC2021By Francesco Chiappalone, Miriam Piemontese, Lance Waddel, Paolo Perazzelli, Emidio Tamburri, Roberto Schuerch
The Three Rivers Protection & Overflow Reduction Tunnel is part of the Long-Term Control Plan of the City of Fort Wayne, Indiana (USA). The 4.9 m internal diameter tunnel, of length approximately 7.5
Jun 13, 2021
-
Selection and Design Factors for a Variable-Density TBM at the I-64 Hampton Roads Bridge-Tunnel Expansion Project (HRBT) - RETC2022By Alejandro Sanz, Juan Luis Magro, David Mazeyrie
The Hampton Roads Bridge-Tunnel Expansion Project (HRBT), initiated by the Virginia Department of Transportation (VDOT), will add two new 1.5-mile TBM bored tunnels to the two existing immersed-tube t
Jun 13, 2021
-
North Auckland Line—Tunnel Refurbishment - RETC2021By Shu Fan Chau, Innes Duncan, Harry Asche, Bill Newns
The North Auckland Line (NAL) in Northland, New Zealand, is being upgraded to pass Hi-Cube containers. The line includes many tunnels and bridges which need to be refurbished to improve structural cle
Jun 13, 2021
-
Construction of the Plymouth Tunnel by SEM Based on a Permanent Shotcrete Liner for The Purple Line Project in Maryland: A Case Study - RETC2021By Nicholas Tabor, Norbert Fuegenschuh, Richard Taylor, Jean-Marc Wehrli
The Plymouth Tunnel forms part of the 16-mile long route of the Purple Line Light Rail Project promoted by the Maryland Transit Administration. The tunnel is approximately 1,220 feet in length with a
Jun 13, 2021
-
Geotechnical Investigation and Design for the Sister Grove Outfall Tunnels - RETC2021By Michael Schultz, Gregory Sanders
In 2017, the North Texas Municipal Water District (NTMWD) initiated the design of the Sister Grove Regional Water Resource Recovery Facility (SGRWRRF) to provide additional treatment capacity for futu
Jun 13, 2021
-
Calibration Techniques for Discrete Element Method Analysis in Soft Ground TBM Applications - RETC2021By Glenn Mongillo
Discrete Element Method (DEM) software has been successfully used to simulate various machine/soil interactions and provide insight for industries such as mining and bulk material processing. This pap
Jun 13, 2021
-
Quantification of Tangible and Intangible Benefits of Digitalization in Tunnel Construction - RETC2021By Angus Maxwell, Jacob Grasmick
As the tunneling industry continues to adopt Tunnel 4.0, digital twins of the tunnel construction site are becoming standard requirements for tunneling projects. However, the benefits of these remain
Jun 13, 2021
-
Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray
The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und
Jun 13, 2021
-
Real Challenges of Digging a Shaft in Free Phase Oil and Hydrocarbons - RETC2021By Ehsan Alavi, Sanjeer Yogendran, Savreet Singh
The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel Project in Toronto extends approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north under Bayv
Jun 13, 2021
-
Dustless Hard Rock Tunneling Methods - RETC2021By Cody Giroux, Homer Scurlock, Michel Wasag
Silica and Crystalline Quartz exposure continues to be a serious health threat to nearly 2 million workers in the United States, including more than 100,000 working in high risk jobs such as abrasive
Jun 13, 2021
-
Review of Measured Activity Times and Their Impacts on Machine Utilization in Operation of Selected TBMs - RETC2021By P. Nelson, R. O’Connell, J. Rostami
Tunnel boring machine (TBM) system utilization is a critical factor for predicting machine performance. The process of estimating machine performance, including rate of penetration (ROP) and machine u
Jun 13, 2021
-
Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021By David Mast, Amanda Foote, Mina Shinouda
The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5
Jun 13, 2021
-
Respirable Crystalline Silica Dust—Practical Impacts and Solutions in Tunnelling - RETC2021By Rainer Antretter
While respirable crystalline silica (RCS) dust that arises in industrial production mostly emanates from point sources and can be well mitigated, the extraction of dust is much more difficult in under
Jun 13, 2021