Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Bio-Grout Based Soil ImprovementBy Terzis D. PhD, Katterbach M.
While awareness around the environmental impact of existing grout materials and chemical binders is increasing rapidly, biotechnologies are growing traction as sustainable alternatives in groundwork o
May 1, 2022
-
Embodied Carbon Assessment For A Multi-Phased Development Pile Testing StrategyBy Jack Taggart, Chris Barker
Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor
May 1, 2022
-
Characteristics And Application Potentials Of Ground Improvement With Semi-Rigid Inclusions Based On An Innovative Composite Of Polymers And GravelBy Pratter P., Boley C.
Polymers are well established in geotechnical applications, for example in ground improvement, where the polymers act as a binder that, when cured, holds the grains together by adhesive and cohesive f
May 1, 2022
-
Digital Automation Of Geotechnical Sites – The Development And Essential Role Of An Industry Standardised Design FormatBy Scott White, Pishun Tantivangphaisal, Andrew Bell, Chris Barker
There has been considerable advancement in recent years in the tools, both software and hardware, available to allow efficient digitalization of site records during the construction of geotechnical wo
May 1, 2022
-
Field Test Verification Of Ground Bearing Pressure Under Rig Tracks And Implications For Working Platform DesignBy Steffen Schweizer, Tadeusz Brzozowski, Alfred Koller, Michał Topolnicki, Jürgen Wäger, Grzegorz Sołtys
A full scale test has been conducted to determine ground bearing pressure under rig tracks. The track loads were recorded in real time using Liebherr's Ground Pressure Visualisation system, and the ve
May 1, 2022
-
Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, MalaysiaBy Vijayakumar Viramuthu, Martin Heinrich
Tower of Lot L, L1 & M, Kuala Lumpur City Centre when completed would stand 700 m tall. This Mega tall Skyscraper would merely be less than 500 m away from the world tallest Twin Tower, the Petronas T
May 1, 2022
-
Piling Adjacent To Rail Tunnels At King’S Cross CentralBy David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott
This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600
May 1, 2022
-
Applying The Carbon Hierarchy To Geotechnical ContractorsBy J. E. De Waele, J. J. Lee, M. J. Mulheron, Luke R. Deamer
There is increasing demand for geotechnical contractors to commit to carbon reduction, net zero or science based targets. A lot of focus has therefore been placed on using low carbon materials and low
May 1, 2022
-
Re-Use Of Old Pile Foundations In AmsterdamBy Remco Offenberg, Marcel Bielefeld, Martijn van Delft
The question of the continued suitability of existing foundations arises when the function of the superstructure changes. This can occur when the superstructure is replaced or when the existing struct
May 1, 2022
-
A New Data Interpretation Approach For Pile Thermal Integrity TestingBy Quanchen Sun, Mohammed Z. E. B. Elsahife, Anthony Fisher, Chris Barker, Jennifer Schooling
A review of the literature shows that pile integrity is a significant concern in pile construction. Recently, a new integrity test, thermal integrity profiling (TIP,) has been put into use in foundati
May 1, 2022
-
Axial Capacities Of Drilled Displacement Piles Predicted By Spt And Cpt Based MethodsBy Sam Warren, Antonio Marinucci, Genesis Z. Figueroa, Anne Lemnitzer
Drilled Displacement Piles (DDP) provide an ideal deep foundation solution that combines the benefits of ground improvement with traditional advantages of piling systems. This paper consolidates data
May 1, 2022
-
Recent Experiences With Optical Fibre Monitoring Of Geotechnical StructuresBy Gust Van Lysebetten, Monika de Vos
The objectives of monitoring geotechnical structures can be very diverse, including optimisation of the design, quality control, long term performance assessment, and approval of innovative execution
May 1, 2022
-
Estimation of Optimum Line of Extraction for Continuous Miner Workings and Development of Continuous Miner Stability Index (CMSI) using 3D Numerical Modeling and Statistical ApproachBy Sunil Bodakunta, Sreenivasa Rao Islavath
The abstract highlights the importance of determining the optimum line of extraction in continuous miner workings for improved safety and productivity. The study investigates three extraction techniqu
Apr 28, 2022
-
Analysis of the behavior of the weld mesh and the rolled mesh against static loads and a dynamic impact, to design the overlap according with the connection method. - RASIM2022By R. Brändle, R. Luis-Fonseca, R. Cornejo, G. Fischer, G. Von Rickenbach, J. Jarufe
Rock damage around underground excavations has been an important hazard in mines and tunnels. Rock dilation generates buckling that needs to be contained before it causes damage to equipment or safety
Apr 26, 2022
-
Insights into practical decisions surrounding hydraulic fracturing trials from numerical modeling - RASIM2022By Ulf B. Andersson, Christina Dahnér-Lindkvist, Bruno Figueiredo, Jessa Vatcher, Jonny Sjöberg, Joel Andersson
Hydraulic fracturing to precondition the rock mass in high seismic risk environments has great potential. Unfortunately, there are many unanswered questions about how to best implement a hydraulic fra
Apr 26, 2022
-
Applied Seismic Monitoring for Decision Making in Deep Hard Rock Mines - RASIM 2022By Brad Simser
Several case histories from Glencore’s Sudbury Operations show how passive seismic monitoring data is used for geotechnical decision making. The data comes from three different seismic arrays monitori
Apr 26, 2022
-
Integrated Mine Monitoring System on Managing Seismicity Risks Impact to Mining Production in PT Freeport Indonesia - RASIM 2022By Amri Priambodo, Ian Leslie, Valérie Laflèche, Agustina Ratnaningrum, Robin Paine, Andrianus Sinaga, Willem de Beer
Freeport Indonesia consists of surface, civil and underground mining areas exposed to numerous geotechnical risks and hazards. PTFI uses various monitoring systems (Micro-Seismic, Firefly Light System
Apr 26, 2022
-
Establishing a testing criteria to relate the in-situ performance of static and dynamic capable mesh - RASIM 2022By M. du Plessis, J. P. Gouvea
Mesh based areal support is commonly applied in South-African deep-level gold mines. It forms part of an integrated support system that can cater for both rockfall and rockburst incidents. The applica
Apr 26, 2022
-
Proactive measures to evaluate geotechnical risk in development for deep mining – Onaping Depth Project case studyBy B. Simser, T. Butler, A. Hall
The longterm future of Glencores’ mining operations in the Sudbury basin area of Ontario, Canada likely depends on mining deposits at depths below two kilometres. To gain a better insight into the roc
Apr 26, 2022
-
Evaluation of Rockburst Hazard by Accelerated Numerical Modeling of Stressed State and Induced Seismicity - RASIM2022By Liliana Rybarska-Rusinek, Aleksandr M. Linkov, Ewa Rejwer-Kosińska
Joined modeling of stressed state and induced seismicity is a means to join geomechanics with seismic observations. When applied to quantifying rockburst hazard, it provides, on one hand, estimations
Apr 26, 2022