  • SME
    TBM Tunnel Logistics Management on the Longest Outfall Tunnel in the Middle East - NAT2022

    By H Vigil, G. Peach

    Long tunnels with only one access shaft pose many program problems for logistics, combine these with the requirement to drive directly out under the seabed for 10.2 km, and the program issues become e

    Dec 1, 2022

  • SME
    Considerations for Conveyor Belts in Tunneling Applications - NAT2022

    By Ginger L. Hustrulid

    Conveyor belts are a critical component in tunneling projects. This paper reviews current design considerations for conveyor belts. Rubber compounding differences to meet local fire resistance regulat

    Dec 1, 2022

  • SME
    Single Tube Versus Twin Tubes for Subway Systems - NAT2022

    By Mahmoud Sepehrmanesh, Verya Nasri

    The purpose of this paper is to outline the advantages and disadvantages of single tube and twin tubes for subway systems. Different aspects such as diameter of the tunnel (tunnel spaceproofing), conf

    Dec 1, 2022

  • SME
    A Tunneled Solution for the Cemetery Brook Drain in Manchester, New Hampshire - NAT2022

    By Frederick McNeill, John Harper, Mahmood Khwaja, Shawn Lavoie, Timothy Cloughert, David Polcari

    City of Manchester, NH, is implementing a 20-year plan to control and significantly reduce overflow of its sewer system. The long-term control plan had called for large scale box culvert installation

    Dec 1, 2022

  • SME
    Tunnel Rehabilitation Through Historic Landslides in Laguna Beach - NAT2022

    By Trenton Cohen, Joseph McDivitt, Shimi Tzobery, Joseph Sinacori, Scott Zylstra

    The 2-mile Beach Interceptor Sewer Tunnel was constructed in 1954 to then-current mining and construction standards. Due to its lifespan and deteriorating condition it is now being stabilized and reha

    Dec 1, 2022

  • SME
    Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022

    By Adam Bedell, Jack Raymer, Brad Crenshaw

    Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There

    Dec 1, 2022

  • SME
    Implementing BIM Underground on Progressive Design-Build Atlanta Plane Train West Extension Project - NAT2022

    By Jeff Fontana, Daniel Ebin, Eric Westergren, William Currier

    The PMott MacDonaldlane Train Tunnel West Extension (PTTWE) Project at HartsfieldJackson Atlanta International Airport includes the extension of the existing automated people mover system and terminal

    Dec 1, 2022

  • SME
    Vintage TBM Cuts Months Off Schedule in San Antonio - NAT2022

    By Cody Edwards, Ross Webb

    5 miles of soft ground tunnel excavation for the SAWS W‑6 project finished months early despite difficult conditions. Success was achieved using TBMs and other equipment built long before most of the

    Dec 1, 2022

  • SME
    Underwater Tunnel Repair with Stainless Steel Segmental Liner - NAT2022

    By Matthew Goff, Russell Lutch

    The Great Lakes Water Authority (GLWA) operates the largest regional water authority in the State of Michigan. Two of the tunnels supplying raw water to the system from the Detroit River are the Sprin

    Dec 1, 2022

  • SME
    Risk Modelling Techniques for Complex Tunnelling Projects from Deterministic to Probabilistic Methods: Have We Done Enough? - NAT2022

    By P. Sander, M. Spiegl, J. Reilly, A. Van Droogenbroeck

    Although the outdated idea of calculating risk as the deterministic product of its likelihood and impact is not entirely a thing of the past, a multitude of organizations have adopted the usage of pro

    Dec 1, 2022

  • SME
    Improved Contracting Practices and Ground Risk Management Using Geostatistics - NAT2022

    By Jacob Grasmick, Bill Newns

    Despite ongoing digitization and “hardware” technological advances, geotechnical uncertainty remains the most significant risk in underground and tunnel construction. And, whilst they are commonly hel

    Dec 1, 2022

  • SME
    The Next Generation of Mixed Ground Tunnel Boring Machines - NAT2022

    By Brad Grothen

    What is the most economical way of tunneling in mixed ground that may experience high pressures? Non-continuously pressurized, mixed ground Tunnel Boring Machines (TBMs) are being utilized to deal wit

    Dec 1, 2022

  • SME
    Unprecedented In-Tunnel Diameter Conversion of the Largest Hard Rock TBM in the U.S. - NAT2022

    By Evan Brinkerhoff, Steve Chorley

    The largest hard rock TBM ever to bore in the USA, an 11.6 m diameter Robbins Main Beam TBM, recently underwent a planned in-tunnel diameter change to a more compact 9.9 meters. The first-of-itskind c

    Dec 1, 2022

  • SME
    Trenchless Utility Relocation Addresses Environmental Impact for Channel Crossing - NAT2022

    By John D. Hanifin, C. Kevin Moon, Eric C. Wang

    Value Engineering on Connecticut DOT’s Walk Bridge selected the trenchless option for utility relocation to address the channel crossing’s environmental concerns. The design and construction considera

    Dec 1, 2022

  • SME
    Design and Construction Challenges for the North Temple Tunnel - NAT2022

    By Todd Kilduff, Michael Tinney

    The North Temple Tunnel pedestrian underpass in Salt Lake City, UT was built using a pipe canopy method that met significant challenges in potentially running ground conditions. Kilduff Underground En

    Dec 1, 2022

  • SME
    Environmentally Friendly Soil Conditioning for EPB TBM: The State of Environmental Considerations in North America and Around the World - NAT2022

    By T. Murt, C. Oñate

    In recent years, environmental considerations have played a prominent role in underground construction projects. The management and disposal of the muck produced by an EPB TBM is an important aspect o

    Dec 1, 2022

  • SME
    Built to Last? A UK Initiative to Manage Tunnel Infrastructure - NAT2022

    By Martin Knights

    The UK Industry is preparing a new guide on Tunnel Asset Management that reflects current industry advances, in developed technological innovation and evolving tunnel asset owner requirements. This wi

    Dec 1, 2022

  • SME
    Slurry Wall Construction in Coarse-Grained Soils - NAT2022

    By J. Andrew McGlenn, Greg Emslie, Murray Gant

    The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet a growing population’s lon

    Dec 1, 2022

  • SME
    Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022

    By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent

    The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit

    Dec 1, 2022

  • SME
    Newly Adopted Structure Criteria for BART Underground Facilities—Industry Update - NAT2022

    By Samer Sadek, Phoebe Cheng, Changmo Kwon, Myat Ohn

    BART Facilities Standards (BFS) Structural Criteria is a living document that governs planning, design, and construction of all BART projects. Since its development, the document undergoes incremental

    Dec 1, 2022