Search Documents

Sort by

  • AUSIMM
    Selection Criteria for Open Pit Production Equipment û Payload Distributions and the æ10/10/20Æ Policy

    By R J. Hardy

    The aim of this study is to examine the volumetric and mass movement characteristics of load and haul operations using statistical modelling of relatively large samples of bucket loads that are transp

    Sep 26, 2011

  • AUSIMM
    A Practical Approach to Truck Dispatch for Open Pit Mines

    By D M. Silva, J C. Alves

    According to the literature, material transportation represents 50 per cent of the operating costs for an open pit mine. In this context, this paper proposes a multistage approach for dynamic truck di

    Sep 26, 2011

  • AUSIMM
    Localised Uniform Conditioning in the Multivariate Case - An Application to a Porphyry Copper Gold Deposit

    By W Assibey-Bonsu

    The paper provides a brief review of the multivariate uniform conditioning and the localised multivariate uniform conditioning techniques and presents a case study based on a porphyry copper gold depo

    Sep 26, 2011

  • AUSIMM
    Prediction of Acid Gas Generation in the Petroleum Industry

    By M R. Asef

    Although generation of environmentally harmful hydrogen sulfide is considered to be related to sour gas fields, sweet gas reservoirs and waste fluids, travertine springs and geothermal fields may also

    Sep 26, 2011

  • AUSIMM
    Contemporary Criteria of Open Pit Long-Term Production Scheduling

    Production scheduling of open pit mining is a key area as it deals with the management of operating cash flows of mining companies. The efficiency of long-term schedules is usually assessed with econo

    Sep 26, 2011

  • AUSIMM
    Interactive Modelling and Visualisation of Large Deposits Using Linear Octrees

    Large deposits present computational challenges to todayÆs commercial orebody modelling systems that are based on conventional block models. We describe a system that is specifically engineered to mod

    Sep 26, 2011

  • AUSIMM
    An Integer Programming Model for Optimisation of a Heavy Media Coal Preparation Plant

    By J Zhou

    This paper discusses the implementation of a mixed integer linear programming model for a coal preparation plant. The plant considered consists of primary and secondary heavy media cyclones, hydrocycl

    Sep 26, 2011

  • AUSIMM
    Critical Assessment of Machine Learning Algorithms as Estimation Techniques for a Polymetallic Ore Deposit

    By D Misra, R Ganguli, S Bandopadhyay

    The objective of this paper is to assess the accuracy and applicability of recent state-of-art methods such as the machine learning algorithms (MLA) for mineral resource estimation. Conventional metho

    Sep 26, 2011

  • AUSIMM
    A Non-Parametric Bayesian Framework for Automatic Block Estimation

    By A Melkumyan, F Ramos

    This paper addresses the problem of prediction of grade variables over volumes (block estimation) for an autonomous mine. Resource estimation is usually concerned with the prediction of the quality of

    Sep 26, 2011

  • AUSIMM
    "Development of a Real-Time Adherence to Mine Plan Tools as Part of an Integrated Remote Mine Control Centre"

    By S D. Dessureault

    In one of North AmericaÆs largest mines, which contains more than six active coal-producing faces, mine controllers must meet the complex challenge of adhering to the mine plan while also ensuring cus

    Sep 26, 2011

  • AUSIMM
    Multi-Disciplinary Engineering Research and Development Skills for Mining û A Case Study

    By S Van Duin, I Porter

    This paper discusses how advanced manufacturing technology (AMT), which is fundamentally reliant on and developed via multi-disciplinary skills, has benefitted non-mining industries, and what lessons

    Sep 26, 2011

  • AUSIMM
    Application of Simulation Technology to the Design of Coal Clearance Systems

    Longwall mining operations have been in place in Australia since the early 1960s. This mining method is currently used to extract the bulk of coal obtained from underground mines in Australia (CSIRO,

    Sep 26, 2011

  • AUSIMM
    Mining Network and the Security Question

    By A Huebner, A Noack

    Companies all over the world are very sensitive concerning their IT and network security. In most network connected technical installations and machines however, network security is not taken into acc

    Sep 26, 2011

  • AUSIMM
    Eight-Dimensional Planning Construction of an Integrated Model for Mine Planning Involving Constructability

    By E Rubio, N Morales

    A common practice in the mining industry is to decompose the planning process into different tasks, so the overall process and specific schedules can be constructed easily. Nevertheless, currently the

    Sep 26, 2011

  • AUSIMM
    Multivariate Geostatistical Simulation via Joint Approximate Diagonalisation û A Case Study

    By J Ferreira

    To speed up multivariate geostatistical simulation it is common to transform the set of attributes into spatially uncorrelated factors that can be simulated independently. One decorrelation method is

    Sep 26, 2011

  • AUSIMM
    Robust Decision Making û Application to Mine Planning Under Price Uncertainty

    By F Grobler

    Many projects fail because project performance in unfavourable economic conditions was not anticipated at the investment decision stage. This type of failure may have been avoided through the selectio

    Sep 26, 2011

  • AUSIMM
    Prediction of Burden at the Sungun Copper Mine by Artificial Neural Network

    By H Khoshrou, A Siamaki

    Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b

    Sep 26, 2011

  • AUSIMM
    Total Integrated System Simulation for Master Planning of the Dalrymple Bay Coal Chain

    By B Olsson, R Norman, M Volz

    Australia has seen unprecedented demand for coal exports in the last ten years and this demand is set to expand further still according to many analysts. This rapid increase in demand has placed press

    Sep 26, 2011

  • AUSIMM
    A New Approach to Flexible Open Pit Optimisation and Scheduling

    By A Galli

    Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee

    Sep 26, 2011

  • AUSIMM
    A New Metaheuristic Algorithm for Long-Term Open Pit Production Planning

    By C Niemann-Delius

    The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new

    Sep 26, 2011