Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Conveyor Design for Safety and MaintenanceBy R. T. Swindeman
"INTRODUCTION This paper will discuss the topics in the recently released Conveyor Equipment Manufacturers Association’s (CEMA) Belt Conveyors for Bulk Materials, 7th edition, that deal with safety an
Jan 1, 2015
-
Project DevelopmentBy Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake
The business objectives of a metallurgical project determine targets and constraints, such as the range of products, production capacities, in-service dates, and capital and operating cost parameters.
Jan 1, 2015
-
Solving Mine Drainage Water Issues with Peat-Based Sorption MediaBy P. Eger, D. Green
"The Soudan Mine was Minnesota’s first iron mine, operating from 1882 to 1962. The mine was donated to the State of Minnesota in 1963 and became a state park in 1965. The mine discharge contains eleva
Jan 1, 2015
-
Sustainable Mining in a Buddhist Country: The Case of ThailandBy J. Kretschmann, K. Sakamornsnguan
"Sustainable development is an influential ethical concept in modern mining management. However, the concept is not culturally neutral because it is based on Christian, Western values. These values ca
Jan 1, 2015
-
Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye ShaftBy K. Lombard
"‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof
Jan 1, 2015
-
Load-Deformation Based Design of Deep Mixing for Supporting MSE Walls at Kitimat LNG, BCBy Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li
"Detailed design of an extensive deep mixing (DM) scheme using the Cutter Soil Mixing (CSM) technique was completed for foundation support of mechanically stabilized earth (MSE) walls for Kitimat Liqu
Jan 1, 2015
-
Sustainability in Plant DesignBy Ben C. McLellan, Philip J. Bangerter, Andrew Murphy, Glen D. Corder, Damien Giurco
Sustainability now forms a critical part of metallurgical plant design. In addition to compliance with requirements and corporate principles, design engineers must also consider how community and soci
Jan 1, 2015
-
Moving Towards a Reliable Assessment of Deformability of Rock Masses: Examples from Large Dams FoundationsBy S. Ianos, C. Vibert
Type and shape of large dams founded on rock depend upon the expected deformation of their foundation. Their design consequently requires the assessment of the deformability of the rock mass at large
Jan 1, 2015
-
Effect of Fe on the Evolution of Microstructure and Elevated Temperature Properties in Al-Mn-Mg 3004 AlloysBy X. -G. Chen, K. Liu
Nowadays, great interests are rising on aluminum alloys for the applications at elevated temperature, driven by the automotive and aerospace industries requiring high strength, light weight and low co
Jan 1, 2015
-
Carbon Dioxide for PH Control in Mineral ProcessingBy D. Tahija
"Carbonic acid prepared on-site from carbon dioxide gas is widely used in water treatment and increasingly in some industrial applications. It has not seen extensive use in mineral processing but is a
Jan 1, 2015
-
Reconciliation along the Mining Value ChainBy A. S. Macfarlane
"SynopsisMetal accounting and reconciliation is an increasingly important governance issue in all mining operations, in that it is required, from a risk management perspective, that the company is in
Jan 1, 2015
-
Mine Occupational Safety and Health Leading Practice Adoption System (Mosh) Examined – The Promise and Pitfalls of this Employer-Led Initiative to Improve Health and Safety in South African MinesBy M. Hermanus, N. Coulson, N. Pillay
"SynopsisThis paper assesses the effectiveness of the Mine Occupational Health and Safety Leading Practice Adoption System (MOSH) and its potential to improve mine health and safety in South African m
Jan 1, 2015
-
Reducing Life Cycle Costs of Active Treatment for Selenium and Arsenic in Mine Waters and Metallurgical Waste StreamsBy O. Lopez
"Stringent regulations and increased arsenic presence in ore bodies being exploited have created the need for cost effective and environmentally compliant technologies to remove selenium and arsenic f
Jan 1, 2015
-
Low Speed Asynchronous Motors for Mill ApplicationsBy V. Matthews
"INTRODUCTION Typical grinding electrification requirements are defined by high power, constant torque and slow speed. Dual pinion mills also include a need for tight tolerances in torque between the
Jan 1, 2015
-
The Safe Use of Controlled Blasting in Construction and MiningBy Alyse Munro Hindley
The increasing negative public opinion toward blasting has led to stricter regulations and increased costs. This paper outlines alternative methods of rock excavation and the safety regulations and ce
Jan 1, 2015
-
Pyrrhotite Flotation and its Selectivity Against Pentlandite in the Beneficiation of Nickeliferous Ores: An Electrochemistry PerspectiveBy H. R. Manouchehri
"Pyrrhotite (Po) is one of the most abundant sulfide minerals in processing industry and must be rejected in most cases. Particularly, Po rejection and its selectivity against pentlandite (Pn) have lo
Jan 1, 2015
-
Results of Discrete Event Simulation in a Large Open Pit MineBy S. R. Dindarloo
"Truck-shovel systems are the dominant material loading and haulage machinery in open pit mining operations. Optimal selection, sizing, and allocation of this capital intensive equipment is highly des
Jan 1, 2015
-
The use of Geosynthetics in Underground WorksBy C. Yoo
"Geosynthetics engineering has made phenomenal advances during the last decade in areas of manufacturing as well as practical applications. As a result, geosynthetics are now being recognized as essen
Jan 1, 2015
-
The Spatial Aspect of the Long-Term Open Pit Mine Sequence Optimization"The paper treats the spatial aspect of mine sequence optimization. This aspect is revealed in the context of determination of the optimum number of cutbacks of an open pit mine. Cutback mining is a d
Jan 1, 2015
-
Preventing Coal Waste Impoundment Breakthroughs into Underground Mines: How well are we doing?By J. F. Mack, P. R. Michael, J. M. Shapaka, S. J. Self, M. W. Richmond
"On October 11, 2000, an estimated 306 million gallons of water and coal waste slurry drained from an impoundment in Martin County, eastern Kentucky into an adjacent underground mine. Approximately 23
Jan 1, 2015