Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Application of Statistical-Analytical Methods in Ground Control Engineering
By Hamid Maleki
Rock mechanics models are “data-limited,” i.e., one seldom knows enough about a rock mass to use computational models unambiguously. Statistical methods, however, are capable of being applied where t
Jun 25, 2024
-
43rd ICGCM 2024 ORGANIZING COMMITTEE
By SME SME
List of 43rd ICGCM 2024 ORGANIZING COMMITTEE
Jun 25, 2024
-
Application and Effectiveness Measurement of Ground Consolidation Products in Longwall Mining
By Richard Campbell, MEHMET KIZIL, Ismet Canbulat, Serkan Saydam
The design and effectiveness of ground consolidation to regain stability of longwall faces vary widely and are often based predominantly on-site precedence or what were considered successful applicat
Jun 25, 2024
-
Standardised Testing and Assessment of Ground Consolidation Products and the Application of the Data
By Richard Campbell, Claire Pirona, MEHMET KIZIL, Ismet Canbulat, Stephen Giese, Ravindu Goonawardene, Edward Steed, Serkan Saydam
The Australian longwall mining industry spends millions of dollars per year on proactive and reactive ground consolidation applications across most of the operations currently in production. The desig
Jun 25, 2024
-
Ground Support Optimization Using a Structured Strata Management Process in Wide Set-up Room Roadways at West Elk Mine
By Bob Munz, Ry Stone
To facilitate the installation of the longwall equipment for each extraction panel, West Elk mine develops set-up room roadways that are between 26.5 and 30.5 feet wide. Historically at the mine, the
Jun 25, 2024
-
Polyurethane Foam and Alternatives for Void Filling Applications
By Delbert Hamilton, Christopher Snyder
In the last three years there have been four uncontrolled heating events in mines that have been attributed to the use of polyurethane foam as a void fill product. These heating events are due to the
Jun 25, 2024
-
Risk Mitigation for the Big Walnut Sewer Tunnel Construction in Columbus, Ohio - NAT2024
By Rob Herr, Irwan Halim, Heather Marsh
This project will expand sanitary sewer within the City of Columbus. It consists of 2.5 mile long, 72-inch finished diameter pipe grouted inside 10.8-foot diameter tunnel excavation in shale. This pap
Jun 23, 2024
-
Value Engineering for the Shoreline Consolidation Sewer: An Example of Collaboration Between Owner, Engineer, and Contractor - NAT2024
By Colin Irwin, Adrian Naranjo-Castillo, Christopher Petta, Eric Zarobila
The Shoreline Consolidation Sewer is a CSO control project in Cleveland, Ohio that requires the installation of 5,000 feet of 72-inch inside diameter pipe using microtunneling methods. After award, th
Jun 23, 2024
-
XXL Pipe Jacking: Technological Aspects of Large-Diameter and Long-Distance Drives - NAT2024
By Peter Schmäh
Pipe-jacked tunnels are considered for a large variety of applications from water and sewage, cable ducts to challenging pipeline crossings or landfall construction. In most cases, Slurry MTBMs are us
Jun 23, 2024
-
Lessons Learned from Larger Diameter Waterview Road Tunnel to Smaller Diameter CRL Rail Tunnel in Auckland, New Zealand - NAT2024
By Matt Bilson, Ritesh Mahajan, Antoni Kuras, Wataru Okada
The Waterview Tunnel comprises twin 2.4 km long 13.1 m internal diameter three lane road tunnels in Auckland, New Zealand. The City Rail Link (CRL) is a 3.45 km long, 6.24 m internal diameter twin rai
Jun 23, 2024
-
TBM Tunneling Between the Westridge Marine Terminal and the Burnaby Terminal in British Columbia - NAT2024
By Jeff Reid, Mohamed Maghari, Nicholas Joens
The Burnaby Mountain Tunnel was an integral part of the Trans Mountain Expansion Project. General Contractor, Kiewit Ledcor TMEP Partnership (KLTP), contracted with McNally Construction to build an un
Jun 23, 2024
-
Extended Application Ranges for EPB-Shields in Coarse-Grained Soils, the Lower Olentangy Tunnel Project Case History - NAT2024
By Elisa Comis, David Chastka, Miriam Piemontese, Maria Chastka
The Lower Olentangy Tunnel (LOT) Project involves the construction of a 17,000 ft (5,200 m) long, 12 ft (3.65 m) internal diameter Combined Sewer Overflow (CSO) tunnel. The tunnel is excavated by usin
Jun 23, 2024
-
Big Data in Design-Build: Hampton Roads Bridge-Tunnel Expansion Supplemental Site Investigation - NAT2024
By Martha Gross, Amanda Wachenfeld, Brian Keaney, Jean-Michel Charpentier, Frank Perrone
The Hampton Roads Bridge-Tunnel (HRBT) Expansion widens the existing four-lane bridgetunnel corridor to eight lanes through construction of two parallel tunnels, interstate widening, and bridge expans
Jun 23, 2024
-
SAWS W-6 Upper Segment: Construction for Future Generations - NAT2024
By Jason Swartz, Gerardo Gomez, Henry Leighton
San Antonio has experienced sustained growth for decades, putting increased pressure on existing wastewater infrastructure. In June 2013, San Antonio Water System (SAWS) reached a Consent Decree agree
Jun 23, 2024
-
Segmental Lining Design for the Hampton Roads Bridge-Tunnel - NAT2024
By Botond Beno, Dave Watson, Danny Read
The Hampton Roads Bridge-Tunnel (HRBT) Expansion widens the existing I-64 four-lane bridge-tunnel corridor to eight lanes through construction of two parallel tunnels, interstate widening, and bridge
Jun 23, 2024
-
Tunnel Euralpin Lyon Turin CO8-Design of Temporary Support Profile of Base Tunnels and Cross-Passages - NAT2024
By Elisa Comis, Barbara Bitetti, Julien Pepiot, Stefano Lione, Francesc Rich
The new Lyon-Turin railway project involves the construction of a 57 km twin-tube tunnel between France and Italy. Pini France (project leader) and Systra-SWS are the designers of Construction Site 8
Jun 23, 2024
-
Is International Experience of Risk-Based Decision Making for Road Tunnel Safety Applicable in the Unique US-American Regulatory Environment? - NAT2024
By Arnold Dix, Oliver Heger, Bernhard Kohl
In the USA, risk-based decision making has not been a common approach to tunnel safety in the past, but this is changing, as concepts such as “equivalency” in the NFPA 502 framework gain acceptance in
Jun 23, 2024
-
Tunneling Through Reef Structures: Identification, Characterization, and Potential Impacts - NAT2024
By Jon Ike Isaacson, Michael Miller, Jarek Trela
Despite reef structures being relatively common in carbonate rocks around the world, tunneling experience in reefs is extremely rare. Impacts and risks associated with reef tunneling through these geo
Jun 23, 2024
-
A 108-in Storm Tunnel Underneath Active Taxiways and Apron at O’Hare International Airport - NAT2024
By Tim M. Benson, Adam L. Lamanna, Carolina Martinez-Gutierrez, Mark J. Stephani
The Lower Concourse C Extension (LCE) 108-in Storm Sewer consists of a 2,797-foot long, 27 to 55-foot deep, 108-in I.D. storm sewer tunnel. Situated beneath active taxiways and a terminal apron at Har
Jun 23, 2024
-
Design and Construction Challenges at the Piney Branch CSO 049 Storage Tunnel in Washington, DC - NAT2024
By Ritika Kundu, Moussa Wone, Amanda M. Morgan, Tatiana K. Proctor
The Piney Branch CSO 049 Storage Tunnel (PBST) will be the last major project for the DC Clean Rivers Program. The project includes construction of a 2,200-foot-long, 18-foot-internal-diameter storage
Jun 23, 2024