  • AUSIMM
    Vibration control blasting for low stability final walls

    By G Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Nov 30, 2018

  • AUSIMM
    Single pass drill, install and inject self-drilling resin bolt application in poor ground

    By T Roberts, D Faulkner, G Watt

    Traditional mechanised resin rock bolting in hard rock underground mines requires the installation of resin capsules into a pre-drilled hole prior to the rock bolt being spun into a hole to mix the re

    Nov 30, 2018

  • AUSIMM
    Proneness of competent over-stressed intact rock to violent fracturing

    By B L. Sainsbury, M F. Lee, A Penney

    For most practical rock engineering purposes, stress versus strength conditions around underground openings for which rock masses fail and their various modes of failure, are reasonably well-understoo

    Nov 30, 2018

  • AUSIMM
    Forecasting mine seismicity – towards a more established methodology

    By A Vakili, F Harvey, H Greaves

    Mine seismicity is one of the most difficult geotechnical risks to manage in seismically active mines. There are currently some established empirical and statistical methods that provide quantitative

    Nov 30, 2018

  • AUSIMM
    Research on supporting technology for production level roadways of block caving in Pulang Copper Mine

    By X Feng, X Zhang, W Sun, Y Zhe, K Hou, B Zhao, H Liu

    Pulang Copper Mine, being China's largest newly built mine using block caving, boasts an annual production capacity of 12.5 million tons. Production level and roadway stability hold the key to the

    Nov 30, 2018

  • AUSIMM
    Bingham Canyon Mine – from adversity to excellence

    By M Robotham

    In April 2013, Rio Tinto Kennecott Copper’s (RTKC) Bingham Canyon mine experienced what is arguably the world’s largest ever in-pit slope failure. The failure initiated along a major, continuous, low-

    Nov 30, 2018

  • AUSIMM
    Evolution of rock fill consolidation at Pajingo Gold Mine

    By J Carswell, K McTyer

    The Pajingo gold operation in Queensland is approximately 50 kilometres south of Charters Towers and 134km south-west of Townsville. The resource was discovered in 1983 and first open pit gold product

    Nov 30, 2018

  • CIM
    CIM Mineral Exploration Best Practice Guidelines

    By CIM Mineral Resource, Mineral Reserve Committee

    The CIM Mineral Exploration Best Practice Guidelines (the Exploration Guidelines) have been prepared to assist professional geoscientists and engineers to conduct consistently high-quality work in ord

    Nov 23, 2018

  • ABM
    Fundamental Properties Of High Performance Molds For Aluminum Die Casting

    By Hirohide Kamada, Gustavo Scarpim

    The increase in industrial demand is responsible for a consequent evolution in the process of injection of aluminum under pressure (Die Casting) to achieve requirements such as; greater geometric comp

    Nov 22, 2018

  • ABM
    Technical Knowledge And The Use Of High Speed Applied In Increasing Productivity In The Metisa Tool

    By Carlos Renato Inchoste Meure, José Ernesto Boff

    Nowadays, many companies have the idea where to be occupied is to be productive, this work aims to show with practical tests that to get the best performance of the machine with tools of high performa

    Nov 22, 2018

  • AUSIMM
    Incorporating economic variability into a strategic planning framework

    By E Holloway

    The optimisation of an open pit mine can be broadly split into two stages, the first being the ultimate pit optimisation (and subsequent stage designs), and the second being schedule optimisation. Mac

    Nov 21, 2018

  • AUSIMM
    On the sources of complexity in contemporary and future mining projects

    By J Sykes, W Treasure, A Saleem, A Trench, S Ulrich, R S. Davies

    Below-ground technical complexity remains a traditional source of project challenge. Above-ground challenges then augment this complexity, including in the domain of commodity marketing. All challenge

    Nov 21, 2018

  • AUSIMM
    New technologies that will potentially enable processing of complex orebodies

    By F Shi, G Ballantyne, K Runge

    There has been minimal innovation in the methods used to process an ore over the last 50 years. Productivity increases have largely resulted in increased equipment size without implementation of paral

    Nov 21, 2018

  • AUSIMM
    Strategic thinking about long-term ‘above ground’ orebody complexity using scenarios

    By T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench

    The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as

    Nov 21, 2018

  • AUSIMM
    Development of an empirical geo-metallurgical model that unlocks value of the mineral resources at Yandi Mine

    By P Gilroy

    In recent technical investigations that were triggered from ore for rail shortfalls at Yandi, BHP Iron ore has identified a gap in resource knowledge relating to geo-metallurgical characteristics that

    Nov 21, 2018

  • AUSIMM
    Can the concept of the circular economy help unlock complex orebodies?

    By G Corder

    The aim of the circular economy is to accelerate the transition from a conventional linear take-make-dispose economic model to a circular model. It is restorative and regenerative by design and aims

    Nov 21, 2018

  • AUSIMM
    Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, Indonesia

    By H Indirawati, R Ayres, A Nur Kasnanto, S Konopa

    As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current

    Nov 21, 2018

  • SAIMM
    Techno-Economic Evaluation of BASF’s New High-Temperature Solvent Extraction Reagent

    By J. J. Taute, S. J. Archer

    "BASF Mining Solutions has developed a new-generation copper solvent extraction reagent that offers significant benefits over standard extractants currently available to the industry. As the name sugg

    Nov 1, 2018

  • SAIMM
    The Mutoshi Project — Part I: Metallurgical Test Work, Process Design, and Project Delivery

    By N. Tatalias, P. Ilunga, M. Lampi, J. Edwards, K. Valkama, M. Nicolle, D. Samal

    "Developing a greenfield mining project is a complex exercise: doing so in an increasingly volatile, uncertain, and ambiguous global economy adds significantly to this complexity. In the context of an

    Nov 1, 2018

  • SAIMM
    Innovative Process Design for Copper-Cobalt Oxide Ores in the Democratic Republic of Congo

    By C. van der Merwe, R. Lumbule, J. Kgomo

    "The mining industry in the Democratic Republic of Congo has seen a significant expansion in copper and cobalt production in recent years. The greater proportion of this expansion has arisen through p

    Nov 1, 2018