Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimization of Tellurium and Antimony Extraction from Residue Generated in Alkaline Sulfide Leaching of Tellurium-Bearing Alkaline Skimming Slag Using Central Composite Design Mining, Metallurgy and ExplorationBy Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu
A possible process for extracting tellurium and antimony from a residue generated in alkaline sulfide leaching of telluriumbearing alkaline skimming slag was proposed. The central composite design was
-
The effectiveness of several enclosed cab filters and systems for reducing diesel particulate matter - SME Transactions 2011By A. Cecala, J. Noll, J. Organiscak
Many underground metal/nonmetal mines are using enclosed cabs on mining equipment to reduce the exposure of miners to diesel particulate matter (DPM). However, some enclosed cab systems may not be mee
Jan 1, 2011
-
Shaft Sinking And Ramp Excavation, Which Method For What ConditionsBy D. R. McMullin
The purpose of this paper is to provide a method for mine planners and engineers to evaluate on a conceptual basis if a shaft or a ramp is most suited for their particular underground access requireme
Jan 1, 1994
-
A Mine Design Procedure For Underground CoalBy G. T. Lineberry
A systematic, comprehensive, balanced approach is presented for underground coal mine design, capable of being standardized and generalized. This approach epitomizes professionalism and must preceed t
Jan 1, 1987
-
WTC 2016 attracts more than 2,300 professionals from around the worldBy Steve Karl
"The International Tunnelling and Underground Space Association (ITA) held its 42nd General Assembly along with the 2016 World Tunnel Congress (WTC) April 22-28 in San Francisco, CA. The event was co-
Jun 1, 2016
-
Phosphate In The Kola Peninsula, U. S. S. R.By H. M. Woodrooffe
In the U.S.S.R. three of the world's major-known phosphate deposits are located. These have an estimated reserve of 2,600 million short tons of contained phosphorus. The best known lies in the "K
Jan 1, 1972
-
Physical And Chemical Treatment On Spent Electrical Vehicle Module Of Lithium Secondary BatteryBy J. Sohn
The most promising near-term alternative to fuel cell driven vehicles is probably Hybrid Electric Vehicle (HEV or EV) technology. HEV technology combines the best characteristics of fuel-driven engine
Jan 1, 2010
-
Employing Operation Excellence to Optimize Underground Haulage SystemsBy J. Sidhom, W. Fourie
"As the mining industry continues to face difficult challenges the need to persistently focus on productivity and utilization of labor and equipment costs will intensify. With these challenges in mind
Jan 12, 2017
-
Yunkang Coal Mine is Shenxi Province's Biggest ProducerRecent expansion programs have made the Yunkang underground coal mine the number one producer in Shenxi Province. The mine is the newest in the Datong Coal Administration, currently rated at around 3
Jan 3, 1980
-
Ventilation Modeling of a Low Seam Coal Mine to Optimize Ventilation and Access an Additional ReserveBy B. A. Ashley
In 2007, Rosebud Mining Company (RMC) opted to extend the reserve base of Tracy Lynne Mine by developing through a sandstone channel. The extension provided access to approximately 6 million addition
Feb 23, 2014
-
Separation of Fe and Mn from manganiferous iron ores via reductive acid leaching followed by magnetic separationBy Soner Top
In this study, a process to separate manganese and iron from manganiferous iron ores by reductive acid leaching followed by magnetic separation was conceived and experimentally tested. In the leaching
-
More than 100 technical sessions at 2015 SME Annual ConferenceBy Chee Theng
"So many talks, so little time.One of the toughest challenges associated with attending the SME Annual Conference and Expo is deciding how to allocate one’s resources. After accounting for keynote and
Jan 1, 2014
-
Establishment Of Trees And Shrubs On Mining Spoils With Direct Seeding (Ghiona Mountain, Central Greece)By G. Brofas
The reforestation potential of bauxite mining spoils by seeding was examined on this research work. The experimental plot was established on the location Strofi Koukouvista 5, Ghiona Mountain. The exp
Jan 1, 2002
-
Tailings Management in the Canadian Arctic – Echo Bay’s Lupin MineBy Hugh R. Wilson
Echo Bay's Waste Management Program for its Lupin Mine was developed in response to the terms and conditions of the water license issued to the mine in 1981 by the Northwest Territories Water Boa
Jan 1, 1991
-
When The Bill Comes Due: Understanding and Managing Tailings Influenced Groundwater at the Butte Superfund Site. A Historical PerspectiveBy R. D. Williams
INTRODUCTION In a very real sense, Butte, Montana is where the copper came from that won two world wars. The price for that unrestricted mining and smelting of copper came due in 1983 when Butte was
Jan 1, 2019
-
The Underground Main Fan Study at the Waste Isolation Pilot PlantBy Keith G. Wallace, K. M. (Chris) Chmura, Kirk H. McDaniel
The Waste Isolation Pilot Plant (WIPP) performed a feasibility analysis for the purpose of either modifying, supplementing, or replacing its two main mine fans. The WIPP, located near Carlsbad, New Me
Jan 1, 1997
-
Use of MIMO models in spreadsheets for the control of a column flotation circuitBy K. Terhaar, K. Prisbrey
The objective was to determine operating protocols for a lead and silver column flotation cleaner being considered for installation at Sunshine Precious Metals Inc. 's Kellogg mill in Northern Id
Jan 1, 2002
-
Wave Trend Crossing A New Tool For Detecting Fires In A Mine Employing Diesel EquipmentBy James R. Boulton
Fire detection using Carbon Monoxide sensors is based on the assumption that a rise in the level of Carbon Monoxide in the atmosphere over a fixed, predetermined ambient level is indicative of a fire.
Jan 1, 1991
-
Gold Plant Start-Up Performance – The Financial ImpactBy G. R. Tostengard
Gold plant performance during the start-up period, which extends until capacity production is sustained, has a major impact on the internal rate of return and the net present value of gold projects re
Jan 1, 1988
-
Determination Of Optimum Cutoff Grades - IntroductionBy Victor Rudenno
Cut-off grade is one of the most critical parameters affecting project cash flow. Its sensitivity is due to the number of other parameters that are correlated with any change in its value. Changes in
Jan 1, 1979