Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improved Trigger Action Response Plan Development Based Upon Mine-specific Data

    By D Cliff, B Belle

    Trigger action response plans (TARPs) are inherent to managing multiple hazards such as high gas content with multiple coal seams, high spontaneous combustion propensity, heat and ventilation. TARPs a

    Aug 31, 2015

  • AUSIMM
    Mount Isa Copper Mines ù Role of the Mining Engineer

    By B J. Andrew, M R. Daley

    Mount Isa Copper Mines is a world-class mining operation producing approximately six million tonnes of ore per annum. With over 50 years of mining history and over 76 million tonnes of underground res

    Jan 1, 2005

  • AUSIMM
    Adjusting Initiation Direction to Domains of Rock Mass Discontinuities in Aitik Open Pit Mine

    By N Johansson, D Johansson, A Beyglou, H Schunnesson

    As demand for optimisation of mining processes increases, more attention is drawn to blast performance and fragmentation improvement. Fractures and discontinuities are among the most influential facto

    Aug 24, 2015

  • AUSIMM
    Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse Reject

    Coal washery wastes comprise tailings, finer than 0.5 to 0.1 mm depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings slurr

    Jan 1, 1998

  • AUSIMM
    A Cost Benefit Analysis to Explore the Optimal Number of Blast Movement Monitoring Locations

    By J Loeb, D Thornton

    Blast movement measurement is a key component of grade control, enabling mines to carry all of the precision involved in locating ore blocks, through a chaotic blast, to production. A monitoring syste

    Aug 18, 2014

  • AUSIMM
    Development Strategy of the Trident Underground Gold Mine

    Avoca Resources LimitedÆs Higginsville Gold Project has a resource base of over 1 300 000 oz of gold. The Trident underground mine, which forms the basis of the project development, has a resource bas

    Jan 1, 2008

  • AUSIMM
    Automated Drilling Features for Improving Productivity and Reducing Costs in Underground Development

    By J Välivaara

    The mining industry will face numerous challenges over the next 10–15 years as new deposits are likely to be more remote and lower grade and existing deposits will be mined deeper. As a result, mines

    May 9, 2016

  • AUSIMM
    Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case Study

    Throughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c

    Nov 25, 2010

  • AUSIMM
    Isasmelt and IsaMills ù Models of Successful R&D

    MIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen

    Jan 1, 2002

  • AUSIMM
    Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational Performance

    By R Hargreaves, C Morley

    The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r

    Aug 18, 2014

  • AUSIMM
    Sampling and Analysis for Public Reporting of Portable X-ray Fluorescence Data Under the 2012 Edition of the JORC Code

    By G M. Jeffress, D C. Arne

    There are two discrete aspects to collecting portable X-ray fluorescence (pXRF) data to obtain reliable results and to comply with reporting requirements under the 2012 edition of the JORC Code (JORC,

    Jul 29, 2014

  • AUSIMM
    High-speed Video – An Essential Blasting Tool

    By S Wellink, D Chalmers, D Adermann, C Martin

    The practice of recording blasts for quality control purposes has been conducted for several decades. However, at the low frame rates of a standard video camera, essential data is frequently missed as

    Aug 24, 2015

  • AUSIMM
    Management of Acid Drainage in the Australian Minerals Industry

    Confirmation that acid drainage (AD) was a significant environmental issue for the Australian minerals industry came in 1992 with the first national workshop on the topic. Subsequently the extent of A

    Jan 1, 2003

  • AUSIMM
    Cultural Challenges in Chinese/Australian Mining Mergers and Acquisitions - A CEOÆs Perspective

    By Y Zhu, W Liang, P Knights

    In recent years, Chinese companies have invested billions in Australian mineral exploration, development and processing. In 2008 - 2009 alone, the Foreign Investment Review Board approved $26.4 B of i

    Nov 20, 2012

  • AUSIMM
    ‘It Seemed Like a Good Idea at the Time ...’ Common Mistakes in Geometallurgy

    By P Kittler

    In the spectrum of mining-related disciplines, geometallurgy sits between resource geology and metallurgical engineering. Unlike its neighbours, it is a relatively young discipline and its concepts, p

    Sep 5, 2011

  • AUSIMM
    Presentation of Certificate of Honorary Membership to Sir Ian McLennan, K.C.M.G., K.B.E.

    By W. M. LONIE

    Address by the President of the Institute (Mr W M Lonie) in making the presentation of the Certificate of Honorary Membership to Sir Ian McLellan, K.C.G.M, K.B.E. Address by Sir Ian McLellan after acc

    Jan 1, 1979

  • AUSIMM
    Long-Hole Drilling for Gas Emission Control at Appin Colliery NSW, Australia

    By Saghafi A, Kelly M, Williams R. J

    A two year program of research into the feasibility of long-hole drilling for improved gas emission control has been undertaken at Appin Colliery. State of the art equipment was employed involving

    Jan 1, 1988

  • AUSIMM
    Gold and Base Metal Mineralisation in the Central Pine Creek Geosyncline

    By Butler I. K, Nicholson P. M

    There are four main types of base metal and gold mineralisation recognised in the central Pine Creek Geosyncline. These are stratiform, polymetallic veins, stockwork/concordant gold-quartz veins and

    Jan 1, 1994

  • AUSIMM
    Wall control blasting – the influence of engineering geology on blast design

    By T N. Little

    This paper is concerned with the influence of engineering geology on design of Wall Control Blasts. In the Introduction, the Blast Management Framework and the Blast Design Requirements classification

    Jun 22, 2022

  • AUSIMM
    Modification and adsorption of triazine collectors onto pyrite surfaces

    By X Zhang, Y Zhu, P E. Ngoepe, P P. Mkhonto, W Xiong, L Han, L Lu

    The triazine molecules have not been given much attention and they are potential collectors that may positively impact the mineral processing industry. The adsorption of triazine as collectors such as

    Aug 24, 2022