Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
XCT investigation on the generation of fatigue in autogenous grinding pebbles and its contribution to pre-weakening before fracture
By J Kuva, M Parian, B I. Pålsson
One of the main factors affecting the suitability of an ore for autogenous grinding is the ore’s competency, ie providing enough critical stones for the grinding process. Several experimental test rou
Aug 24, 2022
-
An Overview of Surface Rock Support for Deformable Ground Conditions
By M P. Sandy, V Louchnikov, V Eremenko, M Orunesu, O Watson
"Surface support is a key component of most ground support systems which are applied as a means of reducing the risk of rockfall occurrence and maintaining serviceability of mine development. Surface
Mar 24, 2014
-
Mining Scenario Analysis and Mine Variable Value
By B E. Hall, J Poniewierski, A J. Hills
Following a review of life-of-asset work at MMG’s Rosebery mine in which a proposal to increase production from 0.8 Mt/a to 1.2 Mt/a was mooted, questions were raised as to the seemingly arbitrary rea
Mar 24, 2014
-
"Sampling and Test Work Protocol Development for Geometallurgical Characterisation of a Sheeted Vein Gold Deposit"
By Y Xie, L O’Connor, S C. Dominy
"Sheeted vein gold deposits are characterised by multiple subparallel veins and free milling gold. In situ heterogeneity of mineralisation results in grade and process parameter variability, which wil
Jun 15, 2016
-
The Use and Optimisation of Ferrous Feed at the Whyalla Blast Furnace
By G Caddy, M Middleton, S Kerec, R Keil, J Tsalapatis
Arrium’s OneSteel Whyalla Steelworks in South Australia is a fully integrated plant which operates a single blast furnace. The key operational objective has been to maintain high process availability
Jul 13, 2015
-
The Future of the Global Mining Sector
By T Goldsmith
The mining industry is cyclical, but those are more than normal business cycles. In the early 2000s the industry saw the start of China as a game changer for the mining industry which lead to catch ph
Aug 18, 2014
-
Innovative Use of Screw Press Filtration in Tailings Dewatering Plant Design
By D Nieuwkerk, V J. Absolon
"Screw press technology is an innovative approach to tackling the growing pressure to conserve water and minimise the environmental impact of mineral tailings disposal. The principles of the technolog
Sep 1, 2014
-
Cost-Benefit Comparisons of Ecological Risk Against Water Management Options in the Finniss River System, Australia
Quantitative probabilistic ecological risk assessment has been used to evaluate the likely effect on fish diversity and abundance of filtered and bioavailable metals in streamwater affected by acid dr
Jan 1, 2003
-
Stability of Hydraulic Backfill Barricades
Hydraulic backfill is generally retained in stopes using permeable barricades. Mitchell et al (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades expe
Jan 1, 1998
-
Project Delivery
By E Skinner, G Lane
Project delivery strategies are determined by project context, business case requirements, scale of project, market conditions, ownerÆs capability and preference, contractorÆs experience, resource and
Jul 15, 2013
-
Pit Backfilling - Managing Chemically Reactive Mine Wastes and Achieving Rehabilitation Objectives
By A A. Puhalovich
The placement of chemically reactive mine wastes in mined out pits (æpit backfillingÆ) is increasingly seen by industry as best practice to manage long-term environmental risks. This is primarily beca
Jul 10, 2012
-
The Role of Evaporitic-Shale Sediment Packages in the Localisation of Copper-Gold Deposits: Copper Canyon Area, Cloncurry
By J I Stewart
The Copper Canyon deposits, occur in proximity to the regionally distinctive formational boundary between the Staveley Formation and Marimo Shale. The mineralisation here is associated with breccias
Jan 1, 1994
-
Dingo – an optimisation tool to solve complex short interval control at Telfer underground mine
By S Graskoski
The allocation of boggers and trucks at Telfer’s sublevel cave mine is currently assigned by manual techniques, with decision-making primarily dependant on the judgement of the operators and mine cont
Oct 16, 2017
-
Computer-Based Resource Estimation in Accordance with the 1999 JORC Code
By P Hanna
Following the Busang fiasco, more detailed guidelines were appended to the latest revision of the JORC Code released in September 1999 (JORC, 1999). Although the definitions and terminology essentiall
Jan 1, 2000
-
An Analysis of Blasting Profitability and Productivity
The mining industry is quite often faced with declining selling prices for its products in the face of rising prices for the input cost resources that it uses. Blasting is a key activity within the mi
Jan 1, 2001
-
Pulp Sampling Techniques for Steady State Assessment of Mineral Concentrators
The importance of proper planning, preparation, and execution of a steady state sampling campaign for metallurgical plant assessment must not be underestimated. Careful planning can increase the am
Jan 1, 1976
-
The Mine Manager's Toolkit
As the surrounding environment continues to change and evolve, mine managers face a changing climate of expectations. TodayÆs mine managers must juggle competing pressures to deliver sound social, env
Jan 1, 2006
-
Forecasting Life-of-Mine Deformation and Seismic Potential at Rosebery Mine Using a Mine Scale Non-Linear Numerical Model
By W Zirima
A detailed, mine scale non-linear numerical model of Rosebery mine has been built for the purpose of simulating life-of-mine global deformations. The model was calibrated using observations of displac
Jan 1, 2008
-
Functional Performance of Ball Milling Circuits – A Plant Metallurgist’s Tool for Process Characterisation and Optimisation
By O Arafat, K M. Bartholomew
A voracious consumer of energy and grinding media, the modern ball milling circuit has a huge direct cost impact on a mineral processing operation. Through optimisation, grinding also has the potentia
Sep 1, 2014
-
Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?
By G Hancock, A Kemp, I Taylor
The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T
Jul 16, 2014