Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Storys Creek Remediation Program

    By J Miedecke

    A metalliferous mine has operated at Storys Creek from the 1890s to 1979. Storys Creek drains from a pristine catchment and National Park and remains as the most degraded stream from historic mining i

    Jan 1, 2003

  • AUSIMM
    Computer Simulations to Enable Continuous Blending to Two Plants at Sishen Mine From the Medium-Term Point of View

    Sishen uses a state-of-the-art tracking system to track material from its position in blast blocks through various stockpiles and crushers. Qualities are blended directly to the crusher as opposed to

    Jan 1, 2005

  • AUSIMM
    Field Characterisation of Two Full-Scale Waste Rock Piles

    By D J. Williams, G W. Wilson, S, A B. Tran

    A comprehensive field program was implemented to evaluate the internal structure and hydrology of two full-scale waste rock piles. The excavation of waste rock dumps for in-pit disposal at the two min

    Jan 1, 2003

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • AUSIMM
    Mount Isa Mines - 1100 Orebody, 35 Years On

    By S DeKruijff

    The Mount Isa Mines Copper Mine in Mount Isa started producing copper in 1966. The Copper Mine gradually increased production rates to nearly six million tonnes per year. Over the last three years the

    Jan 1, 2000

  • AUSIMM
    Does process control sampling always have to be a compromise?

    By M Singh, R C. Steinhaus, J J. Rust

    Metallurgical process control systems in mineral plants often employ state-of-the-art monitoring analysers in an attempt to optimise plant operations and enhance mineral recoveries. These systems are

    May 9, 2017

  • AUSIMM
    The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs Viewpoint

    By J-P Franzidis, M Esvelt, E V. Manla

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart

    Jan 1, 2003

  • AUSIMM
    An Overview of Current Planning and Production Systems at McArthur River Mine

    By M Gwynne

    McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping

    Jan 1, 1998

  • AUSIMM
    Underground Construction Challenges Associated with the Albany Conglomerate in Auckland

    By L J. Strachan, O J. Hawes, S W. Crossen, R C. Roberts

    The Albany Conglomerate is a widespread geological unit found in northern areas of Auckland, New Zealand. It has previously been described as part of the early Miocene Waitemata Group which underlies

    Sep 17, 2014

  • AUSIMM
    The Role of Benchmarking and Independent Reviews

    By D Hunter, N Cusworth, J Miller

    "Recent project failures have called into question the use and relevance of benchmarking and independent reviews, forcing a rethink of traditional processes and procedures.With cost estimates and sche

    Mar 8, 2016

  • AUSIMM
    Building a Geometallurgical Model in Iron Ores using a Mineralogical Approach with Liberation Data

    By F Minz, P Lamberg, A Mwanga, C Lund, C Wanhainen, M Amiri Parian, J Rosenkranz

    A geometallurgical model is currently built in two different ways. The first and the most common way relies on geometallurgical testing, where a large number of samples are analysed for metallurgical

    Sep 29, 2013

  • AUSIMM
    Ranges of Validity of Some Distribution Functions for Blast-fragmented Rock

    By J A. Sanchidrián

    The general ranges of validity of some distribution functions are assessed from their behaviour with 119 sets of fragmentation data from bench blasting obtained by sieving. The emphasis is on determin

    Aug 24, 2015

  • AUSIMM
    Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case Study

    By P Crittenden

    Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant

    Jan 1, 2009

  • AUSIMM
    Geology and Definition of the Wattle Dam Coarse Gold Deposit

    The Wattle Dam gold mine, located near Kambalda in the Goldfi elds region of Western Australia has recently progressed to an underground operation and is now believed to be Australia's highest gr

    Aug 1, 2010

  • AUSIMM
    Development and Implementation of Spin-to-stall Resin at Anglo American’s Australian Underground Coal Operations

    By P Craig, I Canbulat, J Naylor, J Emery, A Sykes

    Longwall mining is by far the most common method of underground coal extraction in Australia. Industry trends and expectations are placing increasing emphasis on the reliability and productivity of th

    Nov 5, 2014

  • AUSIMM
    Development and Implementation of the Garford Dynamic Bolt at the Kanowna Belle Mine

    By R Lachenicht, J Player, A Thompson, E Villaescusa

    Kanowna Belle Gold Mine is a deep, high-stress, sublevel open stoping mine located near Kalgoorlie. Seismic activity during the development cycle presented problems, including concerns regarding the e

    Jan 1, 2008

  • AUSIMM
    Drift and Fill - The High Value, High Recovery Mining System

    By M English, M Yumlu

    At times of high metal prices, mining projects that have previously been put into the ætoo hard basketÆ are now being more closely examined. Typically these projects include the potential recovery of

    Jan 1, 2008

  • AUSIMM
    Research on supporting technology for production level roadways of block caving in Pulang Copper Mine

    By X Feng, X Zhang, W Sun, Y Zhe, K Hou, B Zhao, H Liu

    Pulang Copper Mine, being China's largest newly built mine using block caving, boasts an annual production capacity of 12.5 million tons. Production level and roadway stability hold the key to the

    Nov 30, 2018

  • AUSIMM
    Risk-Based Ore Selection from Conditionally Simulated Block Models

    By J E. Everett, F Grobler

    This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo

    Aug 12, 2013

  • AUSIMM
    Open Cut Mining Adjacent to Ephemeral Creek and Spring Systems ù Pilbara, Western Australia

    The Pilbara region, located in the north-west of Western Australia, is significant as the second-largest source of iron ore on the planet. Iron ore mines owned and operated by Pilbara Iron are located

    Jan 1, 2006