Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Alignment and Differences between the Australian Water Accounting Standard and the Water Accounting Framework for the Minerals Industry

    By A Woodley, A N. Danoucaras

    In 2012 the Bureau of Meteorology, under the banner of the Water Accounting Standards Board, released the Australian Water Accounting Standard 1 (AWAS 1). This standard has been in development since 2

    Nov 26, 2013

  • AUSIMM
    Low-Grade Concentrator Regrind Circuit Upgrade at NewcrestÆs Cadia Valley Operations

    By B Clements, R Dunne, J Dioses, S Hart

    In April 2003 plant upgrades in the æLow GradeÆ Cadia Hill circuit were undertaken in order to improve concentrate quality and metal recoveries from the flotation circuit. The major changes involved:

    Jan 1, 2005

  • AUSIMM
    Size by Size Analysis of Operating Characteristics of Jameson Cell Cleaners at the Bajo De Alumbrera Copper/Gold Concentrator

    By A Murphy, D Lauder, J Miranda

    Minera Alumbrera Limited operates the Alumbrera concentrator, treating a nominal 80 000 tpd of porphyry gold/copper ore. It is located in Argentina, 1200 km north-west of Buenos Aires in Catamarca Pro

    Jan 1, 2000

  • AUSIMM
    The Influence of Solar Radiation on Evaporation for Three-Dimensional Flux Boundary Modelling of Soil Cover Systems on Waste Rock Dumps

    By G W. Wilson

    Net solar radiation is one of the key factors affecting evaporation from soil covers on waste rock dumps. While net solar radiation is normally taken as a uniform parameter over a site for modelling p

    Jan 1, 2003

  • AUSIMM
    Fluorine Removal From Ok Tedi Copper/Gold Concentrates

    By J W. Glatthaar, M Mavotoi

    The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho

    Jan 1, 2003

  • AUSIMM
    Plan Implementation ù How Communication Impacts on Securing Organisational Success in the 21st Century

    By W Roy

    When it comes to plan implementation and securing success in organisations in the 21st century, if there was such a thing as the secret to success it would be effective communication. Commoditisation

    Jan 1, 2006

  • AUSIMM
    A Combined Sorption-Flotation Technology for Gold Recovery From Cyanide Solutions and Pulps

    A viable flow sheet of the sorption-flotation technology for gold recovery from low-grade ores and concentrates using powdered activated carbon modified by organic compounds as the sorbent-bearer has

    Jan 1, 2005

  • AUSIMM
    Mine Wastes as Cover Materials in a Water-shedding Soil Cover in North-West Queensland

    By T Baumgartl, C Gonzales, A Soliman, M Edraki

    A soil cover isolates potentially acid-forming (PAF) mine wastes from atmospheric interaction and thereby mitigates acid mine drainage. As a cover that comprises either a single layer or a composite b

    Jul 16, 2014

  • AUSIMM
    An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations

    By S Q. Liu, E Kozan

    This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is

    Nov 24, 2014

  • AUSIMM
    Decision Support for an Underground Gold Mining Operation - A Case Study using the Schedule Optimisation Tool

    By B Maybee, L Fava, D Millar

    In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises

    May 24, 2012

  • AUSIMM
    Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin Mine

    By M S. Kizil, T OÆConnor

    It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At

    Jul 1, 2013

  • AUSIMM
    Variographic case study for designing, monitoring and optimising industrial measurement systems – the missing link in Lean and Six Sigma

    By O Bøckman, E Thisted, K H. Esbensen, U Thisted

    Process industry measurement systems, once installed, are often interpreted as static black boxes delivering correct values as long as not proven otherwise. After first implementation and set-up with

    May 9, 2017

  • AUSIMM
    Laboratory Testing and Stability Analysis of Paste Backfill at the Golden Giant Mine (d53b2c09-d9ab-48b2-94c6-0c6f856d783f)

    By Bawden WF, Paynter JT

    This investigation involves laboratory testing and stability analysis of paste fill at the Golden Giant Mine. Site-cast samples are tested in unconfined, confined, and consolidated-undrained triaxia

    Jan 1, 1998

  • AUSIMM
    Paste Backfill for Enterprise Mine

    By D Morrison, P Goodman

    The cycle time between adjacent stopes is critical to achieving the required production rate from 3500 Orebody; one of the Enterprise Mine orebodies. Current Mt Isa cemented fills require a 90-day cur

    Jan 1, 1998

  • AUSIMM
    "The Business Case for Early-stage Implementation of Geometallurgy– an Example from the Productora Cu-Mo-Au Deposit, Chile"

    By J L. Macdonald, G S. King

    "The development of a predictive geometallurgical model is a multidisciplinary and iterative task that involves both discovery and integration aspects. In this paper, the authors discuss the concepts

    Jun 15, 2016

  • AUSIMM
    Use of Mineralogy to Interpret Laboratory-Scale Acid Rock Drainage Prediction Tests - A Gold Case Study

    By S T. L Harrison, J-P Franzidis, M Becker, N Dyantyi, J L. Broadhurst

    Gold mining is a major contributor to the South African economy, but is associated with several environmental issues such as acid rock drainage (ARD). ARD is due to the oxidation of sulfides in gold t

    Sep 26, 2013

  • AUSIMM
    Optimisation of Wash Water on an Iron Ore Spiral to Improve Grade

    By C M. Ramotsabi, F Bornman, W Erasmus

    Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine

    Jul 13, 2015

  • AUSIMM
    Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution

    By M Burdick, A Harding, M Krulc, M Chappell

    Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How

    Sep 17, 2014

  • AUSIMM
    A Change in Graphite Depressant to Improve the Recovery of Zinc at MMG Century Mine

    By R Wynn, N Stoitis, R A. Lauten, H Liang

    At the Century mine in North West Queensland, MMG produces lead and zinc concentrates. The current production rate is close to 500 000 t of zinc per annum. Graphite is the main gangue in the orebody a

    Sep 1, 2014

  • AUSIMM
    Macroinvertebrate Tolerance across a Range of Conductivities in the Isaac River Catchment (Central Queensland)

    By L Stitz, S Kinnear, L D. Fabbro

    Sensitive and tolerant species of macroinvertebrates were present across a wide range of conductivity concentrations in the Isaac River catchment in Central Queensland, indicating the need for further

    Nov 26, 2013