Productivity Enhancement Driver Assistance for Mining Machinery Based on Unique Two-Dimensional Radar Sensor Fusion ConceptBy C Augustin, M Hahn, K Nienhaus
Operators of mining machinery like haul trucks or excavators have very limited information about the exact distance to other equipment as well as to the natural boundaries like berms, walls and struct
Sep 26, 2011
-
Life Cycle Assessment and Tailings Management Trade-Off Studies - An Approach to ImplementationTailings management trade-off studies are done for all mining projects. There is wide variability in these studies as their approach, details and outcomes are determined by the experience and focus of
Jan 1, 2009
-
Preparation of Mine Fill from Process Plant TailingsThis paper reports the advances made during the development of underground mine fill technology from circa 1960 to the present and, in particular, indicates where increased input from process plant me
Jan 1, 2006
-
Non-Parametric Bayesian Learning for Resource Estimation in the Autonomous MineBy F Ramos
Conventional techniques for resource estimation generally involve the laborious analysis of variograms and the specification of parameters for covariance functions. In large deposits, construction of
Sep 26, 2011
-
Observations From the Magazine Dump Clay Capping TrialBy D Ray, D Brett
A clay-capping trial was established in 1996 on Magazine Dump at the Mt Lyell Copper Mine. The trial was initially constructed under the Mount Lyell Remediation Research and Demonstration Program, a c
Jan 1, 2003
-
Engineering Tools for Design, Analysis and Information Management Applied to Underground Drilling and BlastingBy D La Rosa, G Power, K Riihioja
In underground mining, the often unpredictable variability in ground conditions may lead to the application of suboptimal drilling and blasting patterns, resulting in poor performance. Experience and
Jan 1, 2001
-
Real-Time Risk Analysis and Hazard ManagementSafety remains a critical priority for the Australian mineral resource industry and will receive increased focus in the future. This is particularly evident in underground coal mines where reserves ar
Jan 1, 2005
-
Boundary Classification for Automated Geological ModellingBy P Hatherly, A Melkumyan, D Wyman
Chemical species distributions in rock sequences can be modelled using Gaussian processes (GPs) to predict the weight percentage between known data points. This method can be improved by dividing the
Sep 26, 2011
-
Underground Auxiliary Ventilation Monitoring and Diagnostic SystemBy S Viviers, G Ratner
Ventilation is part of all underground mine operations and is undertaken in order to introduce fresh, cool air to the workings and to remove stale, affected air. It is problematic to obtain efficient
Jul 1, 2013
-
2001 is Here Now - Teleoperation and Automation of UG VehicleTeleoperation is one method by which an operator can remotely control and monitor a vehicle. The operator monitors the status and progress of the remote vehicle by watching the video transmitted from
Jan 1, 1998
-
Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)By Medhurst TP, Trueman R, Hutchinson IN
A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed
Jan 1, 1992
-
Benefits of Advanced Technology in Underground MiningBy M Edhammer
In 2007, Atlas Copco introduced an integrated tunnel scanner/profiler. The tunnel scanner, which is integrated into the control system, is mounted on the drill rigs, and replaces the previous variants
Mar 21, 2011
-
Optimisation of Hydraulic Filling for Underground Disposal of Tailings in PeruBy D M R Stone
Failings di,posal presents many challenges at metal mines in Peru where the extreme relief yields very little useable land area. These challenges are amplified by other hazards such as the high seis
Jan 1, 1998
-
Accurate Underground Wireless Ranging and TrackingBy M Hedley
Tracking plant and personnel in underground environments provides multiple potential benefits for a mine including increasing safety, better monitoring of production, traffic control, and in the futur
Mar 21, 2011
-
The Merlin Zone – Rhenium Quality AssuranceBy D A. Sketchley
The Merlin Zone, a 2008 high-grade Mo-Re discovery, is a part of the Mount Dore Deposit in the Eastern Succession of the Mount Isa Inlier in Queensland, Australia. Hosted by carbonaceous metapelites a
Aug 22, 2011
-
A Double Drum Separator for Triboelectric Separation of Very Fine MaterialsBy K Schonert, K Eichas
Electrostatic separation of non-conductive materials can be accomplished by triboelectric charging. The efficiency of convential separators becomes worse in the size range below about 100 ¦m. These
Jan 1, 1993
-
Flotation Mechanism Design for Improved Metallurgical and Energy PerformanceBy R Coleman
The flotation mechanism plays a key role in the flotation process. It is used to provide the contact between solid particles and bubbles and also the energy for these particles and bubbles to attach.
Aug 8, 2011
-
A Review of the Structure and Stratigraphy of the Central Pine Creek GeosynclineBy Ormsby W. R, Farrar L
The stratigraphy of the central Pine Creek Geosyncline has been simplified into a three-fold subdivision comprising the Batchelor, Frances Creek and Finniss River Groups. The Batchelor Group consist
Jan 1, 1994
-
A Toolbox of Ideas for the Geoscientist Working on Block Cave MinesBy N Burgio
Block cave mines are often thought of as rock factories where high volumes of production are mined from a fixed area suggesting little requirement for geological input and control. Yet caving operatio
Aug 22, 2011
-
Development of the Hawsons Low-Grade MagnetiteBy R L. Koenig
The rediscovery and recognition of the magnetite potential of the iron mineralisation at the Hawsons Project area 60 km south of Broken Hill has the potential for the development of a new series of ma
Jul 11, 2011