Search Documents

  • SME
    Steel-Fiber Reinforced Self-Compacting Concrete on the San Vicente Aqueduct Tunnel

    By C. D. Hebert, M. R. King

    The 56,000' (17 km) long San Vicente Aqueduct Pipeline tunnel is being constructed using precast concrete rings to act as preliminary ground support through two sections of the bored tunnel with

    Jan 1, 2007

  • DFI
    EFFC-DFI Geotechnical Carbon Calculator Project

    By Vincent Joannes, Marine Lasne, Luca Brenelli, Colin Serridge, Inge van Baardwijk, Martin Stanley, Anthony Fisher, Mary Ellen Bruce, Tony Suckling, Pedro Avellanosa

    "Abstract The European Federation of Foundation Contractors (EFFC) and Deep Foundations Institute (DFI) developed a sector-specific carbon accounting methodology and associated “carbon calculator” for

    Jan 1, 2014

  • NIOSH
    IC 8458 Proceedings Of The Symposium On Respirable Coal Mine Dust, Washington, D.C., November 3-4, 1969

    MR. RIGG: Gentlemen, I would like to welcome you all to the symposium this morning. My name is Jack Rigg, and I m a special assistant to Hollis Dole, Assistant Secretary of the Interior for Minera

    Jan 1, 1970

  • SME
    Soil Deformation Analysis During TBM Excavation: Comparing Three Different TBM Technologies Used During the Construction of the Toulouse Metro Line B

    By Richard Kastner, Emilie Vanoudheusden, Fabrice Emeriault, Jacques Robert

    INTRODUCTION The subway line B of Toulouse (France) has been realized with three different tunnel boring machines (TBM) techniques: Contracts 2 and 5 are excavated with earth-pressure balanced TBM

    Jan 1, 2007

  • SAIMM
    Some Considerations On Future Developments In Ferro-Alloy Furnaces

    By I. J. Barker

    Keywords: Submerged-arc furnace, plasma furnace, d.c. furnace, scale up, Søderberg electrodes, smart grid, demand side management, load shedding This paper argues that the scale up of furnaces and

    Jan 1, 2011

  • NIOSH
    IC 8432 Applying Marx And Langenheim Calculations To The Prediction Of Oil Recovery By Steamflooding In Venango Sands

    By Avis W. Effinger

    In conjunction with pilot steamflood tests in the Venango sands of Warren and Venango Counties, Pa., the Marx and Langenheim (4)3 calculations were adapted and programed for digital computer solution

    Jan 1, 1969

  • NIOSH
    IC 7776 National Annual Diesel-Fuel Survey, 1956 ? Introduction

    By O. C. Blade

    Sales of diesel fuel in the United States during the post year and a half have increased greatly. In 1955 over 174 million barrels were sold of which 80 million (or 46 percent), were used by the railr

    Jan 1, 1957

  • CIM
    Experiences from an IREDES prototype project — Production drilling with Atlas Copco’s Simba L6C drill rig at LKAB Kiruna mine

    By U. Olsson, M. Ramström

    "The IREDES1 Special Interest Group (SIG) for drill rigs has been active since its launch during MineExpo 2000 in Las Vegas, Nevada, United States. SIG for drill rigs is responsible for the developmen

    Jan 1, 2005

  • NIOSH
    OFR-98-83 Evaluation Of Charged Walter Sprays For Dust Control

    By J. McCoy

    Charged sprays and fog have been evaluated for reducing respirable dust concen¬trations. Charged spray technology was reviewed for effectiveness, equipment and theoretical considerations. A mathematic

    Jan 1, 1983

  • NIOSH
    RI 3134 Active List of Permissible Explosives and Blasting Devices Approved Prior to June 30, 1931

    "An active list of permissible explosives was published in July, 1930 as part of the United States Bureau of Mines Report of Investigations 3025, under the title of “Active List of Permissible Explosi

    Jul 1, 1931

  • AUSIMM
    An Analysis of the Performance of Multi-Stage Grinding and Cyclone Classification Circuits

    By Lynch A. J

    A method has been developed for the prediction of the performance of multi-stage grinding-cyclone classification circuits of any degree of complexity on any ore for a wide range of operating condition

    Jan 1, 1965

  • AUSIMM
    A Geo-Mechanical Assessment of Thick Seam Mining Methods with Regard to Their Application to Australian Black Coals

    By C D. Rawlings

    An assessment is made of the potential for thick seam underground mining of black coal in Australia. A brief summary is given of the geo-mechanical environment and previous mining history existing in

    Jan 1, 1980

  • NIOSH
    OFR-31-86 Conveyor Belt Dust Control

    By Vinit Mody

    The belt conveyor is one of the major pieces of equipment for transferring bulk material in mining operations. However, considerable amount of respirable dust may be generated whenever the bulk materi

    Jan 1, 1984

  • AUSIMM
    Financial Assurance for Mine Closure - A New Zealand Perspective

    A variety of environmental financial assurance instruments are in use across the globe. This paper reviews some of the more common forms currently used in New Zealand, Canada, USA and Australia. In or

    Jan 1, 2006

  • NIOSH
    Forecasting Roof Falls with Monitoring Technologies – A Look at the Moonee Colliery Experience

    By John L. Edwards, Anthony T. Iannacchione

    There has been a persistent need to forecast roof falls so that miner’s exposure to hazardous underground environments can be minimized. Several monitoring techniques have been developed and are used

  • IIMP
    Rapid leaching of chalcopyrite concentrates using the Galvanox TMProcess

    By Berny Rivera

    The paper point out the Galvanox process developed at the University of British to leach concentrates containing copper sulfide mixtures, mainly chalcopyrite. This patented process is based primarily

    Sep 9, 2007

  • NIOSH
    OFR-6-80 Study Of Underground Coal Mine Waste Disposal Requirements In The United States

    By Walter W. Kaufman

    This report summarizes a study conducted to establish the nature and impact of regulations governing disposal of refuse from underground coal mines. The regulations affecting refuse disposal in eight

    Jan 1, 1978

  • AUSIMM
    The Differentiation of Macerals by Thin-Film Colouring

    When a thin film of volatile matter is deposited under vacuum on a polished coal surface, and the coated surface is examined microscopically in plane-polarized reflected light, colour changes are obse

    Jan 1, 1970

  • SME
    Columbus Circle Station Complex - History and Rehabilitation

    By Aram Grigoryan

    This paper addresses historical aspects and construction sequencing of the subway complex under Columbus Circle in Manhattan; the structural elements of the rehabilitation and new construction; and th

    Jan 1, 2008

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006