Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Experimental Study of Ore Characterisation Methods for AG/SAG MillsExperimental Study of Ore Characterisation Methods for AG/SAG Mills Mining companies have long recognised the importance of ore breakage characterisation in design and optimisation of their crushing
Sep 13, 2010
-
Real Time Validation of Driven Cast In-Situ PilesBy Derek Egan
"Abstract Construction clients want their foundation solutions to be right first time, every time; but it is often the geotechnical contractor who carries the most risk in achieving this. Robust valid
Jan 1, 2014
-
OFR-1(C)-87 Assessment Of Whole Body Vibration Levels Of Coal Miners - Volume III: Low Frequency Vibration Exposure And Seat PerformanceBy Paul J. Remington
The field data gathered as part of the measurements described in Volumes I and II were re-analyzed in the low frequency regime (.1 Hz to 1 Hz) where motion sickness normally occurs. These data were co
Jan 1, 1984
-
Treatment of Sulfide Tailings from Base Metal and Gold Operations - A Source of Saleable By-Products and Sustainable Waste ManagementBy D A. McCallum
With depth, many gold ores become sulfidic with minerals such as pyrite, pyrrhotite and arsenopyrite becoming prevalent. In addition, many underground gold mines use tailings backfill to bind and stor
Jan 1, 2007
-
OFR-10-84 Concurrent Establishment Of Ground Cover And Hardwood Trees On Reclaimed Mineland And Unmined Reference Sites ? Summary And Conclusions ? Introduction - BackgroundBy W. R. Byrnes
This project was initiated on October 1, 1980 and will be completed on December 31, 1983. The project was Initially approved and funded by the Office of Surface Mining and subsequently was moved to th
Jan 1, 1983
-
RI 4892 Petroleum-Engineering Study of K. M. A. Reservoir, Southwestern Part K. M. A. Oil Field, Wichita and Archer Counties, Tex."SUMMARYThe K.M.A. reservoir was discovered to be oil bearing at a depth of 3,719 feet on March 11, 1931. Extensive development, however, was not begun immediately, because the discovery well had a lo
Jun 1, 1952
-
OFR-79-78 Fabrication And Evaluation Of Optimized Operator CompartmentsBy Hanns J. Billmayer
Optimized Operator Compartment layouts based on previous Bureau of Mines activities in standardization and optimization of controls were designed and installed in three operating vehicles. Two Nationa
Jan 1, 1976
-
Computation Of The Load/Settlement Behaviour Of HP-Bearing Piles - 1. IntroductionBy E. E. De Beer
This paper describes a method for the determination of the settlement of an individual H-bearing pile, based on the results of CPT-tests. As implied by the nature of the problem, no analysis perform
Jan 1, 1987
-
OFR-31-89 Results Of 1988 Bureau Of Mines Investigations In The Valdez Creek Mining District, AlaskaBy Michael D. Balen
The U.S. Bureau of Mines (Bureau) is currently conducting a four-year study to assess the mineral resources and the mineral development potential of the 5.7 million acre Valdez Creek Mining District
Jan 1, 2011
-
IC 9202 Characterization Of The 1986 Stone Mining WorkforceBy Shail J. Butani
In 1986 the Bureau of Mines conducted a probability sample survey, Mining Industry Population Survey, to measure such employee characteristics as occupation; principal equipment operated; work locatio
Jan 1, 1988
-
Production, consumption and cost of energy for surface mining of bituminous coalBy V. Kecojevic
The objective of this research was to establish the relationship between production, consumption and energy cost in the surface mining of bituminous coal. Specific energy sources such as diesel, gasol
Jan 1, 2014
-
Recovery of Metal Values from Complex Sulphide Concentrates of Copper, Lead and Zinc through Aqueous ChlorinationBy Paramguru R. K, Jena P. K
Increasing demand for copper, lead and zinc with continuous depletion of good grade ore reserves, warrants the need for utilization of lean and complex ores of these metals. There is worldwide effort
Jan 1, 1981
-
OFR-54-(1)77 Exploration Of Illumination Concepts For Underground Coal MinesBy Lon A. Williams
This report, authorized under Contract Number H0220065, Amendment Number Six, documents the results of an investigation of lighting system modifications and designs for working place illumination in h
Jan 1, 1976
-
A Review Of Undergraduate Teaching And Postgraduate Research In Pyrometallurgy At The University Of StellenboschKeywords: Stellenbosch, university, teaching, research The pyrometallurgical activities at Stellenbosch University are reviewed in this paper. The history of the activities, both in teaching and r
Jan 1, 2006
-
OFR-42(3)-74 Protection And Troubleshooting Of Coalmine Electrical Cables - I. Introduction And Background - A. IntroductionElectrical trailing cable used to power coal mining machinery is frequently damaged in usage because of tensile strain or crushing effect of mining machines running over the cable. One of the repair p
Jan 1, 1973
-
Programs and Opportunities at ATP Focusing on Modeling and Simulation of Engineering ProcessesBy Dilip Banerjee
"This paper discusses the Advanced Technology Program (ATP)'s support over the last decade to the development and use of process modeling as a tool to address some of the challenges faced by the U.S.
Jan 1, 2004
-
Assessment of equipment operator?s noise exposure in western underground gold and silver minesBy Ellsworth R. Spencer
An assessment of U.S. western hardrock miners? noise exposures was conducted as part of a multi-year National Institute for Occupational Safety and Health (NIOSH) survey of noise exposures in each sec
Jan 3, 2010
-
IC 8070 Permissible Mine Equipment Approved By The Bureau Of Mines During 1959-60 - With Appended Lists Of Manufacturers Of Flame-Resistant Trailing Cables And Fire-Resistant Conveyor Belts And Holders Of Permits ? IntroductionBy R. A. Kearns
Biennially the Bureau of Mines issues a list of equipment that has been accepted as approved or permissible during the two calendar years immediately preceding the date of publication of the listing.
Jan 1, 1961
-
OFR-68-83 Preliminary Predictive Model Of Subsidence Process Over Room And Pillar Workings - Phase I: Definition Of FactorsBy S. K. Mathur
This report identifies all the possible activities, variables and factors that contribute to the surface subsidence process over room and pillar workings. These factors are responsible for mine instab
Jan 1, 1982
-
Problem of Tunnel Construction in Himalayan Region: An Actual EncounterBy M. D. Khattar
Problems discussed concern encountering of high temperatures [up to 66°C] and heavy flow of water [150 L.P.S] during the construction of the 10.15 MØH.R.T. for the 2500 MW Nathpa Jhakri Hydro Power Pr
Jan 1, 1999