Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Development Of A Jet Reactor For The Leaching Of Valuable MetalsBy B. M. Loftus
An investigation into the use of impinging stream (jet) reactors for the leaching of a free milling ore produced an increase in gold recovery by 10% while decreasing leaching time by up to 90%.Tests o
Jan 1, 1997
-
Combining For Strength: An Integrated Approach To Water And Mine WasteBy Nural Kuyucak
Several thousand years ago, metallurgists discovered that by combining two relatively soft metals, copper and tin, they could make a new material, bronze, that was stronger than either metal separatel
Jan 1, 2009
-
RI 7055 Lightweight Aggregates - Expansion Properties Of Selected Michigan ShalesBy James H. Aase
Shales from 10 locations in Michigan were sampled, tested, and evaluated to determine their suitability as raw materials for producing lightweight aggregate by rotary-kiln methods. Sampling procedures
Jan 1, 1967
-
MLA 110-82 - Mineral Investigation Of The Sheep Hole/Cadiz Wilderness Study Area (BLM), San Rernardino County, California ? Summary StatementtBy Phillip R. Moyle
Several deposits in the Sheep Hole/Cadiz Wilderness Study Area (WSA) have small identified or potential for undiscovered gold and silver resources. One prospect area is a potential target for molybden
Jan 1, 1982
-
Developments in Fine Gravity Concentration Using the Bartles-Mozley TableBy R. O. Burt, D. J. Ottley
"SYNOPSISRecent developments in the use of the Bartles-Mozley table and the Bartles CTS screen are described for the gravity preconcentration of fine heavy mineral and metal particles present in low g
Jan 1, 1973
-
A Computer Simulation Model For Surface Mine Reclamation Planning - Volume IV: User's Manual For OPMHS/2By R. V. Ramani
This volume is the fourth of a four-volume final report on research carried out under a contract from the U.S. Bureau of Mines on the development of a computer simulation model for surface mine reclam
Jan 1, 1985
-
H3PO4 Production Process Utilizing Phosphatic Clay as Feed Material Mining, Metallurgy and Exploration (96f76f16-6e96-43f6-a430-5734ccdc3912)By Jack S. Watson, Rasika Nimkar, Robert M. Counce, Matthew Gordy, Patrick Zhang
Waste phosphatic clay presents a difficult disposal problem and a significant loss of P2O5. Recent developments make this study on the use of phosphatic clay as a feed material for H3PO4 production wo
-
Moly-Cop Tools Applications for the Assessment of Grinding Media Performance at Full Industrial ScaleBy J. E. Sepulveda, R. Morrow
"The Linear Wear Theory provides a reliable framework for the assessment of grinding media performance at full scale. This theory can be applied for analyzing grinding media consumption rates in any g
Jan 1, 2014
-
RI 5989 Effects Of Selected Operating Variables On Continuous-Cell Flotation Of Coal: A Laboratory Study ? Introduction And SummaryBy J. B. Gayle
Commercial flotation plants operate on a continuous basis that is not simulated closely by the batch testing methods widely used in Bureau of Mines laboratory studies of flotation, Batch methods indic
Jan 1, 1962
-
Metallurgy of Copper - Reverberatory Tonnages Reach 1500 per Day Waste-Heat Boiler Installations ImprovedBy P. D. I. Honeyman
DURING 1938 many copper companies again felt the economic pinch and smelter operations were often on a reduced basis which some- times resulted in intermittent operations and complete shutdowns. Durin
Jan 1, 1939
-
RI 9066 - Pillar Load Transfer Associated With Multiple-Seam MiningBy R. J. Matetic
The Bureau of Mines, as part of a program to improve mine planning and development, is currently investigating the effects of pillar load transfer, which can impact mining operations wi.thin a multipl
Jan 1, 1987
-
Feasibility of recovering metals from associated slagsBy M. Wang, Z. Sui, T. Lou
After smelting, the associated mineral ore accompanying Valuable Metal Compounds (VMC),such as titania and borate in BF., most of the VMC were separated from the metal into the molten slag that is an
Jan 1, 2004
-
Expanding The Limitations Of The MFire Simulation ModelIn 2002 the authors updated the MFire model developed by the US Bureau of Mines. MineFire, developed by Mine Ventilation Services, Inc. (MVS), uses the MFire model to perform mine fire simulations on
Jan 1, 2011
-
OFR-32-81 Electromagnetic Fields In Mine EnvironmentsBy James R. Wait
The present final report constitutes the total productivity of a series of contracts from the U.S. Bureau of Mines and the Institute for Telecommunication Sciences over the period 1971-1979. The empha
Jan 1, 1980
-
Recycling of Steelmaking Slag Aiming at the Production of Thermo-Acoustic InsulationBy Joner Oliveira Alves
The aim of this work was to study the use of steelmaking slag as raw material to the production of rock wool and glass wool. Firstly, the chemical composition of the slag was analyzed. These results w
Jan 1, 2009
-
Interface Testing For The Design Of Micropiles In Expansive SoilsBy Robert W. Schaut
The use of micropiles is increasing for new construction and to retrofit distressed foundations in expansive soils. Typical micropiles in expansive soils have a lower section where the micropile grou
Jan 1, 2011
-
OFR-100(2)-76 Development Of Pre-Mining And Reclamation Plan Rationale For Surface Coal Mines - Volume II Of III - Methods Of Data AcquisitionVOLUME II Volume II, in conjunction with Volume I, is a general guide to the selection of cost-effective methods of site data acquisition in all geologic environmental, and socio-political circums
Jan 1, 1976
-
RI 5839 Bacteria In Mining And Metallurgy: Leaching Selected Ores And Minerals; Experiments With Thiobacillus Thiooxidans ? SummaryBy Joseph A. Sutton
This study was undertaken by the Bureau of Mines to determine whether the sulfur-oxidizing bacterium Thiobacillus thiooxidans could use sulfur compounds to produce sulfuric acid in sufficient quantiti
Jan 1, 1961
-
Drilled Pile Design and Installation Challenges in an Urban EnvironmentBy Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran
This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment
Jan 1, 2018
-
Site Management Towards Pile Execution At Qurashiya BridgeBy Emad W. Shublaq
Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur
Jan 1, 1992