Search Documents

  • SME
    Getting The Engineer?s Estimate Right

    By Tom Martin

    Mega projects present unique challenges with regard to estimating costs. With such projects, which may span decades, these challenges often begin as soon as a project is conceived. The importance of h

  • AUSIMM
    An Automatic Dust Sampler

    A device is described which is suitable for the automatic sampling of dust in dust laden flue gases. This device, called a Venturi Sampler, consists of two pipes each fitted with a suitably designed v

    Jan 1, 1959

  • NIOSH
    RI 8743 Coal Cutting Mechanics and Noise Generation

    By Roy C. Bartholomae

    This Bureau of Mines report presents the results of a laboratory investigation of coal cutting mechanics and noise. These experiments were performed using linear cutting apparatus that operates over a

    Jan 1, 1983

  • NIOSH
    RI 8929 - Ground Control Study of a Mechanized Longwall Coal Operation in West Virginia

    By Paul H. Lu

    This Bureau of Mines report summarizes the analysis and eveluation of the field measurement results of a comprehensive ground control study conducted in a mechanized longwall coal mine in West Virgini

    Jan 1, 1985

  • SME-ICGCM
    A Case Study of Multi–Seam Coal Mine Entry Stability Analysis with Strength Reduction Method

    By Ihsan Berk Tulu, Michael Sloan, Ted Klemetti, Michael M. Murphy, Gabriel S. Esterhuizen, Jame Sumner

    "In this paper, the advantage of using numerical models with the strength reduction method (SRM) to evaluate entry stability in complex multiple-seam conditions is demonstrated. A coal mine under vari

    Jan 1, 2015

  • SME
    Skill, Talent and Future Leaders in a Candidate-Deficient Market

    By Leigh Freeman

    This article provides an overview for a series of leadership development workshops offered through the SME Young Leaders Program. The first of these workshops, “Accelerated Development Plan,” will be

    Jan 1, 2006

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • SAIMM
    Improvement in the Overall Efficiency of Mining Equipment: A Case Study

    "In mechanized mining, poor equipment efficiency (availability, utilization, productivity, and quality) can endanger the success of the operation. This case study will show how an initiative to improv

    Jan 1, 2016

  • IIMP
    Adopción tecnológica integral en la gestión de Atacocha

    By Francisco Gallo

    La transformación de una empresa no solo depende de la capacidad de compromiso y cambio de la alta gerencia, sino se relaciona con la adopción de una tecnología iexitosa que transmita a la organizació

    Sep 13, 2001

  • CIM
    Why SA Matters: Cost of Lacking Operator SA

    Scope / Agenda ? What is Situation Awareness (SA)? ? Background on SA theory ? SA is critical in a wide variety of domains ? SA and human performance ? Consequences of poor SA ? Significant chal

    Aug 1, 2013

  • SME
    Evaluation Of Sulfidic Mine Tailings Solidified/Stabilized With Cement Kiln Dust And Fly Ash To Control Acid Mine Drainage

    By M. Nehdi

    Deficient surface disposal systems of sulfidic mine waste often cause severe contamination of surface streams and groundwater reservoirs due to the oxidation of sulfide phases. The subsequent generati

    Jan 1, 2008

  • SME
    Summersville Raw Water Intake

    By Douglas Banks

    Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake

    Jan 1, 2005

  • IOM3
    Empirical approach to prediction of damage in bench blasting

    By S. G. Beattie, N. Mojtabai

    A study was carried out which aimed to: determine the effects of blasting on excavation perimeters and nearby slopes; establish a low-cost blast monitoring and field observation programme to determine

    Apr 1, 1996

  • CIM
    A Geometallurgical Approach of the Copper-Nickel-Platinum Group Elements Maturi Deposit, Minnesota, USA, Using Quantitative Mineralogy

    By Charles Knilans, Tassos Grammatikopoulos, Nicole Hoffmann

    "Twin Metals Minnesota LLC, (TMM) has recently completed a prefeasibility study evaluating the development and operation of an underground copper (Cu), nickel (Ni), platinum (Pt), palladium (Pd), and

    Jan 1, 2015

  • SAIMM
    Slag/Refractory And Metal/Refractory Interactions During The Production Of Stainless Steels

    By N. Sutcliffe

    Refractories and slags play a vital role in the production of stainless steel. They are in intimate contact with the steel at temperature, and chemical reactions between the three can and do occur. Th

    Jan 1, 2004

  • AIME
    Minerals Beneficiation - Correlation of Product Size, Capacity and Power in Tumbling Mills

    By U. N. Bhrany, N. Arbiter

    Over the last one hundred years the problem of assessing the efficiency of energy consumption in producing rock breakage has been studied by many investigators from a variety of viewpoints. Their cont

    Jan 1, 1961

  • AUSIMM
    GIS Modelling of Mineral Prospectivity: New Technology and Old Data, Reefton Goldfield

    By J B. Taylor

    Geographic Information Systems (GIS) are being increasingly used by the mineral exploration industry in the search for new ore deposits. A mineral exploration GIS links geological and geophysical data

    Jan 1, 1994

  • NIOSH
    RI 7711 Cleaning Titanium Alloy Chips

    By O. Q. Leone

    A processing unit was developed for the complete cleaning of titanium alloy chips. The process uses solvent degreasing, magnetic separation, and anodic solution of nonmagnetic impurities in 10 weight-

    Jan 1, 1973

  • CIM
    Slag loss control with Bessemer mattes

    By P. Toscano

    The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-conv

    Jan 1, 2004

  • CIM
    Slag loss control with Bessemer mattes (7a7d6df1-1191-4a91-90b7-94a6293af197)

    By P. Toscano, T. A. Utigard

    "The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-con

    Jan 1, 2004