Search Documents

  • RMCMI
  • DFI
    Careful And Controlled Underpinning Methods In Restoration Of Damaged Houses In The Old Town Of Stockholm

    By T. Iwanowski

    Stress wave measurements and calculations are often used to make a safe determination of the bearing capacity and the integrity of driven piles. Some applications to the restoration of old buildings i

    Jan 1, 1991

  • SME
    Strata Control

    By Christopher J. Bise

    INTRODUCTION Perhaps no other area reflects the art as well as the science of mining-engineering design quite as obviously as strata control. This is due to the fact that the design of mining stru

    Jan 1, 1986

  • AUSIMM
    A Preliminary Geotechnical Assessment for Re-Opening the Blackwater Mine

    By J Taylor, L Richards, M McKenzie

    When a collapse in its services shaft caused rapid gas build up and its premature closure in. 1951, the Blackwater Mine at Wiauta was in full production with significant ore reserves yet to be mined.

    Jan 1, 1996

  • AUSIMM
    Andesites as Resources for Roading and Concrete Industries, North Island Of New Zealand

    Andesites are a major source of aggregate for much of the North Island of New Zealand. There are regional differences with respect to some important properties of the andesites. Some are reactive with

    Jan 1, 2005

  • AIME
    History of the Institute - I - 1871-1946

    By A. B. Parsons

    Jan 1, 1971

  • CIM
    Predictive Control and Real Time Optimization in the Minerals Industry

    By Quin Dennis

    Process Optimization ?What is it really? It is NOT ?a larger fan to increase draft through a process ?a larger pump on a wet circuit ?a wider conveyor belt for solid materials ?a larger feed el

    Nov 1, 2011

  • SME
    Underground Construction Is Crucial To Success Of Olympic Games Venues

    When the 2008 Olympic Games begin in Beijing, China is September it will not only mark the end of the journey for the Olympic torch and the thou-sands of participating athletes, but the games will als

    Jan 1, 2008

  • CIM
    Process Design and Change Management for Successful Deployment of Technology in Mining

    By Laura Mottola

    Process Design and Change Management for Successful Deployment of Technology in Mining Over the last 30 years Canada has been successful in developing but not deploying hardrockmining automation.

    May 1, 2010

  • CIM
    Améliorations apportées au minage de la zone 1 à la mine Doyon

    By François Girard

    La zone 1 de la mine Doyon (zone altérée), se situe à l?extrémité sud de la mine et est constituée d?une série de veines étroites à fort pendage et ayant des épontes de très faible résistance. Les épo

    Feb 1, 2008

  • NIOSH
    RI 9335 - Production of Lead Metal by Molten-Salt Electrolysis With Energy-Efficient Electrodes

    By J. E. Murphy

    The u.s. Bureau of Mines investigated electrode designs for electrowinning lead metal from a LiCl-KCl-PbCI2 electrolyte at 4500 C. The major objective of this investigation was to decrease the energy

    Jan 1, 1991

  • DFI
    1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers

    By J. Hartikainen

    19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an

    Jan 1, 1994

  • SME
    Discussion - Lime substitutes for the treatment of acid mine drainage

    By G. W. Heunisch

    G.A. Carmody and L.B. Anderson We wish to comment on the paper by G.W. Heunisch (MINING ENGINEERING, January 1987), which raised several important points regarding treatment of acidic waste waters.

    Jan 9, 1987

  • NIOSH
    IC 8742 Underground Mine Communications (In Four Parts) 1. Mine Telephone Systems

    This Bureau of Mines report is devoted to descriptions of systems that provide in-mine wired telephone service. Although they may incorporate other features, each system described functions to allow o

    Jan 1, 1977

  • CIM
    Ironworking in Upper Canada: Charles Hayes and the Marmora Works

    By Rita Michael

    "The Marmara Ironworks was not the earliest ironworks in Ontario, but it was distinguished from other early works in a number of ways. It was established on an ambitious scale as a self-sufficient and

    Jan 1, 1999

  • DFI
    Settlement & Vibration Monitoring For Transmission Line Foundation Installation: A Case History

    By R. Heath Forbes

    The route of a new, 4-mile long, electrical transmission line passed through residential neighborhoods and commercial areas of a small town in the South Carolina Coastal Plain. The new line consisted

    Jan 1, 2011

  • AUSIMM
    Energy Conservation in the Indian Mining Industry - An Overview

    The last one decade in India had witnessed phenomenal growth in the coal, lignite, iron ore, limestone and many other minerals. To meet the production of minerals, the energy requirement is also very

    Dec 6, 2010

  • NIOSH
    IC 8186 Research And Technologic Work On Alabama Coals: An Annotated Bibliography (5c530489-7a2f-4fa5-b7b1-0f3c2a38da5d)

    By R. Q. Shotts

    Factors of geological structure and occurrence of coalbeds, plus the resulting mining conditions, have required more care in preparing coals in Alabama than in most other districts almost since mining

    Jan 1, 1963

  • NIOSH
    Bulletin 154 Mining and Milling of Lead and Zinc Ores

    By Clarence A. Wright

    The Missouri-Kansas-Oklahoma lead and zinc district, better known as the Joplin district, includes the mines in southwest Missouri and in those parts of Kansas and Oklahoma that are directly adjacent.

    Jan 1, 1918

  • AUSIMM
    An Investigation of Factors Affecting the Long-term Reliability of Extraction Level Pillars in Deep Block and Panel Caves

    By P Duplancic and C R Lilley, R Hudson, D Beck

    For deep block and panel caving mines, undercut or extraction level instability can have as much impact on overall recovery as underbreak or the premature ingress of waste. If the area of the mine aff

    May 9, 2016