Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Observed Spatial and Temporal Behaviour of Seismic Rock Mass Response to BlastingBy K. Woodward
"SynopsisSeismically active mines generally experience an increase in seismic hazard due to rock mass instability following blasting. Re-entry protocols commonly include measures to limit the spatial
Jan 1, 2015
-
Arsenic Mobility During Vegetation of Gold Mine TailingsBy D Craw, C Smith, C Rufaut
Oceana Gold (NZ) LtdÆs, Macraes Gold Operation currently has two tailings impoundments, the larger of which covers approximately 75 ha. When an impoundment is temporarily out of use, the surface dries
Jan 1, 2004
-
Mass Mining using Room and Pillar Methods at Estonia Oil Shale MineThe Estonia Mine, operated by Eesti Energia Kaevandused AS (EEK), the mining division of the Estonian Government's energy company, Eesti Energia AS, is a large room and pillar mine located in Eas
Dec 6, 2010
-
Antimony-gold deposits of North-Atlantic Acadian-Hercynian domainBy M. L. Leblanc, J. F. Burzynski, D. J. Mossman
A strong heterogeneity in the distribution of Sb+/-Au deposits exists within the North Atlantic Acadian-Hercynian domain. This is reflected in the regional disparity in Sb production among the various
Dec 1, 1991
-
Potential Of A Void Diffusion Model To Predict Longwall Subsidence In The Illinois Coal BasinIn this paper, the authors attempt to apply a simplified non-homogeneous void diffusion model (NHVDM) to predict surface subsidence for longwall mining in Illinois. A generalized error function subsid
Jan 1, 1990
-
Overview of Lake Shore Gold’s 2012 - 2013 Bell Creek Mill ExpansionBy D. B. Felsher
"Lakeshore Gold’s Bell Creek Mill is located in Timmins, Ontario. The mill has been in operation since 2009 and has undergone several small expansions since then. In 2012 - 2013 the first major mill
Jan 1, 2015
-
Development Of A Mineral Flotation Frother For Nchanga Mine On The Zambian CopperbeltBy H Zimba, S Sondashi, M Chitambo
By the time a reagent is finally accepted by a mine for use on its plant it could have gone through several screening and evaluation stages. These stages may include laboratory and plant evaluation te
Jan 1, 2007
-
Micropiles Prove Advantageous Over Drilled Shafts For Merchants Railroad Bridge RehabilitationBy Jeffrey R. Hill
To extend the life of the Merchants Railroad Bridge crossing the Mississippi River in St. Louis, MO, the owner implemented a rehabilitation and reconstruction project. The Merchants Bridge provides a
Jan 1, 2006
-
Metasediment-hosted epithermal Sb-(Au) mineralization in central Spain: role of hidden Hercynian granitoidsBy M. Gallego, R. Oyarzun, L. Ortega
Evidence of metallogenic activity in an area dominated by Upper Precambrian and Palaeozoic metasediments was partially explained in the 1980s when drilling and a geophysical survey detected hidden int
Aug 1, 1995
-
Sherrgold MacLellan Mill Design and OperationBy R. A. Ozerkevich, R. J. Voisey
"SherrGold's MacLellan V ne is located about five miles south east of Lynn Lake immediately to the east of the Keewatin River. (Figure # 1)The property is accessible by an all weather road, leading no
Jan 1, 1987
-
Engineering Principles for the Design of a Personnel Transportation SystemBy G. M. J. van Heerden, R. C. W. Webber-Youngman
"This article describes the re-engineering principles applied in the design of a personnel transportation system for the Bafokeng Rasimone Platinum Mine in the Rustenburg area of South Africa. It inco
Jan 1, 2016
-
Evolution of Semi-Autogenous Grinding Mill Control at Century ZincBy A Prinsloo, R Tewu
Automatic control of semi-autogenous grinding (SAG) mills has often been considered complex. Recent experiences at Century Zinc (worldÆs second largest open pit zinc mine) refute this. Together with o
Jan 1, 2009
-
The evolution and future of overburden dewatering at Highland Valley Copper (ccb710cb-32e0-4645-ac2a-8a63f54a56a6)By P. A. Witt
"Highland Valley Copper is a conventional truck-shovel mining and flotation concentrator operation located 75 km southwest of Kamloops, British Columbia (Fig. 1).The ore is situated within a porphyry
Jan 1, 2005
-
Adaptive control in mineral processingBy K. Najim, D. Hodouin
"The raw ores which are processed in mineral processing plants exhibit very strong variations of their physical and chemical properties. As a consequence, the performances of the comminution and separ
Jan 1, 1992
-
The Little Beach - Wallace Beach Mineral Sand Deposit, Catlins Area, New ZealandThis paper reviews the gold mining history and recent exploration activities on a number of beaches in the Catlins area of coastal South Ota
Jan 1, 1992
-
Effects of blasting on damage and grindability of impacted rockBy C. Pelley, S. Kelebek, G. Kunzel, S. Gregersen, M. Pollanen
A series of small-scale tests was conducted to evaluate the effect of micro-fracture development, imposed by blasting, on the material properties of the rock as well as its resistance to crushing and
Jan 1, 2006
-
Design Considerations For The Next Generation Of Longwall ShieldsBy Thomas M. Barczak
Advancements in support technology have occurred to a large extent because of the demands of the mine operators. Shield supports are no exception. The most notable changes in shield technology in the
-
Sinking And Commissioning Of The Eastern Twin Shaft System At Buffelsfontein Gold Mining Company Limited ? IntroductionBy G. L. Smit
The Buffelsfontein Gold Mining Company is situated in the Klerks-dorp district of the Province of the Transvaal in the Republic of South Africa, approximately 100 miles west of Johannesburg. Gold p
Jan 1, 1964
-
Algom Nordic. -Development to ProductionBy M. W. Airth
ON THE 6TH JULY in the year 1953 an announcement was made to the public that touched off one of the greatest staking rushes in the history of mining in Canada and resulted, in tl1e space of a few shor
Jan 1, 1958
-
Snow Tunneling at the South PoleBy John H. Wright
The United States Antarctic Program (USAP), through its principal support contractor Raytheon Polar Services Co. (RPSC), has recently completed a three-year project comprising nearly 936 m (3,071 ft)
Jan 1, 2002