  • SAIMM
    The viability of using the Witwatersrand gold mine tailings for brickmaking

    By S. Ndlovu, M. Malatse

    "The Witwatersrand Basin is the heart of South Africa’a gold mining industry. The cluster of gold mines located in the Witwatersrand Basin generates a significant amount of mine tailings, which have a

    Jan 1, 2015

  • SAIMM
    Investigating ?Optimal? Kriging Variance Estimation Using an Analytic and a Bootstrap Approach

    By C. Thiart

    Kriging is an interpolation technique for predicting unobserved responses at target locations from observed responses at specified locations. Kriging predictors are best linear unbiased predictors (BL

    Jan 1, 2014

  • SME
    Analysis of the Controlled Deformation in Rock and Soil (A.DE.CO.-RS)–Tunneling Approach Performance of an Alternate Tunneling Approach in the Construction of 100 Kilometers of Tunnel for the Bologna to Florence High Speed Rail Line

    By Silvano Morelli, Giovanna Cassani, Renzo Bindi, Antonio Nicola

    More than 70 km of main line and service tunnels have been excavated to date for crossing the Apennines between Bologna and Florence. A new design and construction approach, known as Analysis of t

    Jan 1, 2003

  • SAIMM
    Microstructure Changes Of Chromite Reduced With Co Gas

    By R. Boom, L. Holappa

    In the present paper, microstructure changes of solid-state reduction of industrial chromite pellets and lumpy ore were investigated with SEM/EPMA. To simulate the reactions in the packed bed zone of

    Jan 1, 2007

  • SAIMM
    Keynote Address: 6th International Symposium For Rock Fragmentation By Blasting

    By D. Diering

    Having agreed to perform this task, I naturally started to wonder what on earth I was going to talk about, and on reviewing the literature I was surprised at how little I knew and how much I?d forgott

    Jan 1, 2000

  • SME
    Boddington Gold Mine Moves Closer To Production

    Construction of the Boddington Mine 130 km (81 miles) southeast of Perth, is about 89 percent complete. When the $2.9-billion development is finished, it will be the largest gold mine in Australia, pr

    Jan 1, 2009

  • AUSIMM
    In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure

    By D J. Robinson, L L. Kuhar

    "Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to

    Nov 15, 2016

  • AUSIMM
    Integrating Bulk Ore Sorting into a Mining Operation to Maximise Profitability

    By P Holtham, K Duffy, W Valery, A Jankovic

    As high grade ore deposits are depleted, remaining deposits are generally lower grade and require the mining and processing of larger volumes of material per tonne of product. These low grade deposits

    Sep 7, 2015

  • AUSIMM
    Relationships Between New Zealand, Australian and New Caledonian Mineralised Terranes: A Regional Geological Framework

    By C J. Adams, H J. Campbell, A J. Tulloch, I J. Graham

    New Zealand can be regarded as a rifted part of mineral-prospective eastern Australia. Geologically credible comparisons between selected trans-Tasman and SW Pacific geological provinces and units, es

    Jan 1, 2005

  • AIME
    Mining Gradually Taking a Larger Proportion of Engineering Students

    By Thomas T. Read

    IN reviewing the field of mineral industry education last year reference was made to recent assertions, mostly emanating from sources not in a position to know the facts, that mining engineers as a cl

    Jan 1, 1936

  • CIM
    Global Approach to Managing Deep Mining Hazards

    A series of fault slip seismic events have occurred at Garson mine. The events have occurred during development advancement exposing faults, after the extraction of single stopes due to mining induced

    May 1, 2009

  • AUSIMM
    Gold Placer Exploration Models: Inferences from Placers in the Waitaki River Catchment, South Island, New Zealand

    By J Youngson

    Gold placers can be difficult to locate in areas where tectonic activity and paleogeography have changed significantly since placer formation. Existing placer exploration models are useful in areas th

    Jan 1, 1999

  • AUSIMM
    Small Scale Carbonization and Coke Studies in Coalfield Exploration and Mine Development

    Reliable and discriminating small, laboratory scale methods of study have been developed and used successfully in the critical evaluation and interpretation of the carbonization characteristics of a w

    Jan 1, 1969

  • SAIMM
    A Case Study Of Risk Evaluation At Cerrejon Mine

    By Luis-Fernando Contreras, Juliano Maran, Richard LeSueur

    A risk study was carried out at the Cerrejon coal mine in order to assess the impacts of pit slope failure in terms of safety of personnel and destruction of equipment with economic consequences. Res

    Jan 1, 2006

  • CIM
    Development of Process Computer Control For Sherritt’s Ruttan Concentrator

    By G. M. Hughes, R. W. Dunn

    "AbstractCurrently installed an analogue instrumentation devices at Sherritt 's Ruttan Concentrator control. and/ or measure mill tonnages, grind, pH, density , some reagent and slurry flows, and cell

    Jan 1, 1977

  • ISEE
    Portable Continuous Velocity of Detonation Systems

    By Jackson R. Pressley, M L. Hopkins, R E. Danell, N T. Moxon, Andrew Bowman

    Efficient and cost effective blasting is achieved by closely matching the explosive energy to the strength of the material in which it is being used. Although there are many empirical relationships wi

    Jan 1, 1991

  • CIM
    Forage ITH à Haute Pression à la Mine Goldex

    By Patrick Frenette

    Résumé La Mine Goldex entrera en production au 2ième trimestre de 2008. Pour permettre une production de l?ordre de 6960 tpj, le forage ITH à une pression de 400 psi (28 bar) à été sélectionné. Il s

    Feb 1, 2008

  • DFI
    Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected Piles

    By A. Eslami

    In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;

    Jan 1, 2008

  • AUSIMM
    Normal Fault Hosted Quartz-Scheelite Lodes and Associated Vein Swarm, Glenorchy, NW Otago

    Lower greenschist quartzo-feldspathic schists within the N-S trending Earnslaw Synform of the Upper Wakatipu area are pervaded by late-stage quartz filled extensional and extensional shear fractures,

    Jan 1, 2001

  • AUSIMM
    Metallurgical Fuel from Victorian Brown Coal

    A hard lump char containing only 4 to 5 per cent ash, 0·25-0·30 per cent sulphur and a trace of phosphorus has been produced from Latrobe Valley brown coal by slow drying and carbonization o