Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Drilled Shaft Design Optimization by Means of Static Load TestingBy Riad Diab
In 2018 the Caisse de Dépôt et Placement du Québec (CDPQ) awarded a $6.3 billion (U.S. dollars) design-build contract to the Joint Venture (JV) team NouvLR for the design and construction of one of th
May 1, 2022
-
Controlling Product Quality at High Production Rates as Applied to BHP Billiton Iron Ore Yandi Fines OperationBy T Howard, J E. Everett
BHP Billiton Iron Ore has replaced the conventional product quality control batch system at Yandi with the Continuous Stockpile Management System (CSMS) centred on a fully integrated æcontinuousÆ stoc
Jan 1, 2002
-
Strategic Research Support for the Mining Industry - The Role of the Australian Centre for Minesite Rehabilitation ResearchThe Australian Centre for Minesite Rehabilitation Research (ACMRR) was established through a mining industry initiative to meet the need of industry, governments and the community for sustainable syst
Jan 1, 1995
-
Optimization of shuttle car utilization atan underground coal mineBy P. R. Segopolo
"The purpose of the project is to convert current shuttle car utilization on an underground coal mine to best practice by focusing on change-out points and tramming routes, which have a major influenc
Jan 1, 2015
-
Employer Practice Regarding Engineering Graduates ? EJC Committee on Economic Status of the Engineer Submits Preliminary ReportBy AIME
SUPPLEMENTING surveys of the engineering profession regarding salaries and advancement, based upon data from individual engineers, a survey through a questionnaire to employers of engineers has recent
Jan 1, 1947
-
Development And Initial Implementation Of EPRI's Coal Quality Impact Model (CQIM) In The Southern Electric SystemBy C. N. Logan
The Southern Company is one of the nation's largest electric utilities and is the parent firm of five operating companies: Alabama Power, Georgia Power, Gulf Power, Mississippi Power and Savannah
Jan 1, 1990
-
The Petrography of Some New South Wales Permian Coals from the Tomago Coal MeasuresPermian coal seams from the Tomago Coal Measures in the Northern Coalfield, New South Wales, were analysed petrographically and reflectance measurements made for each. Vitrite contents were moderate t
Jan 1, 1968
-
Design of the Kubaka Grinding Circuit Using SPI and BondBy Graham Holmes, John Starkey
"The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball
Jan 1, 2001
-
Urban Tunneling Technology - European ExperiencesBy Erich J. Jacob
In the past 15 years the enforced improvement of the public traffic systems caused a boom in urban tunnel construction. In 1961 the City of Paris started to build the Express-Metro. Of the 47 km long
Jan 1, 1976
-
Optimization of Pellet Plant Process Parameters Using Six Sigma MethodologyBy Andrea McGlynn
Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%
May 1, 2011
-
Using Ultrasonic Anemometers to Evaluate Face Ventilation ConditionsBy J. Chilton
The fact that methane ignitions continue to occur at the mining face indicates that monitoring with machine-mounted methanometers does not always indicate the presence of high methane concentrations.
-
Utilizing Continuous Photo Analysis of Fragmentation as a Blast / Crush Improvement ToolBy James McGough, Lawrence Mirabelli, Ran Tamir
The paper will demonstrate how automated fragmentation photo analysis is being used at the Lafarge North America, Ravena NY quarry as part of an ongoing drill, blast and primary crushing continuous im
Jan 1, 2012
-
Geochemical Prospecting For Porphyry Systems In St. Francois Mountains, MissouriBy John B. Gustavson
This paper describes a case history of geochemical prospecting. An area of known mineralization was available for an orientation survey which led to the selection of elements and criteria for a reconn
Jan 1, 1977
-
Geology - Tectonic History of the Basin and Range Province in Utah and Nevada (Mining Engineering, Mar 1960, pg 251)By J. C. Osmond
One of the least known geologic regions in the U.S. is the area now called the Basin and Range Province. It is paradoxical that so little geologic information has been compiled for a province that has
Jan 1, 1961
-
Pre-Show Report: 1979 SME-AIME Fall Meeting and ExhibitSME-AIME Fall Meeting and Exhibit
Jan 9, 1979
-
The Tungsten-Bismuth-Molybdenum Deposit of Brunswick Tin Mines Limited: Its Mode of Occurrence, Mineralogy and Amenability to Mineral BeneficiationBy Wm Petruk
"The tungsten-bismuth-molybdenum deposit in southwestern New Brunswick occurs in greisenized and silicified tuffite * and feldspar porphyry in and adjacent to volcanic necks. The ore minerals occur as
Jan 1, 1973
-
Pressure Leaching of a Manganese Ore Part I: Kinetic AspectsBy Woodcock J. T
When an aqueous suspension of pyrite and manganese ore reacts with oxygen, manganese is dissolved by the ferrous sulphate and sulphuric acid produced by the oxidation of pyrite. The kinetics of certai
Jan 1, 1958
-
GET: A Function for Preferential Site Selection of Additional Borehole DrillingBy M. Sharafodin, A. A. Hassanipak
Abstract - The essential aims of additional borehole drilling are to improve the reliability of grade and tonnage estimates in each reserve class and to increase ore tonnages. The "GET" function prese
Jan 1, 2004
-
Numerical Simulation Of Quasi-Static Pile Load TestBy N. Q. Huy
This paper describes the application of finite element analysis to simulate the static and quasi-static pile load tests in different drainage conditions. The possible effect of excess pore water press
Jan 1, 2006
-
Simulation and Analysis of Media Behaviour in the Tower Mill by Discrete Element Method for Estimating the Power Draw and Spatial Distribution of Grinding ProcessSimulation and Analysis of Media Behaviour in the Tower Mill by Discrete Element Method for Estimating the Power Draw and Spatial Distribution of Grinding Process The trends to the Tower Mill (TM) fo
Sep 13, 2010