Search Documents

  • SME
    Improving Power Plant Performance And Reducing Emissions Through The Use Of Pneumatic Dry Cleaning For Low Rank Coal

    By R. J. Snoby, J. K. Alderman

    Although once fairly common as a method of coal preparation in the United States, dry cleaning has virtually disappeared. Low-rank coals used for power generation in the western U.S. are suited for dr

    Jan 1, 2001

  • AUSIMM
    Effects of DA as a Grinding Aid on Selective Grinding of Low-Grade Bauxite

    Effects of DA as a Grinding Aid on Selective Grinding of Low-Grade Bauxite Effects of DA (a copolymer of acrylic acid and acrylamide) as a grinding aid on selective grinding of low-grade bauxite were

    Sep 13, 2010

  • AUSIMM
    The Phased Metallurgical Upgrade Strategy at Gold Fields Limited South African Operations

    By A B. Phillips

    This paper details the approach adopted to upgrade the current metallurgical facilities at both the Driefontein and Kloof Gold Mines in the Republic of South Africa. Goldfields Ltd operates eight meta

    Jan 1, 2003

  • AUSIMM
    Pulverizing Goals

    Brief descriptions of several types of unit pulverizeI' are given and the functioning of the components that crush, carry, dry and classify the coal is considered. A distinction is drawn between

    Jan 1, 1957

  • SME
    Simulation of Material Transport in a SAG Mill with Different Geometric Lifter and Pulp Lifter Attributes Using DEM Mining, Metallurgy and Exploration

    By Alejandro Gutiérrez, David Ahues, Paola Merino, Felipe González

    A Discrete Elements Method (DEM) study of load movement within a SAG mill 12,192 × 7620 (40′ × 25′) in normal operating conditions is performed. The purpose is to determine how the geometry of the lif

  • RMCMI
  • NIOSH
    MLA 55-85 - Mineral Resources Of The Jacumba Study Area, Imperial County, California ? Summary

    By Edward L. McHugh

    The study area, which comprises 28,443 acres within the Jacumba Wilderness Study Area, is in the California Desert Conservation Area, and along the U.S.-Mexico border 25 miles west of Fl Centro, CA. T

    Jan 1, 1985

  • AUSIMM
    Modern Prospecting on an Industrial Scale

    MR. W. E. WAINWRIGHT occupied the chair, and in introducing the lecturer said, on account of the absence of the vice-president, it fell to his lot to introduce the lecturer. Mr. Tennberg, he said, was

    Jan 1, 1930

  • ISEE
    What We Learned While Determining VOD’s in Underground Small Hole Blasting

    By Scott Rosenthal, Kyle Murphy

    This paper discusses the trials and tribulations of obtaining Velocity of Detonation (VOD) readings in small diameter blast holes in an underground mine. Montana Technological University (Montana Tech

  • AUSIMM
    The Structural Evolution of the Hyde-Macraes Shear Zone at Round Hill, Otago, New Zealand

    The Hyde Macraes Shear Zone (HMSZ) is an extensive low angle semibrittle mineralised structure in the Otago Schist Belt, New Zealand. The shear zone is located on the lower limb of a late metamorphic

    Jan 1, 1992

  • AUSIMM
    Variations between Tectono-Sedimentary regimes during collision zone evolution: The Markham Suture Zone, Papua New Guinea

    By Crook KAW

    New sedimentological and biostratigraphic data indicate that the Leron Formation in the Markham Suture Zone, Papua New Guinea (PNG) represented Pleist- ocene alluvial fan-delta deposition in shall

    Jan 1, 1991

  • SME
    American Mining Hall Of Fame - American Mining Hall Of Fame To Induct Four Mining Greats

    The 28th annual American Mining Hall of Fame Awards Banquet and fundraiser sponsored by the Mining Foundation of the Southwest will be held at the Marriott University Park Hotel, Tucson, AZ on Saturda

    Jan 1, 2010

  • IIMP
    Proceso Chapi, alternativa para la lixiviaciÓn de sulfuros secundarios de cobre con sal en medio ácido

    By Victor Benavente

    La lixiviación es un proceso hidrometalúrgico que permite obtener el cobre de los minerales que lo contienen, aplicando una disolución de ácido sulfúrico, agua y agentes oxidantes. Este proceso consis

    Sep 12, 2011

  • DFI
    Experiences From The Italian High Speed Rail Network AV Construction

    By Vincent Jue

    In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.

    Jan 1, 2010

  • CIM
    Improving reliability and productivity at Syncrude Canada Ltd. through materials research: past, present, and future

    By S. Hoskins, S. Chiovelli

    "The annual budget for the repair and maintenance of equipment at Syncrude Canada Ltd. is in excess of $450 million. Of this amount, a significant portion can be attributed to the loss of material on

    Jan 1, 2004

  • CIM
    Application of a kinematically admissible velocity field to the analysis of the arching phenomena in backfills

    By F. P. Hassani, H. B. Poorooshasb

    "A kinematically admissible velocity field is applied to study the arching phenomenon in a cohesionless granular backfill placed between two rough vertical inflexible walls. The study is different fro

    Jan 1, 1989

  • SME
    Alaska Way visit highlights Megaprojects conference in Seattle

    When defining a ?megaproject,? one need only to look at Seattle, WA?s State Route 99 Alaskan Way Viaduct replacement project. This $3.1-billion project is one of the largest of its kind in the world,

    Dec 1, 2013

  • NIOSH
    RI 9426 - Dust Considerations When Using Belt Entry Air to Ventilate Work Areas

    By Robert A. Jankowski, J. Drew Potts

    In this U.S. Bureau of Mines study, four underground respirable dust surveys were conducted to determine factors affecting belt entry dust levels and how using belt air to ventilate work areas affecte

    Jan 1, 1992

  • AUSIMM
    A Brief History of Filtering Practive at Risdon

    Filtration of pulps of varying densities is an essential operation in the hydro-metallurgical production of zinc. The use of filters naturally applies only to the "wet" plants, and in these

    Jan 1, 1949

  • SME
    Manhattan Shaft, New York City Water Tunnel No. 3

    By Edward (Ted) M. Dowey

    Shaft 26B of New York City’s Third Water Tunnel was constructed by Frontier-Kemper Constructors, Inc. of Evansville, Indiana. The 176.8 m (580 ft) deep shaft will serve as the construction shaft for t

    Jan 1, 1997