    OFR-93-76 Research Study Of Retreat Surface Area Mining Systems ? Introduction

    1. Proposals were submitted to the Western Administrative Center of the US Bureau of Mines, Denver, Colorado on 30th December, 1974 and Contract No J 0255003 was awarded, the effective date being 8th

    Jan 1, 1976

  • CIM
    Modeling the Dynamic Mechanical Behaviour and Texture Evolution of Additively Manufactured Alsi10mg_200c

    By Mohsen Mohammadi, Edward Cyr

    "To date, several studies have been performed on the static mechanical properties of SLM-AlSi10Mg alloy. There have also been more recent studies on the relation between scan strategy, texture, and me

    Jan 1, 2018

  • AIME
    Iron and Steel Makers Visit Birmingham

    By AIME AIME

    THE week, of April 5 will long be remembered by those that attended the Birmingham meetings of the Open-Hearth and Blast Furnace committees of the A.I.M.E. Iron and Steel Division. Birmingham iron and

    Jan 1, 1937

  • NIOSH
    OFR-97-82 Cost And Sensitivities Analysis For Uranium In Situ Leach Mining

    By George W. Toth

    Uranium in situ leach mining has recently emerged as a viable alternative to conventional miring techniques. The cost implications of in situ mining are therefore of increasing interest to mining para

    Jan 1, 1981

  • NIOSH
    OFR-73-77 Longwall Mining Communications - I. Executive Summary ? A. Objective Of Work

    By Martyn F. Roetter

    The objectives of the work described in this report are to determine the communications requirements and need for communications, both for voice and control, on longwalls, and to make recommendations

    Jan 1, 1976

  • NIOSH
    RI 3070 A Study of Falls Of Roof and Coal in Mines in the Number 8 Field of Eastern Ohio

    By L. N. Plein, J. W. Paul

    "The United States Bureau of Mines, in the interest of the prevention of injuries and fatalities in coal mines, has engaged in a study of the circumstances and conditions under which falls of roof and

    Mar 1, 1931

  • TMS
    Preliminary Assessment of Mercury Contamination Due to Gold Mining in the Rio Ramis-Lake Titicaca Watershed, Peru

    By Christopher Gammons

    In developing countries throughout the world, gold ores are being processed by mercury amal-gamation, a technique long banned in the U.S. - unless a retort operation is used for mercury recovery - due

    Jan 1, 2003

  • AUSIMM
    Notes on the Working of the MacArthur-Forrest Process for Extracting Gold

    In redesigning the cyanide plant at Mount Torrens, in conjunction with Mr. L. W. Grayson, the manager, several minor alterations were introduced in order to have the operations under thorough control,

  • SME
    Geologic study of gravels of the Agua Fria River, Phoenix, AZ

    By William H. Langer

    The annual consumption of sand and gravel aggregate in 2006 in the Phoenix, AZ metropolitan area was about 76 Mt (84 million st) (USGS, 2009), or about 18 t (20 st) per capita. Quaternary alluvial dep

    Jan 2, 2010

  • CIM
    Is Your Management Control Loop Functioning

    By John D. Campbell

    "IS YOUR MANAGEMENT CONTROLLOOP FUNCTIONINGMineral processors make use of hundreds of control circuits in their mills, process plants, smelters and refineries, to optimize throughput and recovery and

    Jan 1, 1985

  • AUSIMM
    Mining Methods at Mount Morgan Limited, Mount Morgan, Queensland

    By Patterson B. G

    The small party of mining men who formed the original Mount Morgan Syndicate in 1882, commenced operations on the top of the mountain with what were practically nothing more than small hillside quarri

    Jan 1, 1939

  • SME
    Mines of Today Educating Minds of Tomorrow

    By Dan Witkowsky

    Beginning on June 11, 2007, as many as 36, kindergarten-to-grade-12 (K-12) teachers will participate in a program designed to educate them all about the mining industry. The 39th Annual A Total Concep

    Jan 1, 2007

  • SME-ICGCM
    Clay Veins: Their Physical Characteristics. Prediction, and Support

    By Frank E. Chase

    Clay veins, also referred to as clay elastic dikes, have been responsible for numerous underground injuries and fatalities. These hazardous structures are also responsible for increased production cos

    Jan 1, 1984

  • CIM
    Recovery of Lanthanides from Apatite Phosphogypsum

    By Cz. Mora, A. Pawelczyk, D. Hreniak, P. Nowak, A. Dyonizy, S. Strek, W. Strek, K. Grabas, A. Ostrowski

    Globalization and a growing demand for limited raw material resources have forced changes in the approach to the supply chain. This is particularly true in the case of rare earths, which are regarded

    Jan 1, 2014

  • CIM
    Development of the automatic GO-60 drill

    By R. England

    "This paper describes the objectives and design parameters for the operation of a computerized In-The-Hole (I. T.H.) Drill. The principal objective is to add computer control to an Inco 00-60 I. T.H.

    Jan 1, 1987

  • NIOSH
    RI 2977 Rock barriers for coal mines

    By G. S. Rice, H. P. Greenwald, H. C. Howarth

    """Rock-dust barriers""5 as they are termed in this country, are for the purpose of confining a coal-dust mine explosion to the limited area in which it originates. These barriers were first tested in

    Jan 1, 1930

  • AUSIMM
    Estimating Mine Operating Costs - Trials and Tribulations

    The projection of operating costs for mining, processing, and other site operating costs is an exercise which can be fraught with considerable peril. Not only are the physical characteristics of eac

    Jan 1, 1990

  • NIOSH
    Bulletin 36 Alaskan Coal Problems

    By Walter L. Fisher

    The public interest in the Alaskan situation is such that, with the consent of the President, I have concluded, at the request of the American Mining Congress, to make at this time a candid, if somewh

    Jan 1, 1911

  • ISEE
    Shotplus - Blast Designs in a Windows Environment

    By Brad H. A Brown, J Paul Tidman

    To design a blast, one must give consideration to safety, economics, geometry, geology, production needs, and a variety of other requirements. To compare designs requires the time to develop alternati

    Jan 1, 1997

  • AUSIMM
    The Role of the Exploration Geologist in the Initial Establishment of Harmonious Landowner Relations

    Two events during the past decade have combined to effectively alter the role of the geologist working in Papua New Guinea. The gold boom of the 1980s resulted in a substantial increase in the gen

    Jan 1, 1991