Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Circulation of Sodium Sulfate Solution Produced During NiMH Battery Waste Processing Mining, Metallurgy and ExplorationBy Antti Porvali, Vivek Agarwal, Mari Lundström
Hydrometallurgical recovery of rare earth elements (REE) from NiMH battery waste can be performed using sulfuric acid leaching followed by selective precipitation as double salt (REENa(SO4)2·H2O) by a
-
Study On The Recycling Of Valuable Metals In Spent Al2O3-Based CatalystBased on X-ray phase analysis and exploratory experiments, a new technology was developed to recycle multiple valuable elements in spent Al2O3-based catalyst. The experimental results showed that afte
Jan 1, 2007
-
Development Of Stillwater Mining Company's East Boulder Project Using Tunnel Boring TechnologyBy C. Alexander
Stillwater Mining Company is developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in south central Montana. A 5650 meter (18,
Jan 1, 1999
-
Jabali / Yanbu – A New Source Of Zinc In The Middle East (fe9d2734-cc3c-4ef2-b8ec-54ed953ef19a)By K. M. Stone, N. J. G. Masson, A. C. Woollett
The Jabali zinc deposit, in Yemen, contains at least 9.4 Mt at a grade of 10.7% zinc, 2.2% lead and 77g/t silver. The zinc occurs as smithsonite with minor hydrozincite. The Jabali ore does not produc
Jan 1, 2002
-
More Than 1,200 Exhibitors on Hand at MINExpo 2004By Georgene Renner, William R. Yernberg, Steve Kral
Allmand exhibited its LSC 100Light Sequence Commander, the mining industry’s first automatic lighting and command control system. The system is available with all of Allmand’s portable light towers.
Jan 1, 2004
-
Shaft Sinking on the MetroWest Water Supply Tunnel ProjectBy A. J. Stewart, M. Guay, J. W. Critchfield, A. P. Hoddeson
The MetroWest Water Supply Tunnel project includes three main work shafts, excavated primarily in rock. Shaft L is 9.8 m (32 ft) diameter and 124.1 m (407 ft)deep. Shaft E is 7.0 by 12.8 m (23 by 42 f
Jan 1, 1999
-
Roof Bolter Rocker Pad Deflector SystemsBy Arnold Hammons
Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby
Jan 1, 2009
-
Research Needs In Subsidence Abatement Over Abandoned MinesBy Richard E. Gray
The Office of Surface Mining Reclamation and Enforcement (OSM) is preparing an Abandoned Mined Lands Reclamation Control Technology Hand- book. (l) GAI Consultants, Inc. , recently prepared Chapter 2
Jan 1, 1982
-
Direct Pressure Alkaline Leaching of Scheelite Ores and Concentrates Mining, Metallurgy and Exploration (Springer)By António Fiúza, Anthony Danko, Patrícia Leitão, Aurora Futuro, Cristina Vila, Lurdes Dinis
The average global recovery rates for processing scheelite ores by physical methods are normally in the range 50 to 70%, and it is problematic to attain a minimum grade of 60% WO3 in the concentrates
-
Effects of Early Strength Agent on Macro-Mechanical Properties and Microstructure of Gangue-Cemented Paste BackfillGangue-cemented paste backfill (GCPB), is a well-established green mining technology and significantly improves the recovery rate of mineral resources, prevents mine dynamic disasters, reduces surface
Jan 7, 2020
-
Mining Production In Monte Negro And Its Effects On The Living EnvironmentBy M. Gomilanovic
The Republic of Monte Negro (a member of the Serbia and Monte Negro federation) has 26 different mineral raw materials, 4 of which are recoverable and 22 unrecoverable. At present, 12 types of mineral
Jan 1, 2003
-
International Standards in Public Participation in Financing Oil and Gas Pipelines: The Transparency of Risk Management Measures and Emergency Response PlansBy E. Nickel
"Bi- and multilateral banks as well as export credit agencies in the OECD countries, but also numerous commercial banks, last year committed themselves to compliance with the World Bank’s standards. T
Jan 1, 2005
-
Gathering And Managing Environmental Quality Data For Mining Projects - Preprint 09-005By D. W. Rich
An environmental management system (EMS) is a key part of a company?s environmental stewardship. Procedures and practices to continually improve environmental performance can provide great benefits in
Jan 1, 2009
-
3-D Piping Design Speeds Impala Refinery ProjectBy Ian Martin
A precious metals refinery’s switch to personal computer-based, three-dimensional piping design saved many hours in the design of a South African precious metals refinery. Bateman Minerals and Ind
Jan 1, 2000
-
Application Of Background Oriented Schlieren (BOS) For The Qualitative Analysis Of Flow Through A RegulatorThe schlieren technique describes an optical analysis method designed to enhance light distortions caused by air movement. The ability to visualize air flow has significant implications for analyzing
Jan 1, 2011
-
Performance Comparison of Real-Time Light Scattering Dust Monitors Across Dust Types and Humidity Levels Mining, Metallurgy and ExplorationBy Donald P. Tuchman, Justin R. Patts, Emanuele G. Cauda, Andrew B. Cecala, Elaine N. Rubinstein
Video techniques for monitoring exposure, such as NIOSH’s “Helmet-CAM,” employ both real-time dust monitors and mobile video cameras to assess workers’ respirable dust exposures. Many real-time person
-
Performance Comparison of Real-Time Light Scattering Dust Monitors Across Dust Types and Humidity Levels Mining, Metallurgy and Exploration (822ee1d1-598a-49fd-803c-4aba5d62e4bf)By Donald P. Tuchman, Justin R. Patts, Emanuele G. Cauda, Andrew B. Cecala, Elaine N. Rubinstein
Video techniques for monitoring exposure, such as NIOSH’s “Helmet-CAM,” employ both real-time dust monitors and mobile video cameras to assess workers’ respirable dust exposures. Many real-time person
-
Influence of Iron Ore Sinter Base Mix Fines (− 0.150 mm) Size on Mineralogy and Physical and Metallurgical Properties of the Sinter - Mining, Metallurgy & Exploration (2021)By M. SIDDARAJU, Rameshwar Sah, T. Umadevi, K. S. SRIDHARA, B. D. Ganesh Shetty, M. RAJU
The production of high strength iron ore sinter for blast furnace iron making unit was developed by optimizing the granulometry of less than − 0.150 mm fines in sinter base mix which consists of iron
Oct 16, 2021
-
Tunnel Boring Machine DevelopmentBy Martin Herrenknecht
Tunnel boring machine (TBM) development continues to take on not only larger diameters, but also more difficult ground conditions. Ground conditions consisting of unstable faces with water pressures u
Jan 1, 2008
-
The Economics of Silver and the MinerBy Hugh Douglas
In the past two years recent increases in silver prices over levels that prevailed for many years have changed supply/demand patterns. On the supply side, a silver mining boom is in progress in the Un
Jan 1, 1981