Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022By Adam Bedell, Jack Raymer, Brad Crenshaw
Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There
Dec 1, 2022
-
Implementing BIM Underground on Progressive Design-Build Atlanta Plane Train West Extension Project - NAT2022By Jeff Fontana, Daniel Ebin, Eric Westergren, William Currier
The PMott MacDonaldlane Train Tunnel West Extension (PTTWE) Project at HartsfieldJackson Atlanta International Airport includes the extension of the existing automated people mover system and terminal
Dec 1, 2022
-
Transitioning from Mixed-Face Conditions to Hard Rock During TBM Launch on the Reedy River Basin Sewer Tunnel Project— Greenville, SC - RETC2021By Horry Parker Jr, Jason Gillespie, Justin Kolster, Stephen O’Connell
Construction of the 5,932-ft Reedy River Basin Sewer Tunnel in Greenville, SC was marked by a critical transition from drill-and-blast mining in mixed-face conditions to TBM excavation with limited ro
Jun 13, 2021
-
Influence of Large Deep Excavations on Closely Underlying Subway Tunnels and Design of Mitigation Measures - RETC 2021By Giuseppe Gaspari, Xiangrong Wang
The pandemic emergency is forcing transit agencies to define strategies allowing social distancing, which are more challenging in underground interchange stations in crowded downtown cores. Toronto Tr
Jun 13, 2021
-
Micro Seismic Monitoring and Analysis for Rock Burst Prone Tunnels Utilizing TBMsBy G. A. Rosario, G. Peach
Twin 8.5 m diameter, 10 km long headrace tunnels under overburdens of up to 1870 m were excavated for the neelum jhelum hydroelectric project in north-eastern pakistan using two main beam gripper tunn
Dec 1, 2022
-
Segment Design for Exceptional Circumstances: Post Tensioning and Squeezing Ground - RETC2021By Eduardo Velasco, Paz Navarro, Alfonso Navarro, Claudio Cimiotti, Alejandro Sanz, Nick Karlin
The LA Effluent Outfall tunnel is a 7-mile long, 18' internal diameter, secondary treated effluent discharge tunnel currently under construction by Dragados USA for the Los Angeles County Sanitation D
Jun 13, 2021
-
Ground Freezing Deep Shaft Excavation Shaft 17B-1 New York City Water Tunnel No. 3 New York, New York - RETC2023By Andrew Chegwidden, Tara Wilk
Construction of Shaft 17B-1, a part of The New York City water supply system, required an excavation of approximately 38 m (123 ft) through water-bearing overburden soil and more than 152 m (500 ft) o
Jun 13, 2023
-
Planning for State-of-Good Repair, Hazard Mitigation, and Resiliency for San Diego County Water Authority’s 2nd Aqueduct Water Supply Infrastructure - RETC2023By Paul Taurasi, Mahmood Khwaja, Anjuli Corcovelos, William Brick
California’s San Diego County Water Authority provides a safe and reliable water supply to more than 3.3 million residents through twenty-four member agencies. The 2nd Aqueduct pipelines, a critical i
Jun 13, 2023
-
The Woodsmith Project—Construction of the Access Shaft at Lockwood Beck Using Innovative Blind Boring Technique - RETC2023By Cameron Dunn, Callum Fryer, Carmen Hu, Craig Sewell, Peter Stakne, Andrew Raine
The Woodsmith Project is located in north-eastern England within the North York Moors National Park. The strata contains the world’s largest known high-grade Polyhalite resource of around 2.66 billion
Jun 13, 2023
-
Tunneling for High-Energy Physics in Menlo Park, CA - RETC2023By Irene Bendanillo, Canon Cheung, Justin Lianides, Derek Penrice
The SLAC National Accelerator Laboratory’s two-mile-long particle accelerator generates the world’s brightest X-rays from its Linac Coherent Light Source (LCLS) freeelectron laser. This facility has d
Jun 13, 2023
-
Identifying The Location And Size Of An Underground Mine Fire With Simulated Ventilation Data And Random Forest Model - SME Annual Meeting 2022By L. Zhou, D. Bahrami, Y. Xue
Underground mine fires are a threat to the safety and health of mine workers. The timely determination of the location and size of an underground fire is of great importance in developing firefighting
Mar 2, 2022
-
Development of an equation describing signature waveform based on the Fourier series for blast vibration prediction - SME Transactions 2012By B. T. Lusk, J. J. Silva Castro
Currently, there are several methodologies to assess ground vibrations from blasting. Of all available methodologies, one that is becoming more important is the waveform superposition or signature hol
Jan 1, 2012
-
Rethinking The Use Of New Technology To Improve Operational Performance (13251a42-ddff-4e35-aaa8-74bfac714dd9)By B. Cavender
Investments in new technology are often intended to improve the production or cost performance of existing operations. The economics used to justify these projects can be flawed, however, if they do n
Jan 1, 1999
-
Microscopic Digital Image Analysis Of Gold Ores: A Critical Test Of Methodology, Comparing Reflected Light And Electron MicroscopyBy E. Berrezueta
Automatic digital phase imaging should yield unbiased and representative characterizations of gold ores. However, this is not a simple tusk due to low gold grade, fine grain size, possible complex min
Jan 1, 2003
-
Application of Large Diameter Single-Bore Tunnel for Subway Systems - NAT2022By Silas Li, Michael Harris-Gifford, Jason Choi, William H. Hansmire
Twin-bore tunnels with a single track in each tunnel are currently the most common subway tunnel configuration. However, a large diameter single-bore tunnel with two tracks separated by a center wall
Dec 1, 2022
-
Construction of the Plymouth Tunnel by SEM Based on a Permanent Shotcrete Liner for The Purple Line Project in Maryland: A Case Study - RETC2021By Nicholas Tabor, Norbert Fuegenschuh, Richard Taylor, Jean-Marc Wehrli
The Plymouth Tunnel forms part of the 16-mile long route of the Purple Line Light Rail Project promoted by the Maryland Transit Administration. The tunnel is approximately 1,220 feet in length with a
Jun 13, 2021
-
Tunnel Vision: Planning a Resilient 21st Century Wastewater System for Houston - RETC2021By Brian Gettinger, Jared Barber, Richard Weatherly, Shannon Dunne, Jeff Masek, Chuck Wolf, Fazle Rabbi, Jack Canfield
During Hurricane Harvey over 60% of the 39 WWTPs, including the low-lying 25 MGD Sims North WWTP, and one third of the 382 lift stations owned and operated by the City of Houston were flooded resultin
Jun 13, 2021
-
Roasting of a Low-Grade Goethite Ore Using Horse Residue and Its Beneficiation by Magnetic Separation "Mining, Metallurgy & Exploration (2020)"By Mahmut Altiner
In the present study, the use of horse residue as an alternative reducing agent in the roasting of a low-grade goethite ore containing 17.60% Fe was investigated. Additional roasting experiments were
Jun 3, 2020
-
Modern Visualization to Aid in Communication of Mine Planning UncertaintyBy Chris Roos
The mining industry has made strides in planning for operations to be safe for the workforce and public, to protect the natural environment, and to maximize value for shareholders. However, many of th
Jun 25, 2023
-
Ore Control Data Driven Method for Estimating the Bulk Ore Sorting Value at Base Metal Open Pit MinesBy Miguel Carrera, Jose Arnal, Julian Ortiz, Maarten Haest, Fouad Faraj
ShovelSense is a complete solution for bulk ore sorting at the mine face that combines robust shovel bucket mounted X-ray fluorescence sensors, with real-time material classification, fleet management
Jun 25, 2023